FB0134S-D0101-001

PT MSE 1x35MW CAPTIVE POWER


PLANT PROJECT

Detail Design

Electrical Part
General Specification and Drawing List

FB0134S-D0101-001

SHANGHAI POWER EQUIPMENT RESEARCH INSTITUTE


COMPANY LIMITED
December, 2022
APPROVED BY: Wang Cicheng

REVIEWED BY: Ding Haifeng

PRO. ENG: Sun Jia

CHECKED BY: Xu Xing

DESIGNED BY: Deng Yanping


PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

目录
1 General description ..................................................................................................... 5
1 概述 ......................................................................................................................... 5
1.1 General project background .............................................................................5
1.1 项目背景 ........................................................................................................ 5
1.2 Meteorology & Seismology .............................................................................5
1.2 气象及地震条件 ............................................................................................. 5
1.3 Design basis ..................................................................................................... 6
1.3 设计依据 ........................................................................................................ 6
2 Electrical Design Scope and Interface ........................................................................ 7
2 电气部分设计范围及分界 ................................................................................... 7
3 Main Design Description ............................................................................................ 8
3 主要设计方案 ......................................................................................................... 8
3.1 Single Line Diagram ........................................................................................8
3.1 电气主接线 ..................................................................................................... 8
3.2 Auxiliary Power ............................................................................................... 9
3.2 厂用电系统 .................................................................................................... 9
3.3 Electrical Equipment Arrangement ................................................................10
3.3 电气设备布置 .............................................................................................. 10
3.4 DC System and UPS ...................................................................................... 10
3.4 直流系统及不间断电源 .............................................................................. 10
3.5 Control, Measuring and Protection ................................................................ 11
3.5 二次线、继电保护及自动装置 ...............................................................11
3.6 Over-voltage Protection, Lightning and Earthing ..........................................17
3.6 过电压保护及防雷接地 .............................................................................. 17
3.7 Lighting and Maintenance Network .............................................................. 18
3.7 照明和检修网络 .......................................................................................... 18
3.8 Cabling ...........................................................................................................18
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

3.8 电缆设施 ...................................................................................................... 18


4 Content of detail drawing volumes ........................................................................20
4 施工图卷册目录 ................................................................................................... 20
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

1 General description

1 概述

1.1 General project background

1.1 项目背景

The construction site is located in Surabaya, East Java, Indonesia. PT MSE 1x35MW
Captive Power Plant Project plans to invest and build a 35MW captive power plant.
One set of 35MW turbine-generator unit will be installed in this project. The power
plant uses two 20kV outgoing lines as the power supply for the paper mil.
本工程建设地点位于印尼泗水。本工程拟新建 35MW 电厂,电厂通过两回
20kV 出线连接至纸厂作为其电源。

1.2 Meteorology & Seismology

1.2 气象及地震条件

Plant Elevation above Mean Sea Level (MSL): 28mdpl


Temperatures: Maximum ambient temperature: 39.8 °C
Design ambient temperature (Performance design) :30°C
Minimum ambient temperature:16.8 °C
Annual average temperature: 27.6 °C
Relative humidity:Maximum 100 % ;Minimum 23 %
Plant design relative humidity (Performance design):70 %
Seismic acceleration:0.1~0.15g
Cooling water temperature (Performance design):30°C
平均海平面 (MSL):28mdpl
最高环境温度:39.8 °C
设计环境温度(性能设计):30°C
最低环境温度:16.8 °C
年平均温度:27.6°C
相对湿度:最大 100 %;最小 23 %
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

电厂设计相对湿度(性能设计):70 %
设计基本地震加速度:0.1~0.15g
冷却水温度 (性能设计):30°

1.3 Design basis

1.3 设计依据

Detail Design of the project is based on the following documents:


施工设计根据下列文件:
1) Primary design documents checked and approved by MSE.
1) PT. MSE 审核并批准的初步设计文件。
2) Approved technical agreements and other documents relating to the contract from
MSE.
2)PT. MSE 批准的技术协议及有关合同等文件。
3) Technical specifications and contracts signed with equipment manufacturers.
3)同设备厂家签订的技术协议及合同文件。
4) Currently effective codes and standards as the following:
4)现行的设计规范、规程等,如下:

