REKAPITULASI HARGA PERKIRAAN SENDIRI

Paket Pekerjaan : JASA KONSULTANSI


Tahun Anggaran : PENYUSUNAN
2023 DESAIN
ENGINEERING DESAIN (DED)
KOMPLEKS BANGUNAN DAN
KAWASAN MASJID RAYA BIAYA
NO. URAIAN
SEMARANG
JASA KONSULTANSI Rp.
I BIAYA LANGSUNG PERSONIL
PENYUSUNAN DESAIN 3,296,988,878 82.00%
I.1 TENAGA AHLI ENGINEERING DESAIN (DED) 1,999,269,008 49.73%
I.2 KOMPLEKS
ASISTEN TENAGA AHLI BANGUNAN DAN 935,554,620 23.27%
KAWASAN MASJID RAYA
I.3 TENAGA PENDUKUNG / PENUNJANG 362,165,250 9.01%
SEMARANG

II BIAYA LANGSUNG KOMPLEKS BANGUNAN DAN


NON PERSONIL 723,498,000 18.00%
II.1 KAWASAN MASJID RAYA
Biaya Sewa Perlengkapan, Alat dan Bahan 414,696,000 10.31%
SEMARANG
II.2 Koordinasi / Paparan / Workshop 160,617,000 3.99%
PENYUSUNAN DESAIN
II.3 Penggandaan Pelaporan, 3D dan Maket
ENGINEERING DESAIN (DED) 148,185,000 3.69%
KOMPLEKS BANGUNAN DAN
KAWASAN MASJID RAYA TOTAL 4,020,486,878 100.00%
SEMARANG DIBULATKAN 4,021,000,000

PAGU 4,020,000,000
HARGA
HARGA HARGA SATUAN
SATUAN +
NO. URAIAN SATUAN ORG OB SATUAN Rp. TOTAL BIAYA
PAJAK
Rp. Koef Jateng (0,842)
11%

I. BIAYA LANGSUNG PERSONIL


I.1 TENAGA AHLI 13 1,999,269,008
1 Team Leader, OB 1 6.0 62,500,000 52,625,000 58,413,750 350,482,500
S2 Teknik Arsitektur,
STRA Utama
Pengalaman min 15 tahun

2 TA Arsitektur OB 1 6.0 56,750,000 47,783,500 53,039,685 318,238,110


S2 Teknik Arsitektur,
STRA Utama & Sertifikat GP & Sertifikat Pelatihan BIM
Pengalaman min 12 thn

3 TA Urban Design OB 1 4.5 41,250,000 34,732,500 38,553,075 173,488,838


S1 Teknik Arsitektur
berpengalaman di bidang Urban Design selama 10 thn
STRA Utama

4 Ahli Teknik Bangunan Gedung OB 1 4.0 53,000,000 44,626,000 49,534,860 198,139,440


S2 Teknik Sipil,
SKA Ahli Teknik Bangunan Gedung Utama & Sertifikat Pelatihan
BIM
Pengalaman min 10 tahun

5 Ahli Teknik Bangunan Gedung OB 1 3.0 53,000,000 44,626,000 49,534,860 148,604,580


S2 Teknik Sipil,
SKA Ahli Teknik Bangunan Gedung Utama
pglmn min 10 thn

6 Ahli Geoteknik, OB 1 1.5 36,500,000 30,733,000 34,113,630 51,170,445


S1 Teknik Sipil,
SKK Ahli Geoteknik Madya
pglmn min 10 thn

7 Ahli Teknik Mekanikal, OB 1 3.0 41,250,000 34,732,500 38,553,075 115,659,225


S1 Teknik Mesin,
SKA 301 Mekanikal Utama
pglmn min 10 thn

8 Ahli Proteksi Kebakaran, OB 1 2.5 33,500,000 28,207,000 31,309,770 78,274,425


S1 Teknik Mesin,
SKA Teknik Ahli Proteksi Kebakaran Madya
pglmn min 8 thn

9 Ahli Transportasi Dalam Gedung, OB 1 2.5 38,000,000 31,996,000 35,515,560 88,788,900


S1 Teknik Mesin,
SKK Ahli Utama Pesawat Lift dan Eskalator (SKA Transportasi
Dalam Gedung)
pglmn min 8 thn

10 Ahli Elektrikal OB 1 3.0 53,000,000 44,626,000 49,534,860 148,604,580


S1 Teknik Elektro / Listrik
SKK Ahli Elektrikal Konstruksi Bangunan Gedung Utama (jenjang
9)
pglmn min 10 thn

