Note:
1. CEDC shall provide the CT Cabinet and the customer
shall install on site.
2. Our team will assist in the installation of current
24.5"
transformers.
3. Installation of Current Transformers must be
simultaneously done during cable pulling activities and
tapping of cables/wires.

9.5"

BUS BAR GUTTER

M M M M M
MAIN CT
CIRCUIT BOX
BREAKER
M M M M M

BREAKER BAR GUTTER