RINCIAN BIAYA 1. BIAYA LANGSUNG PERSONIL (RENUMERATION)
HARGA SATUAN JUMLAH HARGA
No. URAIAN Jumlah VOL. Rp. Rp. I. PERSONIL I.1 TENAGA AHLI 1 Team Leader Ahli Arsitektur/ S1 1.00 OB 1.00 24,750,000.00 24,750,000.00 2 Ahli Teknik Arsitektur 1.00 OB 1.00 18,150,000.00 18,150,000.00 3 Ahli Teknik Sipil bangunan Gedung 1.00 OB 1.00 18,150,000.00 18,150,000.00 4 Ahli Teknik Sipil Bangunan Gedung 1.00 OB 1.00 18,150,000.00 18,150,000.00
I.2 TENAGA PENUNJANG
1 Drafter 1.00 OB 1.00 8,250,000.00 8,250,000.00 2 Surveyor 1.00 OB 1.00 8,250,000.00 8,250,000.00 3 Surveyor 1.00 OB 1.00 8,250,000.00 8,250,000.00 Sub Jumlah Total I 95,700,000.00
2. BIAYA LANGSUNG NON PERSONIL (DIRECT REIMBURSABLE COST)
SATUAN HARGA SATUAN JUMLAH HARGA
No. URAIAN BIAYA (HARI/KALI) Rp. Rp. II. NON PERSONIL II.1 BIAYA KANTOR 2 Sewa Kendaraan Roda 2 1.00 Bulan 680,000.00 680,000.00 1 Biaya ATK 1.00 Bulan 2,000,000.00 2,000,000.00 3 Sewa Kendaraan laut ( lombot) 1.00 Bulan 8,000,000.00 8,000,000.00 4 Sewa kamera digital 1.00 Bulan 700,000.00 700,000.00
II.2 BIAYA PEMBUATAN DOKUMEN
1 DED ( Detail Engineering Desain) 4.00 Buku 1,400,000.00 5,600,000.00 2 EE ( Estimate Engineering ) 4.00 Buku 1,400,000.00 5,600,000.00 3 RKS ( Rencana Kerja dan Syarat- Syarat ) 4.00 Buku 1,400,000.00 5,600,000.00