OVER-ALL

LENGTH HEIGHT AREA OPERATION C/O ENGR. OVER-ALL TOTAL AREA REL % %
QAQC VALIDATION AS OF 3/8/2024 PRIMER TEXTURED PRIMER 1ST COAT TOP COAT INDIVIDUAL %
(m) (m) (m2) THON % (PER AREA) (PER AREA) (PER
AREA)
LOCATION REL % Percentage of
Wall Column Wall Column Completion for column Remarks
rectification

GL A/1-4' (EXTERIOR) 30.0 1.2 36.0 0.3% N/A For plastering (Opening portion) 15% 0% 3.0% 0.45%
GL 1 /A-J' (EXTERIOR) 67.8 1.2 81.4 0.6% N/A For plastering 0% 0% 6.8% 0.00%
GL A/1-4' (INTERIOR) 100% Proceed
1 RUBBER PROCESSING 1195.034 15.51%
GL 1 /A-J' (INTERIOR) 100% Proceed
GL J' / 1-4' 30.3 12.0 362.4 2.8% 88.9% Except Column GL J'/1 23% 1% 30.3% 6.97%
GL 4' / A-J' 67.1 10.7 715.3 5.4% 100% Proceed 14% 1% 59.9% 8.08%
GL A/4'-10 (EXTERIOR) 50.8 1.2 61.0 0.5% N/A For plastering 0% 0% 3.9% 0.00%
GL A/4'-10 (INTERIOR) 0% For Rectification
RUBBER MIXING (GROUND TO
2 MEZZANINE) GL 4' / A-G' 53.0 8.5 447.8 3.4% 38.5% 5 columns approved 14% 0% 1545.8096 29.0% 3.91% 11.96%
GL G' /4'-10 49.3 12.0 589.1 4.5% 0% On-going 12% 1% 38.1% 4.57%
GL 10 / A-G' 53.0 8.5 447.8 3.4% 100% Proceed 12% 0% 29.0% 3.48%
GL J' / 1-4' 30.3 12.0 362.4 2.8% 0% On-going 14% 0% 28.8% 3.89%
GL 4' / G'-J' 14.8 12.0 177.0 1.3% 0% For Rectification 14% 0% 14.1% 1.90%
3 1ST CURING AREA GL G' /4'-10 49.3 12.0 589.1 4.5% 0% For Rectification 14% 1% 1257.9056 46.8% 6.32% 13.65%
GL N/1-10 (INTERIOR) 80.8 1.2 97.0 0.7% 0% Chamfering of column 15% 0% 7.7% 1.16%
GL 1/J'-N (EXTERIOR) 27.0 1.2 32.4 0.2% N/A For plastering 15% 0% 2.6% 0.39%
GL 10/A-G' 53.0 10.5 556.0 4.2% 46.2% On-going 14% 1% 59.6% 8.04%
GL 12'/D'-H (Below Mezanine) 23.3 5.0 116.5 0.9% 0% For Rectification 0% 0% 12.5% 0.00%
4 SQZ TEST AREA GL D'/12'-17' 37.0 5.0 185.0 1.4% 0% For plastering 0% 0% 933.07 19.8% 0.00% 8.04%
GL A/10-17' (INTERIOR) 100% Proceed
GL A/10-17' (EXTERIOR) 63.0 1.2 75.6 0.6% 0% For plastering 0% 0% 8.1% 0.00%
GL 12'/D'-H 23.4 5.0 116.8 0.9% 0% For Rectification 14% 0% 18.5% 2.49%
INJECTION MOULDING AREA GL D'/12'-17' 39.8 5.0 199.0 1.5% 0% For Rectification 0% 0% 31.5% 0.00%
5 (GROUND TO MEZZANINE)
631.75 5.00%
GL 17'/D'-H 23.4 5.0 117.0 0.9% 0% For Rectification 14% 0% 18.5% 2.50%
GL H/12'-17' 39.8 5.0 199.0 1.5% 0% For Rectification 0% 0% 31.5% 0.00%
GL 17'/D'-H 23.4 5.0 117.0 0.9% 0% For Rectification 14% 0% 21.5% 2.90%