11 Ahli Lansekap, OB 1 3.0 53,000,000 44,626,000 49,534,860 148,604,580


S2 Teknik Arsitektur,
SKA Arsitek Lansekap Utama
pglmn min 10 thn

12 Ahli Arsitektur Interior, OB 1 2.5 36,500,000 30,733,000 34,113,630 85,284,075


S1 Teknik Arsitektur,
SKA Ahli Desain Interior Madya
pglmn min 10 thn
13 Ahli Quantity Surveyor, OB 1 3.0 33,500,000 28,207,000 31,309,770 93,929,310
S1 Teknik Sipil
SKK Ahli Manajemen Konstruksi Madya & Sertifikat Pelatihan QS
pglmn min 8 thn

I.2 ASISTEN TENAGA AHLI 12 935,554,620


1 Asisten Arsitek, OB 4 5.0 22,750,000 19,155,500 21,262,605 425,252,100
S1 Teknik Arsitektur,
STRA Muda
Pengalaman min. 3 (tiga) tahun

2 Asisten Ahli Teknik Bangunan Gedung, OB 2 3.0 22,750,000 19,155,500 21,262,605 127,575,630
S1 Teknik Sipil,
SKA Teknik Bangunan Gedung min Muda / SKK Teknik
Bangunan Gedung min Muda
Pengalaman min. 3 (tiga) tahun

3 Asisten Ahli Mekanikal, OB 2 3.0 22,750,000 19,155,500 21,262,605 127,575,630


S1 Teknik Mesin,
SKA Teknik Mekanikal min Muda / SKK Teknik Mekanikal min
Muda
Pengalaman min. 3 (tiga) tahun

4 Asisten Ahli Elektrikal, OB 2 3.0 22,750,000 19,155,500 21,262,605 127,575,630


S1 Teknik Elektro,
SKA Teknik Tenaga Listrik min Muda
Pengalaman min. 3 (tiga) tahun

5 Asisten Ahli Lansekap, OB 1 3.0 22,750,000 19,155,500 21,262,605 63,787,815


S1 Arsitek Pertamanan,
SKA Lansekap Muda

6 Asisten Ahli Quantity Surveyorr, OB 1 3.0 22,750,000 19,155,500 21,262,605 63,787,815


S1 Teknik Sipil
SKA/SKK Teknik Bangunan Gedung min Muda
Pengalaman min. 3 (tiga) tahun

I.3 TENAGA PENDUKUNG/ PENUNJANG 8 362,165,250


1 Drafter / Operator CAD, min. D3 OB 3 4.0 12,500,000 10,525,000 11,682,750 140,193,000
2 Surveyor (Geodesi, Geoteknik), min. D3 OB 2 2.0 12,500,000 10,525,000 11,682,750 46,731,000
3 Tenaga Design Grafis, min. D3 OB 1 3.0 12,500,000 10,525,000 11,682,750 35,048,250
4 Operator Komputer, min. D3 OB 1 6.0 12,500,000 10,525,000 11,682,750 70,096,500
5 Administrasi dan Keuangan Proyek, min. D3 OB 1 6.0 12,500,000 10,525,000 11,682,750 70,096,500
Sub Total I : Biaya Langsung Personil = 33 3,296,988,878
82.0%
JUMLAH
HARGA SATUAN PAJAK
NO. URAIAN SATUAN ORG VOL. HARGA
Rp. 11%
Rp.
I. BIAYA LANGSUNG PERSONIL
I.1 TENAGA AHLI 12 1,694,699,715
1 Team Leader, OB 1 6 38,311,000 4,214,210 255,151,260
S2 Teknik Arsitektur,
STRA Utama
Pengalaman

2 Arsitek, OB 1 6 36,627,000 4,028,970 243,935,820


S2 Teknik Arsitektur,
STRA Utama & sertifikat GP & Sertifikat Pelatihan BIM
Pengalaman

3 Arsitek 2
penglaman Urban Design
STRA Utama

4 Ahli Teknik Bangunan Gedung, OB 1 4 36,627,000 4,028,970 162,623,880


S2 Teknik Sipil,
SKA Ahli Teknik Bangunan Gedung Utama & Sertifikat
Pelatihan BIM
Pengalaman

