WTP Ranuubaze 2. Capacity 05 MD 3 Technology Cle uical T u t u t 4 Executing agency 5 Implementing agency
6 Asset owner
7 Project name under which this
WTP was constructed: 8 Name of contractor
9 Date of start of the construction
of WTP eb 10, 20olo 10. Status of work progress of WTP: (completed/ uncompleted components with %) 11.Estimated Final Cost of WTP
12. Water supply networks laid
under the project (type, dia and ength) 13. Nos, locations and capacities of Pumping station 14. Areas of different units of plant Sq.mtrs 15. Total Area of land used for WTP: 2 Auu, 16. Land ownership details: (Khasra nos. 17. O&M period of contract:
18. Status of Consent to Establish
(CTE) from Pollution Control Board: obtained/not obtained (attach copPy) 19. Validity of CTE
20. Status of Consent to Operate
(CTO) from Pollution Control Board: obtained/not obtained 21. Validity of CTO 22. Details of total covered area with thisWTP: (ward nos.) 23. Total Population covered 2,000 (numberand %): Audit Question of Existing WTP
of WTP Seb 10, 2ol0 10. Status of work progress of WTP (completed/ uncompleted components with%) 11. Estimated Final Cost of WTP
12. Water supply networks laid
under the project (type, dia and length) 13. Nos., locations and capacities of Pumping station 14. Areas of different units of plant (sq.mtrs): 15. Total Area of land used for WTP: 2 Auus 16. Land ownership details: (Khasra nos.) 17. 0&M period of contract
18. Status of Consent to Establish
(CTE) from Pollution Control Board: obtained/not obtained (attach copy) 19. Validity of CTE:
20. Status of Consent to Operate
(CTO) from Pollution Control Board: obtained/not obtained 21. Validity of CTO:
22. Details of total covered area with
this WTP: (ward nos.) 23. Total Population covered (number and %) /2,000 24. Whether trail run completed, if yes give date, if no give tentative NA date 25. What are the parameters of discharge of treated effluent 26 Is there facility of laboratory for testing these parameters, if yes, give details Ye 27. What are the proposals/methods for reuse/disposal of treated effluent from WTP 28 What are the proposals/methods for reuse/disposal of treated sludge from WTP: 29. Is this plant anywhere related/dependent on proposed WTP 30. Status and type of electricity connection: (connection number and approved load, KW 31. Whether DG set installed, if yes give capacity and type of DG set 32. Numbers of employees proposed for operation of plant To r l ! l uaseuployen. (designation wise numbers of employees 33. is rain water harvesting system established, if yes, provide details, drawing and cost of rain water hanvesting 34. Power generation system installed,if yes,give details: 35. Is O&M manual prepared by contractor (Submitted/approved) 36. Is Emergency operating system prepared for O&M: 37. Whether provisions for odour control taken in design, if yes, give details: 38. If provisions taken to protect inconvenience to nearby habitants, give details: 39. Any other related information
Source /Intake
1. Source of raw water (river/dam/Tube Well): River
2. Location of intake: 3. Capacity of intake: 4. Year of construction: 20 10 5. Average hours of operation/day a 6. Existing Conditions: Fit to use. 7. Type of pumps: Vertical Turbine Centrifugal Pumps 8. Electric Consumption: 9. Numbers of employees for operation and maintenance of Intake(designalion wise numbers of employees): 5 os Additional 10.Proposal under RUIDP Ph-IV (Irepair/additional intake/no change): 1 no. of Intake 11.If Tube wells are being used as raw water source, give following detalls Location of Tube wells Capacity of water Water taken per day discharge