You are on page 1of 1

MANGAUNG

METRO MUNISIPALITEIT
OFFICE OF THE CITY MANAGER
KANTORE VAN DIE STAD BESTUURDER
METRO MUNICIPALITY

SEE DRAWING : 127-CIV-BRT-RDS-901-REV 01 (ROAD TYPICAL CS SHT 1 of 2)


CONTRACT 2 CONTRACT 1
FOR LAYER WORKS DETAIL
CHAINAGE 720 CHAINAGE 840 CHAINAGE 960 CHAINAGE 1080
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250
V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1413 DATUM = 1413 DATUM = 1412

1413.808

1414.134

1414.134

1413.808

1414.052

1414.341
1414.343

1414.016

1413.274

1413.592

1413.594

1413.228

1412.380

1412.721

1412.380
FINISHED FINISHED FINISHED FINISHED

1414.103

1414.285

1413.415

1412.654
GROUND GROUND GROUND GROUND

-8.050

-8.050

-8.050
-0.601

-1.001
0.000
0.601

8.050

0.000
0.601

8.050

0.000
1.001

8.050
-0.601

-8.050
-8.050

0.000
0.025

8.050
OFFSET OFFSET OFFSET OFFSET

CHAINAGE 700 CHAINAGE 820 CHAINAGE 940 CHAINAGE 1060 CHAINAGE 1180
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250
V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1414 DATUM = 1413 DATUM = 1412 DATUM = 1413

1413.668

1414.009

1413.668

1414.066

1414.392
1414.392

1414.066

1413.414

1413.732

1413.732

1413.414

1412.570

1412.870
1412.870

1412.570

1413.809

1413.969

1413.616
FINISHED FINISHED FINISHED FINISHED FINISHED

1413.872

1414.337

1413.643

1412.795

1413.745
GROUND GROUND GROUND GROUND GROUND

-8.050

-8.050

-8.050
-0.601

-1.001
0.000
0.025

8.050

0.000
0.601

8.050

0.000
1.001

8.050

-8.050

-8.021
-0.836

-8.021
0.000
0.834

8.050

0.000
0.025

8.542
OFFSET OFFSET OFFSET OFFSET OFFSET

CHAINAGE 680 CHAINAGE 800 CHAINAGE 920 CHAINAGE 1040 CHAINAGE 1160
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250

V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1414 DATUM = 1413 DATUM = 1412 DATUM = 1413
1413.571

1413.897

1413.897

1413.571

1414.081

1414.407
1414.407

1414.081

1413.552

1413.869

1413.869

1413.551

1413.157

1413.340

1413.208
1412.647

1413.011

1412.647
FINISHED FINISHED FINISHED FINISHED FINISHED
1413.843

1414.358

1413.643

1413.174
1412.953
GROUND GROUND GROUND GROUND GROUND
-8.050

-8.050

-8.051

-8.070
-0.601

-0.601

-1.001

-8.070
0.601

8.050

0.000
0.601

8.050

0.000
1.001

8.051

0.000
1.093

9.848
-8.050
-8.050

0.000
0.025

8.050
OFFSET OFFSET OFFSET OFFSET OFFSET

CHAINAGE 660 CHAINAGE 780 CHAINAGE 900 CHAINAGE 1020 CHAINAGE 1140
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250

V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1414 DATUM = 1413 DATUM = 1412 DATUM = 1412
1413.458

1413.785

1413.785

1413.458

1414.063

1414.389
1414.389

1414.063

1413.901

1414.000

1413.598

1412.815

1413.156

1412.815

1412.707

1412.887

1412.750
FINISHED FINISHED FINISHED FINISHED FINISHED
1413.699

1414.357

1413.796

1412.945

1412.938
GROUND GROUND GROUND GROUND GROUND
-8.050

-8.050

-8.050
-0.601

-0.601

-8.050

-8.050

-7.981
0.601

8.050

0.000
0.601

8.050

0.025
0.000

8.051

0.000
0.025

8.050

0.000
0.084

9.651
OFFSET OFFSET OFFSET OFFSET OFFSET

CHAINAGE 640 CHAINAGE 760 CHAINAGE 880 CHAINAGE 1000 CHAINAGE 1120
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250