STRETCH BLOWING ROOM GL E/17'-20' 31.0 5.0 155.0 1.2% 0% For plastering 0% 0% 28.5% 0.00%
6 (GROUND TO MEZZANINE)
544 2.90%
GL 20'/D'-H 23.4 5.0 117.0 0.9% 0% For plastering 0% 0% 21.5% 0.00%
GL H/17'-20' 31.0 5.0 155.0 1.2% 0% For plastering 0% 0% 28.5% 0.00%
GL 12'/H-K' 17.0 5.0 85.0 0.6% 0% For plastering 14% 0% 21.4% 2.89%
CORE ABRADING ROOM GL H/12'-15' 22.7 5.0 113.5 0.9% 0% For plastering 0% 0% 28.6% 0.00%
7 (GROUND TO MEZZANINE)
397 2.89%
GL K'/12'-15' 22.7 5.0 113.5 0.9% 0% For plastering 0% 0% 28.6% 0.00%
GL 15'/H-K' 17.0 5.0 85.0 0.6% 0% For plastering 0% 0% 21.4% 0.00%
GL 15'/H-K' 17.0 5.0 85.0 0.6% 0% For plastering 0% 0% 34.3% 0.00%
CORE COATING ROOM GL 16'/H-K' 17.0 5.0 85.0 0.6% 0% For plastering 0% 0% 34.3% 0.00%
8 (GROUND TO MEZZANINE)
248 0.00%
GL H/15'-16' 7.8 5.0 39.0 0.3% 0% For plastering 0% 0% 15.7% 0.00%
GL K/15'-16' 7.8 5.0 39.0 0.3% 0% For plastering 0% 0% 15.7% 0.00%
GL 16'/H-K' 17.0 5.0 85.0 0.6% 0% For plastering 0% 0% 14.9% 0.00%
GL H/16'-20' 39.9 5.0 199.5 1.5% 0% Unpoured lintel beam 0% 0% 35.1% 0.00%
9 BALL COVERING 569 0.00%
GL 20'/H-K' 39.9 5.0 199.5 1.5% 0% 0% 0% 35.1% 0.00%
GL K'/16'-20' 17.0 5.0 85.0 0.6% 0% For plastering 0% 0% 14.9% 0.00%
GL 12' (G-MEZ) 22.7 5.0 113.5 0.9% 0% 0% 0% 16.3% 0.00%
GL K'/12'-20' (G-MEZ) 70.8 5.0 354.0 2.7% 0% For piling 0% 0% 50.7% 0.00%
10 2ND CURING AREA GL 20'/K'-N 21.6 9.2 197.9 1.5% 0% 0% 0% 697.756 28.4% 0.00% 0.70%
GL N/10-20' (INTERIOR) 0% Chamfering of column
GL N/10-20' (EXTERIOR) 27.0 1.2 32.4 0.2% 0% 15% 0% 4.6% 0.70%
GL 20'/E-N 63.1 10.5 662.0 5.0% 0% 0% 0% 67.5% 0.00%
GL E/20'-23 20.1 10.9 219.3 1.7% 0% 0% 0% 22.4% 0.00%
11 FELT PUNCHING 981.152 1.53%
GL 23/E-N (EXTERIOR) 63.1 1.2 75.7 0.6% 0% 15% 0% 7.7% 1.16%
GL N/20'-23 (EXTERIOR) 20.1 1.2 24.1 0.2% 0% 15% 0% 2.5% 0.37%
GL A/17-23 (EXTERIOR) 54.4 1.2 65.2 0.5% 0% 15% 0% 10.0% 1.50%
GL A/17-23 (INTERIOR) 57% 4 columns for punchlisting
12 HOT STAMPING AREA 653.369 2.35%
GL 23/A-D' (EXTERIOR) 31.1 1.2 37.3 0.3% 100% Proceed 15% 0% 5.7% 0.86%
GL E/17-23 (G-ROOF) 50.4 10.9 550.8 4.2% 0% For Rectification 0% 0% 84.3% 0.00%
CR (INT) 1 GL 16'-17'/A' 10.2 5.0 51.0 0.4% 0% For Rectification 0% 0% 8.4% 0.00%
CR (INT) 2 GL 16'-17/D 10.2 5.0 51.0 0.4% 0% For Rectification 0% 0% 8.4% 0.00%
CR (INT) 3 GL A'-D/16' 10.2 5.0 51.0 0.4% 0% For Rectification 0% 0% 8.4% 0.00%
