IDP METRICS
Binugao Toril Actual Pending for
Employee Number: 107947 Location: Requirement 2022 Completion Completion
Employee Name: Jablos, Marty C. Date: April 18, 2022 Experience 5 0 5
Position: Field Engineer Competency Level Average Immediate Leader Rechie P. Maghari Exposure 3 0 3
Group O&M-Operated (CFB) Start of Year: #DIV/0! Next Level Leader Clint Paul C. Moiket Education 2 0 2
Department Year-End: #DIV/0! Type of IDP: Status of Completion 10 0.00% 100.00%
Therma South, Inc.
Company: Future Position:
2022
Date of
Minimum Current Proficiency
Competency Competency TM's Remarks TL's Remarks Discussion/ Actual Actual Actual
Proficiency Proficiency Level Time- Time- Time-
Key Competencies Competency Description
Level Level Level (Required field; (Required field; Validation Experience line
Comple- Status Exposure line
Comple- Status Education line
Completion Status
Level Achieved (Start of the Year) (Year-end) Year-end) Year-end) tion Date tion Date Date
(Required field;
Required (Start of the Year) (Year-End)
Year-end)
Closed Circuit Cooling Water System - Understands how 3 2 67% 0%
the closed circuit cooling water system works. Identify the
-able to observe the control
Closed Circuit Cooling Water equipment involved in the closed circuit cooling water -able to change over pumps in
Dec-2022 In-Progressroom engineers change over of Dec-2022 In-Progress
System system, its functions and specifications the DCS
pumps