V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1414 DATUM = 1413 DATUM = 1412 DATUM = 1412
1413.377

1413.684

1413.377

1414.010

1414.336
1414.336

1414.010

1414.165

1414.127
1414.145

1413.747

1412.989

1413.307

1413.307

1412.989

1412.460

1412.773
1412.773

1412.416
FINISHED FINISHED FINISHED FINISHED FINISHED
1414.309

1414.075

1413.213

1412.672
GROUND GROUND GROUND GROUND GROUND
-8.050

-8.050

-8.050

-8.050

-8.050
-8.050

-0.601

-0.601

-1.001

-1.208
0.025

8.050

0.000
0.601

8.050

0.000
0.601

8.050

0.000
1.001

8.050

0.000
0.476

9.684
OFFSET OFFSET OFFSET OFFSET OFFSET

CHAINAGE 630 CHAINAGE 740 CHAINAGE 860 CHAINAGE 980 CHAINAGE 1100
H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250 H.SCALE 1:250

V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100 V.SCALE 1:100
DATUM = 1413 DATUM = 1413 DATUM = 1413 DATUM = 1413 DATUM = 1412 GENERAL NOTES:
1. ALL DIMENSIONS IN METERS UNLESS SHOWN
1413.350

1413.643

1413.302

1413.923

1414.249
1414.249

1413.923

1414.126

1414.251
1414.259

1413.933

1413.133

1413.451

1413.451

1413.133

1412.314

1412.655

1412.291
OTHERWISE.
FINISHED FINISHED FINISHED FINISHED FINISHED 2. ALL MEASUREMENTS MUST BE CHECKED BY CONTRACTOR
PRIOR TO CONSTRUCTION.
3. ALL CIVIL WORKS SHALL COMPLY WITH STANDARD
SPECIFICATIONS.
1413.459

1414.224

1414.166

1413.387

1412.503
GROUND GROUND GROUND GROUND GROUND
-8.050

-8.050

-8.050

-8.050

-8.050
-0.601

-0.601

-1.001
0.025
0.000

8.050

0.000
0.601

8.050

0.000
0.601

8.050

0.000
1.001

8.050

0.000
0.025

9.170
OFFSET OFFSET OFFSET OFFSET OFFSET

APPROVAL STATUS: FOR CONSTRUCTION X AS BUILT


TENDER PRELIMINARY DETAIL DESIGN

CONTRACT 2 CONTRACT 1 SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO
CONTRACT DOCUMENTS ONLY. THE SUBCONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND

CROSS SECTION OF CORRELATING DIMENSIONS AT JOBSITE FOR TOLERANCE, CLEARANCE, QUANTITIES, FABRICATION
PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF HIS WORK WITH OTHER
TRADES AND FULL COMPLIANCE WITH CONTRACT DOCUMENTS.

MOSHOESHOE STREET NAME: Veeshay Nanoolal


_____________
201570294
_____________
CHAINAGE 630 - 1180 PR.NO:

DATE:
02/11/2020
_____________

SIGNATURE: ................................

ONDERWERP SUBJECT AFDELING DIVISION OPGEMEET GETEKEN SKAAL PROJECT MANAGER KODE CODE TEKENING Nr. DRAWING Nr. UIT./ISS.
MANGAUNG METRO MUNICIPALITY 29/10/20 CROSS-SECTION REVISED CHAINAGE 910 - 1210
SURVEYED DRAWN
R.KRUGER
SCALE F.FOUCHE ....................
AS SHOWN 02
OFFICE OF THE CITY 127-CIV-BRT-RDS-302
BRT MANAGER
02/09/20 ROAD RE-ALIGNED
ONTWERP NAGESIEN DATUM GLADAFRICA - MIDRAND
M.NONDALA
UPGRADE OF MOSHOESHOE STREET 24/08/18 FOR CONSTRUCTION ......... DESIGNED
M.NONDALA
CHECKED M.NONDALA
DATE
31-01-18
ED: INFRASTRUCTURE CROSS-SECTION 630 - 1180 m
OF MOSHOESHOE STREET
DATE WYSIGINGS PAR./SIG. PROJECT DIRECTOR TEKENKANTOOR/DRAWING OFFICE

You might also like