You are on page 1of 4

Daily Sand Monitoring Report

MET-HEI/25/04/24

Ridwan
Report By Date 25 April 2024
Febdain Syahputra
Report Period 0600 hours to 1800 hours

Client Harbour Energy IND MET Job No


Installation Gajah Baru Field Natuna Block-A Gas Field
Operation Temporary ASM & OSS Well No GBA-03

Report Status

25 April 2024
0600 Well Service meeting
0700 Routing Permit
0800 install OOS and connect one ball valve before inlet chamber.
Do sampling Part 3 using 20 Micron Mesh Filter running on GBA-03 Choke :
10.00 21/64” , Gas Rate 1.56 mmscfd for 2 hours ( Result : Almost clean / Sample
indicated few amound of fine sand )
Connect ASM Pulsar & clamp on to well GBA-03 installed in 3rd Tee-bend
D/S well head. This bend is horizontal to horizontal.
The ID of the pipe is 6 inches.
The trend showing sand monitoring trend for 2 hours. During this period,
this well produces 0.011 Kg of sand with average sand rate 0.002 g/s.
Flow condition and sand monitoring trend in this line as follow:
Gas Rate : 2.64 mmscfd ( choke open 27/64”)
13.00
Water Rate: 2.23 Bpd
Flow Line Pressure: 107 Psi
Temp: 128 degF
FTHP : 674 Psi
Velocity: 1.15 m/s
Sand Rate : 0,001 g/s

Do sampling Part 4 using 20 Micron Mesh Filter running on GBA-03 Choke :


14.00 27/64” , Gas Rate 2.64 mmscfd for 1 hour ( result: Almost Clean/Sample
Indicated small amound of Fine Sand total weight for 1 hour : 0.3g )
1800 End of shift

Daily Report
Page 1 of 4
Daily Sand Monitoring Report
MET-HEI/25/04/24
Monitoring Chart

Figure 1: Showing Sand monitoring trend in GBA#3

Monitoring Chart

Figure 2: Showing Pulsar Sand monitoring trend in GBA#3

Choke Gas Rate Oil Water Flow line Temp FTHP Flow Total
mmscfd Rate Rate Pressure degF Psi Velocity Sand
Bpd Bpd Psi m/s Kg
27/64 2.64 0 2.23 107 131 674 1.15 0.011
Table 1: Production data GBA#3

The trend showing sand monitoring trend for 2 hours. During this period, this well produces 0.011 Kg of sand
with average sand rate 0.002 g/s.

Daily Report
Page 2 of 4
Daily Sand Monitoring Report
MET-HEI/25/04/24

Picture of 1st OSS on GBA-03


Well: GBA-3
Date: 25 April 2024
Sampling Duration: 10.00 – 12.00 hrs (2 hr)
FL Orientation: Vertical
SP Orientation: 6 o’clock
Filter Mesh Size: 20-micron
Wet Sample Weight: 0.04g
FLP (before C/V): 149 psi
FLT (before C/V): 102 deg. F
Choke Size: 100%
Gas Flowrate: 1.56 mmscfd
Remarks: Almost Clean/Sample
Indicated small amound of
Fine Sand

Picture of 2nd OSS on GBA-03


Well: GBA-3
Date: 25 April 2024
Sampling Duration: 14.00 – 15.00 hrs (1hr)
FL Orientation: Vertical
SP Orientation: 6 o’clock
Filter Mesh Size: 20-micron
Wet Sample Weight: 0.3g
FLP (before C/V): 149 psi
FLT (before C/V): 131 deg. F
Choke Size: 27/64”
Gas Flowrate: 2.62 mmscfd
Remarks: Sample indicated fine sand
from sampling point

Daily Report
Page 3 of 4
Daily Sand Monitoring Report
MET-HEI/25/04/24

Pictures of OSS and Sample Point Location for GBA-03

OSS location at Mezzanine deck

OSS Drain Location OSS Sample point Location GBA-03

Daily Report
Page 4 of 4

You might also like