Standard for Drawing of Electric Power Engineering


DL/T 5028
电力工程制图标准

Code for Design of Building Fire Protection


GB-50016
建筑设计防火规范

Technical Code for the Design of Auxiliary Power


System of Fossil-fired Power Plant DL/T-5153

火力发电厂厂用电设计技术规程

Technical Code for the Design of Electrical Secondary


DL/T-5136
Wiring in Fossil-fired Power Plants and Substations
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

火力发电厂、变电站二次接线设计技术规程

Technical Code for the Design of Relaying Protection


GB-50062
and automatic device of Electric Power Installations

电力装置的继电保护和自动装置设计规范。

Code for Design of Cables of Electric Engineering


GB-50217
电力规程电缆设计规范

Technical Code for Designing DC System of Power


Projects DL/T-5044

电力工程直流系统设计技术规程

Technical Code for the Design of AC Uninterruptible


Power System of Power Engineering DL/T-5491

电力工程交流不间断电源系统设计技术规程

And Etc.

等等。

2 Electrical Design Scope and Interface

2 电气部分设计范围及分界
The design scope for this project includes all the electrical system related to the
generator set in the plant, including electrical primary and secondary system, lighting
system, lightning and grounding system, cabling system, etc. The 20kV cable
outgoing lines are not in this scope, the interface for 20kV system is the cable
terminal in 20kV switch-gear feeder.
本工程电气部分设计范围为新增发电机组有关的所有电气系统的设计,包括
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

电气一、二次系统设计、照明设计、设备接地设计、电缆敷设设计等。20kV 输
电线路不在本合同范围内,本工程与 20kV 系统设计的接口在 20kV 出线开关柜
一次接线端子。

3 Main Design Description

3 主要设计方案

3.1 Single Line Diagram

3.1 电气主接线

3.1.1 Scheme of single line diagram


3.1.1 电气主接线方案
The generator is connected to a double-winding step-up transformer in unit form and
then connect to the 20kV system. The capacity of the main transformer ( MT ) is
45MVA, on-load tap changer (OLTC). The rated voltage of generator is 11kV. The
conductor between the generator and the main transformer is NSPB.
One high-voltage auxiliary transformer (HUAT) of 6.3MVA capacity with off-load tap
changer is furnished. It is tee-off from the low voltage side of MT through NSPB. One
Start/Standby transformer (SST) of 6.3MVA capacity with on-load tap changer is
furnished. It is connected to the 20kV system through cable.
Details are shown in the drawing FB0134S-D0101-002 Electrical Single Line
Diagram.
本工程通过发-变组单元接线形式接入 20kV 系统。主变压器容量为 45MVA,
有载调压形式。发电机机端额定电压为 11kV。发电机与主变之间连接导体为共
箱封闭母线。
设置一台容量为 6.3MVA 的高厂变,无激磁调压,通过共箱封闭母线接于主变低
压侧。设置容量与高厂变一致的启备变,其高压侧通过电缆接至 20kV 系统。
具体接线参见图 FB0134S-D0101-002 “电气主接线图”。
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

3.1.2 Neutral Point Grounding


3.1.2 中性点接地方式
The HV side of the main transformer is grounded via grounding resistance.
主变压器 20kV 侧电阻接地。
The generator adopts neutral point ungrounded mode.
发电机采用中性点不接地方式。