5 Ahli Teknik Bangunan Gedung 2,


S2 Teknik Sipil,
SKA Ahli Teknik Bangunan Gedung Utama

6 Ahli Geoteknik, OB 1 2 24,207,500 2,662,825 53,740,650


S1 Teknik Sipil,
SKA Ahli Geoteknik (216) Madya,
Pengalaman min. 5 (lima) tahun

7 Ahli Teknik Mekanikal, OB 1 4 28,207,000 3,102,770 125,239,080


S1 Teknik Mesin,
SKA 301 Mekanikal Utama,
Pengalaman min. 5 (lima) tahun

8 Ahli Proteksi Kebakaran, OB 1 3 24,207,500 2,662,825 80,610,975


S1 Teknik Mesin,
SKA Teknik Ahli Proteksi Kebakaran Madya,
Pengalaman min. 5 (lima) tahun

9 Ahli Transportasi Dalam Gedung, OB 1 3 28,207,000 3,102,770 93,929,310


S1 Teknik Mesin,
SKK Ahli Utama Pesawat Lift dan Eskalator (SKA
Transportasi Dalam Gedung)
Pengalaman min. 5 (lima) tahun

10 Ahli Elektrikal OB 1 4 31,364,500 3,450,095 139,258,380


S2 Teknik Elektro,
SKA AE401 Listrik Madya
Pengalaman min. 5 (lima) tahun

11 Ahli Bangunan Gedung Hijau -- dihilangkan OB 1 4 36,627,000 4,028,970 162,623,880


S2 Teknik Arsitektur,
STRA Utama & Greenship Profesional
Pengalaman min. 5 (lima) tahun

12 Ahli Lansekap, OB 1 4 36,627,000 4,028,970 162,623,880


S2 Teknik Arsitektur,
SKA AA-103 Lansekap Utama
Pengalaman min. 5 (lima) tahun
13 Ahli Arsitektur Interior, OB 1 4 24,207,500 2,662,825 107,481,300
S1 Teknik Arsitektur,
SKA AA102 Ahli Desain Interior Madya
Pengalaman min. 5 (lima) tahun

14 Ahli Quantity Surveyor, OB 1 4 24,207,500 2,662,825 107,481,300


S1 Teknik Sipil/elektrikal/mekanikal,
SKA Ahli Manajemen Konstruksi Madya & Sertifikat
Pelatihan QS
Pengalaman min. 5 (lima) tahun

I.2 ASISTEN TENAGA AHLI 12 680,403,360


1 Asisten Arsitek, OB 2 4 19,155,500 2,107,105 170,100,840
S1 Teknik Arsitektur,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

2 Asisten Ahli Teknik Bangunan Gedung, OB 2 3 19,155,500 2,107,105 127,575,630


S1 Teknik Sipil,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

3 Asisten Ahli Mekanikal, OB 2 2 19,155,500 2,107,105 85,050,420


S1 Teknik Mesin,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

4 Asisten Ahli Elektrikal, OB 2 2 19,155,500 2,107,105 85,050,420


S1 Teknik Elektro,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

5 Asisten Ahli Lansekap, OB 2 2 19,155,500 2,107,105 85,050,420


S1 Teknik Arsitektur/ Lansekap/ Pertamanan,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

6 Asisten Ahli Quantity Surveyor, OB 2 3 19,155,500 2,107,105 127,575,630


S1 Teknik Arsitektur/Sipil/Elektro/Mesin,
Sertifikasi keahlian,
Pengalaman min. 3 (tiga) tahun

