You are on page 1of 1

This option can be done for the projects too, choose from the projects window the project

levelling priority column and select number from 1 to 10 (the lower the number, the higher
the priority) that as we can level the resource for a group of projects.

 Now from tools select level resources

The levelling window will appear

Leveling Priorities:
87 | P a g e
Eng. Hussien Mostafa Ahmed

You might also like