3.2 Auxiliary Power

3.2 厂用电系统

The rated voltages of the electrical auxiliary system are AC 6.0kV and 380/220V. To
feed motors with rated capacity larger than 200kW and 6.3/0.4kV transformers, one
6.0kV busbar is furnished. 6.0kV power is supplied by HUAT Under normal
condition. When the HUAT has a power loss, the 6.0kV system is supplied by SST
from 20kV Grid when start up or on abnormal condition.
Four LUAT are set in this project. The PC section of the main power house is powered
by two 1250kVA transformers and Air Compressor Room PC section is supplied by
two 400kVA transformers. Power of motors ≥ 75kW and most important loads will
be supplied by 400V PC section.
MCCs for process system are furnished. The power of each MCC are supplied by
400V PC section. The MCC incoming switch are dual power automatic switch, and
can switch to the standby power automatically whenever the working power is in
abnormal condition.
厂用电系统的额定电压为交流 6.3kV 和 400/220V。额定容量大于 200kW 的
电机以及 6.3/0.4kV 低厂变由 6.3kV 母线供电。正常情况下,高厂变作为厂用工
作电源,当高厂变失电、启动或异常情况下,6.3kV 系统由启备变从 20kV 系统
供电。
本工程设置 4 台低厂变,主厂房 PC 段由两台 1250kVA 干变供电,空压机房
PC 段由两台 400kVA 干变供电。额定功率不小于 75kW 的电机以及 I、II 级负荷
由 PC 段直接供电。MCC 段电源由 400V PC 段提供,MCC 进线开关为双电源自
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

动开关,工作电源异常时可自动切换至备用电源。

3.3 Electrical Equipment Arrangement

3.3 电气设备布置

3.3.1 Main House Distribution Room


3.3.1 主厂房配电间
The main house distribution room is at the 0m layer in the main house. The 11kV
switch-gear is arranged in the generator room, the 6.3kV switch-gear is arranged in
the HV distribution room , LV Auxiliary Transformers and 400V distribution cabinets
are located in LV distribution room.
主厂房配电间位于主厂房 0 米层。11kV 开关柜布置在发电机小室内,6.3kV
开关柜布置在高压配电间,低厂变以及 400V 低压配电柜布置在低压配电间。
3.3.2 20kV Switch-gear
3.3.2 20kV 开关柜
20kV switch-gear is arranged in the original 20kV power distribution room and
connected with the original switch-gear.
20kV 配电装置布置在老厂 20kV 配电间,与原有开关柜并接。
3.3.3 20kV Transformers
3.3.3 20kV 变压器
MT, HUAT and SST for this project are outside arranged near the Main House.
Firewall is set between transformers.
本工程主变压器、高厂变和启备变露天布置在主厂房外侧。变压器之间设置
防火墙,满足相关防火规范要求。

3.4 DC System and UPS

3.4 直流系统及不间断电源

A set of 220V DC system with 600Ah valve regulated lead-acid type battery sets and
charge is adopted as the power for control/signal, protection, UPS and emergency
lighting.
本工程设有一套 220V 流系统,作为开关控制信号、保护、UPS、和事故照
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

明电源。直流系统由 600Ah 阀控密封铅酸蓄电池组和充电装置等组成。


A set of AC 220V, 40kVA UPS is provided as the uninterruptible power for DCS
system and I&C instruments.
本工程还设有一套 220V,40kVA UPS 装置,供 DCS 系统及热工仪表用。

3.5 Control, Measuring and Protection

3.5 二次线、继电保护及自动装置

3.5.1 Monitoring & Control


3.5.1 电气设备监控
Electrical equipment is controlled by the DCS system. Main electrical monitoring and
control equipment such as generator protection cabinets, transformer protection
cabinets, transducer cabinets and electrical auxiliary cabinet are all located in the
Electronic Equipment Room.
电气部分的监控均纳入机组 DCS 系统,以实现顺序控制和实时监视。主要
电气监控及保护设备如发电机保护屏、变压器保护屏,变送器屏,电气辅助屏等,
均布置在电子设备间内。
(1)Main electrical equipment which be monitored and controlled by DCS system
are as follows:
Generators with excitation system
MT,HUAT, SST
LV Auxiliary Transformers
20kV Switch-gear
6.3kV Switch-gear
400V incoming & coupling circuit breakers
DC & UPS system
(1)在 DCS 系统中监控的设备主要有:
发电机及其励磁系统
主变压器
厂用变压器
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