I.3 TENAGA PENDUKUNG/ PENUNJANG 9 502,358,250


1 Drafter / Operator CAD, min. D3 OB 4 6 10,525,000 1,157,750 280,386,000
2 Surveyor (Geodesi, Geoteknik), min. D3 OB 2 2 10,525,000 1,157,750 46,731,000
3 Tenaga Design Grafis, min. D3 OB 1 3 10,525,000 1,157,750 35,048,250
4 Operator Komputer, min. D3 OB 1 6 10,525,000 1,157,750 70,096,500
5 Administrasi dan Keuangan Proyek, min. D3 OB 1 6 10,525,000 1,157,750 70,096,500
Sub Total I : Biaya Langsung Personil = 33 2,877,461,325
HARGA
PAJAK JUMLAH HARGA
NO. URAIAN Satuan VOL. SATUAN
11% (Rp.)
(Rp.)
II. II. BIAYA LANGSUNG NON PERSONIL
II.1 Biaya Sewa Perlengkapan, Alat dan Bahan 414,696,000
1.1 Biaya Sewa Kebutuhan Kantor:
1.1.1. Printer (colour) unit-bln 2 6 750,000 82,500 9,990,000
1.1.2. Digital Camera unit-bln 2 6 300,000 33,000 3,996,000
1.1.3. Infocus unit-bln 1 6 500,000 55,000 3,330,000
1.1.4. Alat Tulis Kantor set-bln 1 6 2,000,000 220,000 13,320,000
1.1.5. Komputer Desktop set-bln 5 6 750,000 82,500 24,975,000
1.1.6. Laptop set-bln 2 6 1,000,000 110,000 13,320,000
1.1.7. Sewa Kend.Roda-4 unit-bln 1 6 7,500,000 825,000 49,950,000
1.2 Biaya computer suplies set-bln 1 6 1,000,000 110,000 6,660,000
1.3 Biaya Komunikasi:
1.3.1. Biaya komunikasi unit-bln 1 6 1,000,000 110,000 6,660,000
1.3.2. Biaya internet unit-bln 1 6 1,000,000 110,000 6,660,000
1.4 Biaya Mobilisasi, Sewa Alat dan Perlengkapan Survey
1.4.1 Survey Pendahuluan (GPS, Roll meter, dll) LS 1 1 15,000,000 1,650,000 16,650,000
1.4.2. Survey Topografi (GPS Geodetik, Total Station, Waterpass, Ha 2 1 10,000,000 1,100,000 22,200,000
Kamera, Patok & Benchmark, dll)
1.4.3. Survey Penyelidikan Tanah Perlokasi DED (Sondir, Boring, DCP)
dan Uji Laboratorium
1.4.3.1. Boring Titik 3 1 32,500,000 3,575,000 108,225,000
1.4.3.2. Sondir Titik 9 1 4,000,000 440,000 39,960,000
1.4.3.2. DCP Titik 20 1 250,000 27,500 5,550,000
Uji Laboratorium Titik 2 1 30,000,000 3,300,000 66,600,000
1.4.4 Survey Data Hidrologi Kawasan (Sekunder) LS 1 1 15,000,000 1,650,000 16,650,000

