INTRODUCTION
Estate Construction (PTY) LTD, hereinafter referred to as the Main Contractor, was commissioned by
Ministry of Basic education, hereinafter referred to as the Employer to carry out a works contract for the
design and build contract for the proposed construction of staff houses at Popagano JSS in Sepopa.
The contractor’s Engineer carried out the inspection on the project adjacent buildings before
construction activities so that the Client can have records of building conditions before and after
completion of the project.
Purpose
The purpose of this inspection is to provide information to the client and the property owners regarding
the condition of the property surrounding the project buildings at the time of inspection before the
project commences.
Scope of inspection
The inspection comprises visual assessment of the property and to document the condition of the
property at the time of inspection.
Limitation of inspection
The inspection was limited to Readily Accessible Areas of the Buildings and Site.
Exclusions
The inspection did not include areas which were inaccessible, not readily accessible, and unsafe to
access or obstructed at the time of inspection. Obstructions are defined as any condition or physical
limitation which inhibits or prevents inspection and may include - but are not limited to – locked doors,
roofing, fixed ceilings, wall linings, floor coverings, fittings, furniture, stored articles/materials, pipe/duct
work.
Property owner and/ or om behalf of property Contractor (Estate Construction (PTY) LTD
owner:
Name: Name:
ID: Sign:
The type of construction used to build the Facebrick and cement bricks
structure (e.g. clay bricks, face bricks, plaster
bricks or cement bricks?
Figure 1 Figure 2
Figure 3 Figure 4
Figure 5
Description of Building
Interior
Figure Description
Figure 6 Figure 7
Figure 8
Description of Building
Exterior
Figure Description
Figure 1 Figure 2
Figure 3 Figure 4
Figure 5 Figure 6
Description of Building
Interior
Figure Description
4 Paintpeeling off, plaster ripped off and minor crack on bathtub wall
6 Small holes existing on the upper wall covered with paper to avoid entry of bats
into the building
EXTERIOR OF THE BUILDING(House #17)
Figure 7 Figure 8
Figure 9 Figure 10
Figure 11 Figure 12
Description of Building
Exterior
Figure Description