20kV 开关装置
6kV 配电装置
400V 进线及联络断路器
直流系统
交流不间断电源
3.5.2 Synchronization system
3.5.2 同期系统
A set of synchronization system with auto and manual synchronization devices
multi-object supported is provided for this project. Synchronization devices are
mounted in the Electrical Auxiliary Cabinet. The following circuit breakers are
designed as synchronizing points: MT 20kV circuit breaker(CB1), 20kV Section
circuit breaker(CB5) and HUAT 6.3kV circuit breaker(CB11) .
本期工程设置一套支持多对象的自动准同期装置和手动准同期装置用于同
期系统。同期装置安装在电气辅助屏上。主变 20kV 侧断路器、20kV 分段断路
器以及高厂变 6.3kV 侧断路器设为同期点。
3.5.3 Protection
3.5.3 继电保护
The microprocessor protection devices are adopted for this project. Protection
configurations for main electrical equipment are as follows:
主设备的保护原则上采用微机型保护装置,主要设备的保护配置如下:
(1) Generator Protection:
(1)发电机保护
 Generator Differential Protection (87G)
 发电机差动保护
 Generator Overcurrent Protection (50/51)
 发电机过电流保护
 Generator Overload Protection (49G)
 发电机过负荷保护
 Generator Earth Fault Protection (59NG)
 发电机定子接地保护
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

 Generator Over Voltage Protection (59G)


 发电机过电压保护
 Negative Sequence Load Protection (46G)
 发电机负序负荷保护
 Generator Reverse Power Protection (32R)
 逆功率保护
 Generator Loss of Excitation (40G)
 发电机失磁保护
 Generator Zero-sequence Current Protection (50N/51N)
 发电机零序电流保护
 Under/Over Frequency Protection
 低频/高频保护
(2) Main Transformer Protection
(2)主变压器保护
 G-T Differential Protection (87T)
 发变组差动保护
 Main TR Overcurrent I>+U<+U2> (51/27)
 复合电压起动的过流保护
 Main TR Zero-sequence Current (50N/51N)
 主变零序过流保护
 Main TR Overload (49)
 主变过负荷保护
 TR Main Body Buchholz (63X)
 主变本体瓦斯保护
 TR Pressure-relief Valve (63P)
 主变压力释放
 TR Oil Temperature (49XO)
 主变油温保护
 TR Winding Temperature (49XW)
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

 主变线圈温度保护
 TR Oil Level Alarm (71X)
 主变油位异常告警
 Main TR OLTC Buchholz (63OT)
 主变有载开关瓦斯保护
 Main TR OLTC Oil Level Alarm (71XOT)
 有载开关油位异常告警
(3) SST Protection
(3)启备变保护
 Transformer Differential Protection (87T)
 变压器差动保护
 SST Over-current I>+U<+U2> (51/27)
 复合电压起动的过流保护
 SST Zero-sequence Current (50N/51N)
 启备变零序过流保护
 SST Overload (49)
 启备变过负荷保护
 SST Body Buchholz (63X)
 启备变本体瓦斯保护
 TR Pressure-relief Valve (63P)
 启备变压力释放
 TR Oil Temperature (49XO)
 启备变油温保护
 TR Winding Temperature (49XW)
 启备变线圈温度保护
 TR Oil Level Alarm (71X)
 启备变油位异常告警
 Main TR OLTC Buchholz (63OT)
 启备变有载开关瓦斯保护
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

 Main TR OLTC Oil Level Alarm (71XOT)


 有载开关油位异常告警
(4) HUAT Protection
(4)高厂变保护
 Transformer Differential Protection (87T)
 变压器差动保护
 HUAT Over-current I>+U<+U2> (51/27)
 复合电压起动的过流保护
 HUAT Zero-sequence Current (50N/51N)
 高厂变零序过流保护
 HUAT Overload (49)
 高厂变过负荷保护
 HUAT Body Buchholz (63X)
 高厂变本体瓦斯保护
 TR Pressure-relief Valve (63P)
 高厂变压力释放
 TR Oil Temperature (49XO)
 高厂变油温保护
 TR Winding Temperature (49XW)
 高厂变线圈温度保护
 TR Oil Level Alarm (71X)
 高厂变油位异常告警
(5) The integrated protection device is adopted for 20kV Feeder Protection, and
is installed in the 20kV Switchgear. The protection function is as follows:
(5)20kV 出线保护采用综合保护装置,安装在 20kV 开关柜内,保护功能
如下:
 Overcurrent Protection (50/51)
 速断和过流保护
 Over Load Protection (49)
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