II.2 Koordinasi / Paparan / Workshop 160,617,000


2.1 Biaya Pembahasan Lap. Pendahuluan
2.1.1. Paket meeting half day Org-Kl 40 1 250,000 27,500 11,100,000
2.1.2. Penggandaan bahan rapat set 40 1 25,000 2,750 1,110,000
2.1.3. Uang harian peserta rapat Org-Hr 40 1 95,000 10,450 4,218,000
2.1.4. Honor Narasumber OJP 3 1 900,000 99,000 2,997,000
2.2 Biaya Pembahasan Laporan Survey dan Pra Rencana
2.2.1. Paket meeting half day Org-Kl 40 1 250,000 27,500 11,100,000
2.2.2. Penggandaan bahan rapat set 40 1 25,000 2,750 1,110,000
2.2.3. Uang harian peserta rapat Org-Hr 40 1 95,000 10,450 4,218,000
2.2.4. Honor Narasumber OJP 3 1 900,000 99,000 2,997,000
2.3 Biaya Pembahasan Laporan Desain Pengembangan
2.3.1. Paket meeting half day Org-Kl 40 1 250,000 27,500 11,100,000
2.3.2. Penggandaan bahan rapat set 40 1 25,000 2,750 1,110,000
2.3.3. Uang harian peserta rapat Org-Hr 40 1 95,000 10,450 4,218,000
2.3.4. Honor Narasumber OJP 3 1 900,000 99,000 2,997,000
2.4 Biaya FGD (2) & seminar (1) 3
2.4.1. Paket meeting half day Org-Kl 60 3 250,000 27,500 49,950,000
2.4.2. Penggandaan bahan rapat set 60 3 25,000 2,750 4,995,000
2.4.3. Uang harian peserta rapat Org-Hr 60 3 95,000 10,450 18,981,000
2.4.4. Honor Narasumber OJP 3 3 900,000 99,000 8,991,000
2.4 Biaya Pembahasan Laporan Draft DED
2.4.1. Paket meeting half day Org-Kl 40 1 250,000 27,500 11,100,000
2.4.2. Penggandaan bahan rapat set 40 1 25,000 2,750 1,110,000
2.4.3. Uang harian peserta rapat Org-Hr 40 1 95,000 10,450 4,218,000
2.4.4. Honor Narasumber OJP 3 1 900,000 99,000 2,997,000
II.3 Pelaporan, 3D dan Maket 148,185,000
3.1 Rencana Mutu Kontrak, uk A4 eks 5 1 100,000 11,000 555,000
3.2 Laporan Survey Detaill, uk A4
3.2.1 Survey Pendahuluan eks 5 1 150,000 16,500 832,500
3.2.2 Survey Detail Topografi eks 5 1 150,000 16,500 832,500
3.2.3 Survey Penyelidikan Tanah eks 5 1 150,000 16,500 832,500
3.6. Laporan Pra Rancangan, uk A3
3.6.1 Laporan Pra Rancangan Arsitektur eks 5 1 300,000 33,000 1,665,000
3.6.1 Laporan Pra Rancangan Struktur eks 5 1 300,000 33,000 1,665,000
3.6.2 Laporan Pra Rancangan MEP & IT eks 5 1 300,000 33,000 1,665,000
3.6.3 Laporan Pra Rancangan Lansekap eks 5 1 300,000 33,000 1,665,000
3.6.3 Laporan Pra Rancangan Interior eks 5 1 300,000 33,000 1,665,000
3.7. Laporan Pengembangan Rencana (Design Development)
3.7.1 Laporan Pengembangan Rencana Arsitektur, Uk. A3 eks 5 1 400,000 44,000 2,220,000
3.7.3 Laporan Pengembangan Rencana Struktur, Uk. A3 eks 5 1 400,000 44,000 2,220,000
3.7.4 Laporan Pengembangan Rencana MEP & IT, Uk. A3 eks 5 1 400,000 44,000 2,220,000
3.7.4 Laporan Pengembangan Rencana Lansekap, Uk. A3 eks 5 1 300,000 33,000 1,665,000
HARGA
PAJAK JUMLAH HARGA
NO. URAIAN Satuan VOL. SATUAN
11% (Rp.)
(Rp.)
3.7.5 Laporan Pengembangan Rencana Interior, Uk. A3 eks 5 1 200,000 22,000 1,110,000
3.7.9 Lap. draft estimasi Biaya & Spesifikasi Teknis, Uk. A4 eks 5 1 150,000 16,500 832,500
HARGA
PAJAK JUMLAH HARGA
NO. URAIAN Satuan VOL. SATUAN
11% (Rp.)
(Rp.)
3.8. Laporan Draft DED
Album Gbr Draft DED Arsitektur, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr Draft DED Struktur, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr Draft DED MEP & IT, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr Draft DED Lansekap, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr Draft DED Interior, uk A3 eks 5 1 500,000 55,000 2,775,000
Draft RAB, uk A4 eks 5 1 100,000 11,000 555,000
Draft BOQ, uk A4 eks 5 1 100,000 11,000 555,000
Draft RKS, uk A4 eks 5 1 150,000 16,500 832,500
Draft Design Note, uk A4 eks 5 1 100,000 11,000 555,000
3.9. Laporan DED
Album Gbr DED Arsitektur, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr DED Struktur, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr DED MEP & IT, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr DED Lansekap, uk A3 eks 5 1 500,000 55,000 2,775,000
Album Gbr DED Interior, uk A3 eks 5 1 500,000 55,000 2,775,000
