Rincian Biaya Proyek Konstruksi

The document provides a budget proposal for a project consisting of 3 sections: 1) Direct personnel costs including experts, assistants, and support staff totaling Rp139.5 million, 2) Direct non-personnel costs such as office operations, transportation, and reporting totaling Rp32.5 million, and 3) A total project budget of Rp172 million.

Uploaded by

agus erwanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Rincian Biaya Proyek Konstruksi

The document provides a budget proposal for a project consisting of 3 sections: 1) Direct personnel costs including experts, assistants, and support staff totaling Rp139.5 million, 2) Direct non-personnel costs such as office operations, transportation, and reporting totaling Rp32.5 million, and 3) A total project budget of Rp172 million.

Uploaded by

agus erwanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

USULAN PEMBIAYAAN

1 BIAYA LANGSUNG

NO POSISI SATUAN VOLUME HARGA JUMLAH (Rp)


SATUAN (Rp)
A TENAGA AHLI (*sertifikasi)

1 Ahli Sipil Struktur *) Orang-Bulan 3 10,000,000 30,000,000

2 Ahli Elektrikal Mekanikal *) Orang-Bulan 3 10,000,000 30,000,000

3 Ahli Plumbing/PAB/PAK Orang-Bulan 1.5 8,000,000 12,000,000

72,000,000

B ASISTEN (Sub Profesional Staff)

1 Drafter Sipil Struktur Orang-Bulan 3 7,000,000 21,000,000

2 Drafter Elektrikal Mekanikal Orang-Bulan 3 7,000,000 21,000,000

3 Drafter Plumbing/PAB/PAK Orang-Bulan 3 7,000,000 21,000,000

63,000,000

C TENAGA PENDUKUNG

1 Admin Percetakan/Dokumentasi Orang-Bulan 3 1,500,000 4,500,000

4,500,000

*)tenaga ahli ME masih dalam konfirmasi

2 BIAYA LANGSUNG NON PERSONIL

NO URAIAN SATUAN VOLUME HARGA JUMLAH (Rp)


SATUAN (Rp)
A OPERASIONAL KANTOR selama 2 BULAN

1 Pemakaian utilitas (air,listrik,ruang,ATK) bulan *) 2 500,000 1,000,000

2 Komputer printer unit/bulan 4 500,000 4,000,000

3 Fotocopy perawatan unit/bulan 2 500,000 2,000,000

4 Internet/wifi/komunikasi unit/bulan 1 1,000,000 2,000,000

9,000,000

B TRANSPORTASI DAN PEMAPARAN selama 2 BULAN

1 Paparan dan lump sum ritasi/bulan 1 2,000,000 4,000,000

2 Transportasi ritasi 3 1,500,000 4,500,000

8,500,000

C PELAPORAN

1 Laporan Kemajuan, draft output Buku 3 500,000 1,500,000

2 Laporan Kajian (Geoteknik, Geodesi, Struktur) Buku 3 500,000 1,500,000

3 Album Gambar A2,A3 Buku 6 500,000 3,000,000

4 Laporan Akhir+Album Final (Termasuk CD) Buku 9 1,000,000 9,000,000

15,000,000
REKAP PEMBIAYAAN

NO URAIAN JUMLAH (Rp.)

1. BIAYA LANGSUNG

A TENAGA AHLI 72,000,000

B TENAGA ASISTEN AHLI 63,000,000

C TENAGA PENDUKUNG 4,500,000

SUB TOTAL - 1 139,500,000

2. BIAYA LANGSUNG NON PERSONIL

A OPERASIONAL KANTOR selama 2 BULAN 9,000,000

B TRANSPORTASI DAN PEMAPARAN selama 2 BULAN 8,500,000

C PELAPORAN 15,000,000

SUB TOTAL - 2 32,500,000

SUB TOTAL 1+2 172,000,000