 过负荷保护
 Earth Fault Protection (59N)
 单相接地保护
 Low Frequency Protection (81)
 低频保护
(6) For Auxiliary Transformer, the integrated protection device is also provided in
6kV switchgear; and the protection function is as follows:
(6)低压厂变也采用综合保护装置,安装在 6kV 开关柜内,其保护功能如
下:
 Overcurrent Protection (50/51)
 速断和过流保护
 Over Load Protection (49)
 过负荷保护
 LV Side Zero-sequence Current Protection (51N)
 低压侧零序过流保护
 TR Temperature Trip (49X)
 变压器高温跳闸保护
3.5.4 Measuring
3.5.4 测量
Electrical measuring meters, energy meter and online transducers are provided
according to related standards and regulations in this project. Digital display meters
and transducers with 4-20mA output are used for electrical measuring; multifunctional
meters are provided for related energy metering.
本期工程将按相关规程规定配置电气设备的电测量仪表、电能计量仪表及
DCS 在线监测变送器。智能数显仪表加 4~20mA 变送输出的变送器用于电气参
数测量;电度输出的多功能表用于相关的电能计量与显示。
For details, please refer to the drawing FB0134S-D0101-002 ‘Single Line Diagram’.
详细请参见图 FB0134S-D0101-002 “电气主接线图”。
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

3.6 Over-voltage Protection, Lightning and Earthing

3.6 过电压保护及防雷接地

3.6.1 Lightning protection


3.6.1 防雷保护
The main buildings in this project are steel structure. Steel roofs are designed as
natural air-terminations; and steel columns are connected to the nearest earthing grid
as down-conductors.
本工程主要建筑物均为钢结构,建筑物的防雷利用钢屋面作为自然接闪器,
钢柱作为引下线并接入就近接地网。
3.6.2 Over voltage protection
3.6.2 过电压保护
In order to prevent the damage to electrical equipment from lightning impulse, zinc
oxide surge arresters are furnished wherever necessary. A set of surge arrester is
furnished in each vacuum circuit breaker cabinet to prevent switching overvoltage.
为限制雷电入侵波等产生的过电压危害,各需要的地点装设氧化锌避雷器。
在各真空断路器柜内装设一组避雷器以限制操作过电压的危害。
3.6.3 Earthing
3.6.3 接地
A buried main earthing grid consisting of horizontal earthing conductors and vertical
earthing electrodes will be designed. The buried horizontal earthing conductor will be
of galvanized flat steel of cross-section size not less than 300mm2 , and the vertical
earthing electrodes will be of galvanized steel pipe of length 2.5m. General earthing
resistance of the plant shall be less than 4 Ω.
本工程全厂设有地下接地网,建构筑物基础采用基础钢筋焊接成网的方式接
入全厂接地网。厂区主接地网由水平接地体和垂直接地体组成。水平接地体材料
采用 50x6 镀锌扁钢,2.5m 垂直接地极采用铜包钢棒。全厂总的接地电阻小于 4
Ω。
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

3.7 Lighting and Maintenance Network

3.7 照明和检修网络

Lighting system is including normal lighting and emergency lighting.


本工程照明系统包括正常照明和应急照明。
A lighting distribution cabinet is furnished in the Control Room for normal lighting.
The power of the lighting distribution cabinet is fed from 400V bus common.
本工程在控制室设置一个照明配电箱作为全厂正常照明电源,该照明配电箱
的电源引自 400V 公用段。
Emergency lightings with battery are set in buildings, exits and stair house, etc. DC
ever-burning lamps are set in the Control Room.
在建筑物房间、出入口、楼梯间等的应急照明采用带蓄电池的应急灯。主控
室内设置直流长明灯。
Illuminating fixtures are normal type or with different protection level according to
environmental conditions and requirements of the workplace.
照明器材按工作场所的环境条件和使用要求,选用一般照明或具有不同防护
功能的灯具。

