BLASTING

BLASTING&&PAINTING
PAINTINGREPORT
REPORT
Client : PT. PUPUK ISKANDAR MUDA Report No. : BPR-AT-RP-06
Project : PEMBANGUNAN TANGKI AMMONIA Project No. : P05-001/09-23
Drawing No. : PA-6442-T2-DW-64FB2002.1-2005-R-IFA Page : 1 of 4
Item name : BOTTOM PLATE AMMONIA TANK (EXTERNAL)

SURFACE PREPARATION
BLASTING STANDART : SSPC SP 10 TESTEX O FILM
INITIAL RUST GRADE : A
ABRASIVE MATERIAL : STELL GRID
ROUGHNESS PROFILE : 74 mm
WEATHER CONDITION
FINE CLOUDY RAIN ✘ CLEAR
A. MICROCLIMATE READINGS (ISO 8502-4)
Check Item Specs. / Time 9:00 AM 2:00 PM REMARKS
Air (Dry Bulb) Temp. (°C) 20 To 35 34.1 32.5
Wet (Bulb) Temp. (°C) - 26.8 26.7
Relative Humidity (%) 85 Max 56.9 63.8
Dew Point Temp. (°C) 3-5 Below St 24.3 24.7
Steel Surface Temp. (°C) 3-5 Above DP 33.2 31.2
B. PAINTING SPECIFICATION
LAYER NO. DATE BRAND BATCH NUMBER TYPE DFT (µm) COLOR / RAL
PRIMER 16/4/2024 JOTUN 2736749-1 EPOXY POLYAMINE 100 BLACK
-
FINISH COAT 17/4/2024 JOTUN 2736749-1 EPOXY POLYAMINE 100 BLACK
C. RESULTS
DFT CHECK ( mm )
DESCRIPTION MARK Qty (ea) REMARKS
PRIMER INTERMEDIATE FINISH
123 242
111 243
BOTTOM PLATE OBP09 4 124 258 Acc
119 253
118 254

101 208
100 209
BOTTOM PLATE OBP10 1 109 210
110 211
104 212

104 208
105 209
BOTTOM PLATE OBP11 1 104 210
110 211
108 212

105 208
107 209
BOTTOM PLATE OBP12 2 102 210
106 211
110 212

108 208
105 209
BOTTOM PLATE OBP13 2 100 210
108 211
109 212

TOUCH UP
VERIFIED N/A
Inspected by Checked by Witnessed by / Reviewed by

Achmad Adnan AL. Irianto


Date : 22-04-2024 Date : 22-04-2024 Date : Date :
F7.5-30 Rev.0
PAINTING INSPECTION REPORT : BPR-AT-RP-06

16-04-2024 16-04-2024

AFTER BLASTING CLEANLINESS

16-04-2024 16-04-2024

TESTEX O FILM ROUGHNESS PROFILE 74 µm

15-04-2024 15-04-2024

PENGUARD UNIVERSAL PART A PENGUARD UNIVERSAL PART B


PAINTING INSPECTION REPORT : BPR-AT-RP-06

16-04-2024 16-04-2024

AFTER PRIMER DFT PRIMER 123 µm

16-04-2024 16-04-2024

DFT PRIMER 111 µm DFT PRIMER 124 µm

25 - 12 - 2020
16-04-2024 16-04-2024

DFT PRIMER 119 µm DFT PRIMER 118 µm


PAINTING INSPECTION REPORT : BPR-AT-RP-06

17-04-2024 17-04-2024

AFTER FINISH DFT FINISH 242 µm

17-04-2024 17-04-2024

DFT FINISH 243 µm DFT FINISH 258 µm

17-04-2024 17-04-2024

DFT FINISH 253 µm DFT FINISH 254 µm