CR (INT) 4 GL A'-D/18 10.2 5.0 51.0 0.4% 0% For Rectification 0% 0% 8.4% 0.00%
13 CANNING ROOM 606 0.00%
CR (EXT) 1 16'-17/A' 20.1 5.0 100.5 0.8% 0% For Rectification 0% 0% 16.6% 0.00%
CR (EXT) 2 GL 16'-17/D 20.1 5.0 100.5 0.8% 0% For Rectification 0% 0% 16.6% 0.00%
CR (EXT) 3 GL A'-D/16' 20.1 5.0 100.5 0.8% 0% For Rectification 0% 0% 16.6% 0.00%
CR (EXT) 4 GL A'-D/18 20.1 5.0 100.5 0.8% 0% For Rectification 0% 0% 16.6% 0.00%
GL 12'/D'-G' (MEZ-ROOF) 20.5 6.8 138.7 1.1% 0% For piling 0% 0% 21.9% 0.00%
QUALITY CONTROL ROOM GL 16/D'-G'(MEZ-ROOF) 20.5 6.8 138.7 1.1% 0% For piling 0% 0% 21.9% 0.00%
14 (MEZZANINE TO ROOF)
632.342 0.00%
GL D'/12'-16 (MEZ-ROOF) 28.0 5.9 165.2 1.3% 0% For piling 0% 0% 26.1% 0.00%
GL G'/12'-16 (MEZ-ROOF) 28.0 6.8 189.8 1.4% 0% For piling 0% 0% 30.0% 0.00%
RUBBER MIXING (MEZZANINE GL 4' / A-C' 20.9 5.1 107.0 0.8% 100% Proceed 0% 0% 50.0% 0.00%
15 TO ROOF)
214.016 0.00%
GL 10 / A-C' 20.9 5.1 107.0 0.8% 100% Proceed 0% 0% 50.0% 0.00%
GL 16/D'-G' 20.5 6.8 138.7 1.1% 0% For piling 0% 0% 23.8% 0.00%
MANAGER'S OFFICE GL 18'/D'-G' 20.5 6.8 139.1 1.1% 0% For piling 0% 0% 23.9% 0.00%
16 (MEZZANINE TO ROOF)
582.031 0.00%
GL D'/16-18' 24.0 5.9 141.6 1.1% 0% For piling 0% 0% 24.3% 0.00%
GL G'/16-18' 24.0 6.8 162.7 1.2% 0% For piling 0% 0% 28.0% 0.00%
GL 19/D'-F' 11.6 6.4 73.9 0.6% 0% For piling 0% 0% 21.4% 0.00%
SMALL TOOLS ROOM GL 20'/D'-F' 11.6 5.9 68.1 0.5% 0% For piling 0% 0% 19.8% 0.00%
17 (MEZZANINE TO ROOF)
344.945 0.00%
GL D'/19-20' 16.0 5.9 94.4 0.7% 0% For piling 0% 0% 27.4% 0.00%
GL F'/19-20' 16.0 6.8 108.5 0.8% 0% For piling 0% 0% 31.4% 0.00%
GL 19/F'-G' 8.5 6.4 54.4 0.4% 0% For piling 0% 0% 18.5% 0.00%
ELECTRICAL ROOM GL 20/F'-G' 8.5 5.9 50.2 0.4% 0% For piling 0% 0% 17.1% 0.00%
18 (MEZZANINE TO ROOF)
293.35 0.00%
GL F'/19-20' 16.0 5.9 94.4 0.7% 0% For piling 0% 0% 32.2% 0.00%
GL G'/19-20' 16.0 5.9 94.4 0.7% 0% For piling 0% 0% 32.2% 0.00%
GL G'/12'-18' 52.0 6.8 353.6 2.7% 0% For piling 0% 0% 42.1% 0.00%
GL G'/19-20' 16.0 6.8 108.8 0.8% 0% For piling 0% 0% 13.0% 0.00%
HALL WAY (MEZZANINE TO
19 ROOF) GL 18/D'-G' 20.1 6.9 138.3 1.1% 0% For piling 0% 0% 839.6 16.5% 0.00%
GL 19/D'-G' 16.0 6.9 110.1 0.8% 0% For piling 0% 0% 13.1% 0.00%
GL 20'/G'-K' 21.3 6.1 128.9 1.0% 0% For piling 0% 0% 15.3% 0.00%
TOTAL 13166.2 100.0% MAIN PRODUCTION INTERIOR PAINTING WORKS 5.4%