3.8 Cabling

3.8 电缆设施

3.8.1 Power Cable


3.8.1 电力电缆
20kV power cable is XLPE insulation PVC-sheathed copper core flame retardant
cable, ZR-YJV-12/20kV type.
20kV 电缆选用 ZR-YJV-12/20kV 系列铜芯交联聚乙烯绝缘聚氯乙烯护套阻
燃电力电缆。
11kV and 6.6kV power cable are both ZR-YJV-6/10kV type, XLPE insulation
PVC-sheathed copper core flame retardant cable with steel strap armour.
11kV 及 6.6kV 电缆均选用 ZR-YJV-6/10kV 交联聚乙烯绝缘聚氯乙烯护套阻
燃电力电缆。
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

380V power cable is XLPE insulation PVC sheathed copper core flame retardant
cable with steel strap armour, ZR-YJV22-0.6/1.0kV type.
380V 电力电缆选用 ZR-YJV22-0.6/1.0kV 系列铜芯交联聚乙烯绝缘聚氯乙烯
护套钢带铠装阻燃电缆。
3.8.2 Control Cable & Signal Cable
3.8.2 控制电缆及信号电缆
All of control cable and digital cable to DCS are ZR-KVVP2-0.45/0.75 kV type, PVC
insulation PVC sheathed copper core flame retardant cable with Copper strip shield.
所有控制电缆及至 DCS 系统的数字量信号电缆选用 ZR-KVVP2-0.45/0.75
kV 系列铜芯聚氯乙烯绝缘聚氯乙烯护套铜带总屏蔽阻燃控制电缆。
Analog signal cable is ZR-DJYP2V-0.45/0.75kV type PVC insulation PVC sheathed
copper core flame retardant computer cable with Copper strip shield(1 pair),or
ZR-DJYP2VP2-0.45/0.75kV type PVC insulation PVC sheathed copper core flame
retardant computer cable with Copper strip shield(multi- pair).
模拟量信号电缆选用 ZR-DJYVP2-0.45/0.75kV 系列铜芯聚氯烯绝缘对绞铜
带屏蔽聚氯乙烯护套电子计算机电缆(1 对)或 ZR-DJYP2VP2-0.45/0.75kV 系列
铜芯聚乙烯绝缘对绞铜带屏蔽带总屏蔽聚氯乙烯护套电子计算机电缆(多对)。
3.8.3 Cable Layout
3.8.3 电缆敷设
Cable trench is applied mainly in this project. Cable tray and cable conduit are used as
assistant ways.
本工程电缆敷设主要形式采用电缆沟,辅助形式为电缆桥架和电缆护套管。
3.8.4 Cable Fire Resistance & Flame Retard
3.8.4 电缆防火与阻燃
Following measurements are adopted at necessary points in cable raceway:
本期工程主要采用以下电缆防火阻燃措施:
 Flame retardant cable is used for all power cable and control cable.
 所有电力电缆和控制电缆均选用阻燃型电缆。
 Fire-withstand provision will be furnished on cable structure in flammable
areas in main house.
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

 在主厂房易燃区域的电缆通道实施防火构造。
 Effective fire-against safeguard of sealing will be applicable in cable
structure.
 在电缆构筑物内实施有效的防火防封堵。
 Hole for cable access under panel/cabinet will be sealed by fire-withstand
material.
 所有电气屏/柜/箱的电缆开孔部位采用密封材料封堵。
 Necessary smoke and temperature detection and annunciator will be
installed.
 在必要的地方安装感烟探测器、感温探测器及报警器等。

4 Content of detail drawing volumes

4 施工图卷册目录

Volume No. /卷册号 Name/名称

Volume 1 General of Electrical Part


FB0134S-D01
第一卷 电气总的部分

Section 1 Single Line Diagram, Description & Volume List


FB0134S-D0101
第一册 电气总图、说明书及卷册目录

Section 2 Equipment & Main Material List


FB0134S-D0102
第二册 设备及主要材料清册

Volume 2 SLD & Arrangement of 20kV Electrical Equipment


FB0134S-D02
第二卷 20kV 电气设备接线布置图

Section 1 SLD & Arrangement of 20kV Switchgear


FB0134S-D0201
第一册 20kV 配电装置接线布置图

Section 2 Installation Drawing of MT.and SST


FB0134S-D0202
第二册 主变及启备变布置图
PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

