0% found this document useful (0 votes)
602 views2 pages

Mewp Checklist

This document is an inspection report for a MEWP (mobile elevating work platform). It lists 42 items that are inspected, including the work platform, structure, safety devices, engine, controls and records. Test results are noted as satisfactory, comments, recommendations or not satisfactory. The report also includes operator details and sections for critical findings, recommendations and general comments.

Uploaded by

harris.itac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
602 views2 pages

Mewp Checklist

This document is an inspection report for a MEWP (mobile elevating work platform). It lists 42 items that are inspected, including the work platform, structure, safety devices, engine, controls and records. Test results are noted as satisfactory, comments, recommendations or not satisfactory. The report also includes operator details and sections for critical findings, recommendations and general comments.

Uploaded by

harris.itac
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

MEWP Inspection and Thorough examination report/check list

TUV Southwest, Inspection DEPT, www.tuvsw.com

Doc.No : Procedure.No :
Standard Ref : BS EN 280:2013+A1:2015
Owner/Customer

Owner Id Project/Location

Registration NO Name Of Equipment

Chassis / Sr No Model Of Equipment

Year Of Manufacture Name Of Manufacture

Description Of Equipment

Periodic Record:-
Type Of Examination Initial / Periodic / Major Last Examination Date

Date Of Examination Last Load Test Date

Next Examination Due Next Load Test Due

Test Details :-
Work Platform Size Extended Platform Size Safe Working Load Test Load Applied

Max. Working Height Max. Horizontal Reach No. Of Allowable Persons Source of Power

PA-Satisfactory ; CO- Comments (Finding), RE-Recommendation ; FL-Not Satisfactory ; NA-Not Applicable

# Inspect Items Test Result # Inspect Items Test Result


1 WORK PLATFORM 2 Overall Dimensions

3 Structure Condition 4 Guardrail / Intermediate Bar

5 Entrance Gate, Pins & Bolts 6 Acceleration / Braking

7 Safe Speed Control 8 Foot Switch Condition

9 Anchor Points 10 Fire Extinguisher

11 Horn 12 EXTENDING STRUCTURE

13 General Condition 14 Crack / Welding Sign, Free Movement

15 Hydraulic System / Pipes & Hoses 16 Transmission Belt / Chains

17 Raising / Lowering 18 Wire Rope / Chain Drive System

19 Braking System 20 Limit Switches

21 Warning Beacon 22 CHASSIS

23 Operator Cabin 24 Chassis & Slew Ring Condition

25 Tires / Castor Wheels 26 Brakes & Suspension

27 Engine Condition 28 Hydraulic Tank / Fuel Tank

29 Stabilizer / Outriggers 30 Control Levers / Wireless Remote

31 Level Indicator 32 SAFETY DEVICES

33 Moment Sensing Device 34 Load Sensing Device

35 Motion Alarms Functioning 36 Emergency Stop Switches

37 Emergency Rescue Device 38 Sky Guard

39 RECORDS 40 Monthly Inspection

41 Maintenance 42 Repair & Modification

Operator Details

Is the Equipment safe to operate? YES/NO Name & Signature of Company Appointed
Inspector :

Equipment Group Id: Other Equipment Used:

MWP/03, REV-8
Doc.No :

Critical Findings

Recommendation

Comments (Finding) Target Date

MWP/03, REV-8

You might also like