Daily Sand Monitoring Report 25 April 2024
Daily Sand Monitoring Report 25 April 2024
MET-HEI/25/04/24
Ridwan
Report By Date 25 April 2024
Febdain Syahputra
Report Period 0600 hours to 1800 hours
Report Status
25 April 2024
0600 Well Service meeting
0700 Routing Permit
0800 install OOS and connect one ball valve before inlet chamber.
Do sampling Part 3 using 20 Micron Mesh Filter running on GBA-03 Choke :
10.00 21/64” , Gas Rate 1.56 mmscfd for 2 hours ( Result : Almost clean / Sample
indicated few amound of fine sand )
Connect ASM Pulsar & clamp on to well GBA-03 installed in 3rd Tee-bend
D/S well head. This bend is horizontal to horizontal.
The ID of the pipe is 6 inches.
The trend showing sand monitoring trend for 2 hours. During this period,
this well produces 0.011 Kg of sand with average sand rate 0.002 g/s.
Flow condition and sand monitoring trend in this line as follow:
Gas Rate : 2.64 mmscfd ( choke open 27/64”)
13.00
Water Rate: 2.23 Bpd
Flow Line Pressure: 107 Psi
Temp: 128 degF
FTHP : 674 Psi
Velocity: 1.15 m/s
Sand Rate : 0,001 g/s
Daily Report
Page 1 of 4
Daily Sand Monitoring Report
MET-HEI/25/04/24
Monitoring Chart
Monitoring Chart
Choke Gas Rate Oil Water Flow line Temp FTHP Flow Total
mmscfd Rate Rate Pressure degF Psi Velocity Sand
Bpd Bpd Psi m/s Kg
27/64 2.64 0 2.23 107 131 674 1.15 0.011
Table 1: Production data GBA#3
The trend showing sand monitoring trend for 2 hours. During this period, this well produces 0.011 Kg of sand
with average sand rate 0.002 g/s.