RAB, uk A4 eks 5 1 100,000 11,000 555,000
BOQ, uk A4 eks 5 1 100,000 11,000 555,000
RKS, uk A4 eks 5 1 200,000 22,000 1,110,000
Design Note, uk A4 eks 5 1 150,000 16,500 832,500
3.10 Laporan Executive Summary eks 10 1 300,000 33,000 3,330,000
3.11 3D & Animasi Kawasan & Bangunan ls 1 1 30,000,000 3,300,000 33,300,000
3.12 (minimal VRAY(min.
Maket Kawasan HD 1080
skalapixal)
1 : 1000) unit 1 1 50,000,000 5,500,000 55,500,000
3.14 Hard Disk External 1 TB unit 1 1 1,000,000 110,000 1,110,000
SUB TOTAL II : BIAYA NON PERSONIL 723,498,000
18%
Permen PUPR 524/KPTS/M/2022 Perwal Semarang 29/2022 INKINDO 2023
REMUNERASI/BIAYA
KUALIFIKASI TENAGA Pengalaman S1 / Setara** S2 / Setara** S3 / Setara** S1 / Setara** S2 / Setara** S3 / Setara** PERSONIL PERSONIL (RP/BLN)
Sumber Dana
AHLI (Thn)
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) ASISTEN AHLI (Sub Professional) 14,650,000
1 19,500,000 26,500,000 34,250,000 APBN / KPBU 13,778,180 20,284,540 23,729,090 OPERATOR CAD/CAM 12,250,000
APBD 9,829,540 15,954,540 - OPERATOR SIG 12,250,000
AHLI MUDA
2 21,000,000 28,250,000 36,250,000 APBN / KPBU 14,926,360 21,623,630 25,260,000 PEMROGRAM PERANGKAT LUNAK 14,650,000
APBD 11,090,900 17,590,900 - PEMROGRAM BASIS DATA 14,650,000
1 3 22,750,000 30,250,000 38,250,000 APBN / KPBU 16,074,540 22,963,630 26,790,900 OPERATOR BASIS DATA 14,200,000
APBD 12,409,090 19,227,270 24,818,180 PEMELIHARA SISTEM 14,200,000
2 4 24,250,000 32,250,000 40,250,000 APBN / KPBU 17,222,720 24,302,720 28,321,810 TEKNISI JARINGAN TEKNOLOGI INFORMASI 14,200,000
AHLI MADYA
APBD 13,772,720 20,863,630 26,590,900 ADMINISTRATOR WEB 14,200,000
3 5 25,750,000 34,000,000 42,250,000 APBN / KPBU 18,370,900 25,642,720 29,852,720 DESAIN GRAFIS 14,650,000
APBD 15,136,360 - 28,363,630 TEKNISI PERANGKAT KERAS 12,250,000
1 4 6 27,250,000 36,000,000 44,250,000 APBN / KPBU 19,519,090 27,173,630 32,914,540 FASILITATOR 12,250,000
APBD 16,500,000 - 30,136,360 TEKNISI KHUSUS/INSPEKTUR KHUSUS 14,200,000
2 5 7 28,750,000 37,250,000 46,250,000 APBN / KPBU 20,667,270 28,512,720 34,445,450 TEKNISI 12,250,000
APBD 17,863,630 - - INSPEKTUR 12,250,000
3 6 8 30,250,000 39,750,000 48,250,000 APBN / KPBU 21,815,450 29,852,720 35,976,360 SURVEYOR 11,550,000
APBD 19,227,270 24,136,360 -
4 7 9 32,000,000 41,500,000 50,250,000 APBN / KPBU 22,963,630 31,383,630 37,507,270
APBD - 25,909,090 -
5 8 10 33,500,000 43,500,000 52,250,000 APBN / KPBU 24,111,810 32,722,720 39,038,180
APBD - 27,545,450 32,045,450
6 9 11 35,000,000 45,500,000 54,250,000 APBN / KPBU 25,260,000 34,062,720 40,569,090
APBD 20,590,900 - 33,818,180
7 10 12 36,500,000 47,250,000 56,250,000 APBN / KPBU 26,408,180 35,593,630 42,100,000
APBD 21,954,540 - 35,590,900
8 11 13 38,000,000 49,250,000 58,250,000 APBN / KPBU 27,556,360 36,932,720 43,630,900
APBD 23,318,180 - 37,363,630
9 12 14 39,500,000 51,000,000 60,250,000 APBN / KPBU 28,704,540 38,272,720 45,161,810
APBD 24,681,810 29,181,810 -
AHLI UTAMA
10 13 15 41,250,000 53,000,000 62,250,000 APBN / KPBU 29,852,720 39,803,630 46,692,720
APBD - 30,818,180 -
11 14 16 42,750,000 55,000,000 64,250,000 APBN / KPBU 31,000,900 41,142,720 48,223,630
APBD - 32,454,540 -
12 15 17 44,250,000 56,750,000 66,250,000 APBN / KPBU 32,149,090 42,482,720 49,754,540
APBD - 34,227,270 -
13 16 18 45,750,000 58,750,000 68,250,000 APBN / KPBU 33,297,270 44,013,630 51,285,450
APBD 26,000,000 - -
14 17 19 47,250,000 60,500,000 70,250,000 APBN / KPBU 34,445,450 45,352,720 52,816,360
APBD 27,363,630 - -
15 18 20 48,750,000 62,500,000 72,250,000 APBN / KPBU 35,593,630 46,692,720 54,347,270
APBD 28,727,270 - -
16 19 21 50,500,000 64,250,000 74,250,000 APBN / KPBU 36,741,810 48,223,630 55,878,180
APBD 30,090,900 - -
17 20 22 52,000,000 66,250,000 76,250,000 APBN / KPBU 37,890,000 49,562,720 57,409,090
18 21 23 53,500,000 68,250,000 78,250,000 APBN / KPBU 39,038,180 50,902,720 58,940,000
19 22 24 55,000,000 70,000,000 80,250,000