Competency Assessment & Development Plan Dec 2022

IDP METRICS
Binugao Toril Actual Pending for
Employee Number: 107947 Location: Requirement 2022 Completion Completion
Employee Name: Jablos, Marty C. Date: April 18, 2022 Experience 5 0 5
Position: Field Engineer Competency Level Average Immediate Leader Rechie P. Maghari Exposure 3 0 3
Group O&M-Operated (CFB) Start of Year: #DIV/0! Next Level Leader Clint Paul C. Moiket Education 2 0 2
Department Year-End: #DIV/0! Type of IDP: Status of Completion 10 0.00% 100.00%
Therma South, Inc.
Company: Future Position:

2022
Date of
Minimum Current Proficiency
Competency Competency TM's Remarks TL's Remarks Discussion/ Actual Actual Actual
Proficiency Proficiency Level Time- Time- Time-
Key Competencies Competency Description
Level Level Level (Required field; (Required field; Validation Experience line
Comple- Status Exposure line
Comple- Status Education line
Completion Status
Level Achieved (Start of the Year) (Year-end) Year-end) Year-end) tion Date tion Date Date
(Required field;
Required (Start of the Year) (Year-End)
Year-end)
Closed Circuit Cooling Water System - Understands how 3 2 67% 0%
the closed circuit cooling water system works. Identify the
-able to observe the control
Closed Circuit Cooling Water equipment involved in the closed circuit cooling water -able to change over pumps in
Dec-2022 In-Progressroom engineers change over of Dec-2022 In-Progress
System system, its functions and specifications the DCS
pumps

Circulating Water System (Seawater Cooling) - Understands 3 2 67% 0%


the purpose and the overall process flow of the Seawater
-able to experience actual -able to attend FGD on the said
Circulating Water System Circulation System, and the principle of the condenser tube
change over of condenser outlet Dec-2022 In-Progress topic then study and learn more Dec-2022 In-Progress
(Seawater Cooling) cleaning system
valves during change over on the topic
Able to indentify the equipment involved in the seawater
circulation system and its respective functions and
specifications
Cycle Make-up and Storage System- Understands the 3 2 67% 0%
purpose of Cycle Make Up and Storage system, knows the
-able to observe the control
Cycle Make-up and Storage process flow of Demineralizer Water Supply System -able to change over pumps in
Dec-2022 In-Progressroom Dec-2022 In-Progress
System Understands the importance of the Cycle Make Up System the DCS
engineers change over of pumps
and the system it supports
Able to identify the equipment involved in the Cycle Make
Up System,
Service its System
Water functions and specifications
- Understands the components of 3 2 67% 0%
the Service Water System
-able to observe the control
Able to demonstrate the uses of the Service Water System -able to change over pumps in
Service Water System Dec-2022 In-Progressroom engineers change over Dec-2022
within the power plant environment as well as the the DCS
of pumps
operation of service water system

Sootblowing System - Demonstrates an understanding of 3 2 67% 0%


the sootblowing system used in the power plant
-able to perform sootblowing of -able to observe the control
-able to discuss in the FGD
Sootblowing System backpass and Air preheater in Dec-2022 In-Progressroom engineers Dec-2022 In-Progress
regarding the topic
the DCS perform sootblowing

Leadership TL's Rating TL's Rating Actual


Time- Comple- Time- Comple- Time-
Competency Description Experience line tion Date
Status Exposure line tion Date
Status Education line
Completion Status
Competencies* (Start of the Year) (Year-end) Date

Received by: Rated and Approved by:

Jablos, Marty C. Rechie P. Maghari


Field Engineer Supervisor

Clint Paul C. Moiket


SuperInterdent