Volume 3 SLD & Arrangement of 11kV Electrical Equipment


FB0134S-D03
第三卷 11kV 电气设备接线布置图

Section 1 SLD & Arrangement of 11kV Switchgear


FB0134S-D0301
第一册 11kV 配电装置接线布置图

Volume 4 Auxiliary Power Supply


FB0134S-D04
第四卷 厂用配电装置

Section 1 Arrangement of HUAT


FB0134S-D0401
第一册 高压厂用变压器安装布置图

Section 2 SLD & Arrangement of 6.3kV Switchgear


FB0134S-D0402
第二册 6.3kV 配电装置接线布置图

Section 3 SLD & Arrangement of 400V Switchgear


FB0134S-D0403
第三册 400V 配电装置接线布置图

Volume 5 Secondary Wiring of Electrical Control


FB0134S-D05
第五卷 电气控制二次线

Section 1 General of Central Control Room


FB0134S-D0501
第一册 集控室总的部分

Section 2 Secondary Wiring of Gen. & TR


FB0134S-D0502
第二册 发变组二次线

Section 3 Secondary Wiring of SST


FB0134S-D0503
第三册 启备变二次线

Section 4 Secondary Wiring of 20kV Switchgear


FB0134S-D0504
第四册 20kV 开关柜二次线

Section 5 DC System and UPS


FB0134S-D0505
第五册 直流系统及 UPS 电源

Section 6 Electrical I/O List


FB0134S-D0506
第六册 电气部分 DCS I/O 清册

Section 7 FB0134S-D0507 20kV Switchgear Schematic Diagram


PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

第七册 20kV 开关柜单元接线图

Volume 6 Secondary Wiring of Auxiliary Power Supply


FB0134S-D06
第八卷 厂用电配电装置二次线

Section 1 6kV Switchgear Schematic Diagram 6kV


FB0134S-D0601
第一册 配电装置二次原理图
Section 2 Secondary Wiring of 6kV Distribution Equipment
FB0134S-D0602
第二册 6kV 配电装置二次线

Section 3 380V Switchgear Schematic Diagram


FB0134S-D0603
第三册 380V 配电装置二次原理图

Section 4 Secondary Wiring of 380V Distribution Equipment


FB0134S-D0604
第四册 380V 配电装置二次线

Volume 7 Lightning and Grounding


FB0134S-D07
第七卷 防雷接地

Section 1 Lightning and grounding in plant area


FB0134S-D0701
第一册 厂区防雷接地

Section 2 Grounding of main house


FB0134S-D0702
第二册 主厂房接地

Section 3 Auxiliary building grounding


FB0134S-D0702
第三册 辅助厂房接地

Volume 8 Slide Wire


FB0134S-D08
第八卷 行车滑线

Section 1 Slide Wire


FB0134S-D1301
第一册 行车滑线

Volume 9 Cable Layout


FB0134S-D09
第九卷 电缆敷设

Section 1 FB0134S-D0901 Cable Route Layout


PT MSE 1x35MW CAPTIVE POWER PLANT PROJECT
Description & Volume List

第一册 电缆通道布置

Section 2 Cable Layout


FB0134S-D0902
第二册 电缆敷设图

Section 3 Cable Fire Resistance & Flame Retard


FB0134S-D0903
第三册 电缆防火与阻燃

Section 4 Cable List


FB0134S-D0904
第四册 电缆清册

Volume 10 Lighting System


FB0134S-D10
第十卷 全厂照明

Section 1 Main house Lighting System


FB0134S-D1001
第一册 主厂房照明

Section 2 Auxiliary building Lighting System


FB0134S-D1002
第二册 辅助用房照明

Section 3 Boiler Lighting System


FB0134S-D1003
第三册 锅炉本体照明

Section 4 Plant Lighting System


FB0134S-D1004
第四册 厂区照明