HIRA-REV-02

Hindustan Coca-Cola Beverages Private Limited-TELANGANA GREEN FIELD PROJECT Classification: Public
Significant 7 13
Risk Evaluation Table -WTP Area site store setup Insignificant
Back
Total Likelihood Level Total Severity Level
Existence of
legal
Problem / Name of
Severity Cost of requiremen
Accident Total Number of Name of related Existence of related Baseline /
Zone / Department Safety Aspect (Activity / Process / Task / Safety Hazard Safety Impact Frequency Likelihood of equipme Total Severity ts Classification of
happened Likelihood people legal Company Company Inherent Risk
Material / Product / Service) accident / nt Score specifically Impact
within last Score exposed requirement(s) requirements requirement( Score
incident damage applicable
5 years s)
to this
event
1) Untrained / Incompetent /
Inexperienced worker.
2) Lack of Knowledge. 6-
3-
3) Unfit worker Equipme
Medical As per HCCB
nt Thermax
1) Fatal Injury Treatmen Construction
damage / Safety Policy
WTP Area 2) Property 6-Once per every 3-Unlikely 0-No 3 3-8-15 People t case 12 0-No Safety 0-No 216 insignificant
Mobilization of manpower lost value and Safety
Damaged 1-2 weeks (beyond Guidelines Site
is more Management
first aid Management
than plan
but no plan.
1.000.00
time off)
0 US$

1) Untrained / Incompetent /
Inexperienced operator.
2) Over speeding.
3) Drunk and drive 6-
Legal Req as per
4) Vehicle hit to person or equipment 3- factory act ,
1) Serious Equipme
or material. Medical 1948
incident may be nt Thermax
5) Using Mobile phone while driving Treatmen Sec 29 As per
occur. 7-Once per damage / Safety Policy
Unloading Of 20 Feet Container (Using by 14 6) Vehicle failure - Mechanical / t case HCCB
WTP Area 2) Fatality. every day 1-Remote 0-No 1 3-8-15 People
(beyond
lost value 12 0-No
Construction
0-No and Safety 84 insignificant
ton Farana crane). Hydraulic Failure. is more Management
3) Property first aid Safety
than plan
Damaged. but no Guidelines -
1.000.00
time off) Lifting
0 US$
Equipment.

Prepared by Reviewed by Reviewed by Reviewed by Reviewed by Reviewed and Approved by

CONTRACTOR EHS Incharger, CONTRACTOR Project Manager FABS Site Engineer FABS EHS Incharge HCCB project manager HCCB EHS Manager
HIRA-REV-02 Classification: Public

6/26/2023

Description of Controls Currently in Place


Risk Score with Description of Action
(consider, in sequence: Elimination, Substitution, Use of Barriers, Use of Procedures, Use of Warning Systems/Signs, Use of PPE) Effectiveness of Current Classification of Action
actual level of Required /
Controls Risk Required?
control Management Program
Note: Also consider Training

1. Trained, competent and experienced workers should be deployed.


2. Ensure competency certificates.
3. Workers above 21 years and below 50 years of age are only allowed for height work after passing vertigo test.
4. Pre entry medical check - up should be done. Vertigo test to be done for height work workers.
5. Only Safety inducted workers should be deploy for the performing the work.
6. Work related trainings, TBT to be provide before start the work. 0.1-Existing Controls No action
7. All workers are known about the work activity. Adequate and Fully 22 LOW RISK required at this
8. HCCBPL Construction guideline must be followed. Implemented time
9. Task relevant PPES should be provided and PPES compliance register to be maintained.
10. Pre task meeting should be proved before start the work activity like height work training, hot work, fire watcher trainings.
11. Provision of drinking water and other welfare facilities shall be provided.

1) Allow only valid licence holder operator to operate vehicle.


2) Operator / Driver should be aware about the HCCB and Project Safety Guideline.
3) All necessary documents should be ensure as per HCCB requirement while entering the vehicle in the plant.
4) Alcoholic person strictly prohibited.
5) Trained Signal Man to be deployed.
6) Mobile phone not be allowed to driver or operator while driving.
7) Vehicle mechanical and hydraulic part condition and working to be inspect.
8) Job specific PPE's to be provided. 0.1-Existing Controls No action
9) Signal man must be assigned only for congested areas and where operator visibility is low. Adequate and Fully 8 LOW RISK required at this
10) Adhere speed and other traffic rules. Implemented time
11) Stop vehicle policy for zebra lines and pedestrian cross areas.
12) TP certificates for mobile plant and equipment operator.

Reviewed by Reviewed and Approved by

HCCB EHS Manager


HIRA-REV-02 Classification: Public
Hindustan Coca-Cola Beverages Private Limited-TELANGANA GREEN FIELD PROJECT
Significant 7 13
Risk Evaluation Table - Material Loading / Unloading, Lifting Shifting. Insignificant
Back
Existence of
Total Likelihood Level/ Total Severity Level legal
Problem Name of
Severity Cost of requiremen
Accident Total Number of Name of related Existence of related Baseline /
Likelihood of equipme Total Severity ts Classification of
Zone / Department Safety Aspect (Activity / Process / Task / Material / Product / Service) Safety Hazard Safety Impact Frequency happened Likelihood people legal Company Company Inherent Risk
accident / nt Score specifically Impact
within last Score exposed requirement(s) requirements requirement( Score
incident damage applicable
1) Untrained / Incompetent / 5 years s)
to this
Inexperienced worker. event
2) Lack of Knowledge. 6-
3-
3) Unfit worker Equipme
Medical As per HCCB Thermax
nt
1) Fatal Injury Treatmen Construction limited.
6-Once per damage /
WTP Mobilization of manpower 2) Property Damaged 3-Unlikely 0-No 3 3-8-15 People t case lost value 12 0-No Safety 0-No Safety Policy 216 insignificant
every 1-2 weeks (beyond
is more
Guidelines Site and Safety
first aid Management Management
than
but no plan. plan
1.000.00
time off)
0 US$

1) Untrained / Incompetent /
Inexperienced driver.
2) Over speeding.
3) Drink and drive 6-
Legal Req as per
4) Vehicle hit to person or equipment factory act ,
Equipme
or material. 1948 Thermax
1-First nt
5) Using Mobile phone while driving 1) Serious incident may be Aid damage /
Sec 29 As per limited.
WTP
Mobile Plant, equipment Movement in the plant 6) Vehicle failure - Mechanical / occur. 7-Once per 3-Unlikely 0-No 3 3-8-15 People incident lost value 10 0-No HCCB 0-No Safety Policy 210 insignificant
(Material Vehicle, Farana). Hydraulic Failure. 2) Fatality. every day or near is more
Construction and Safety
3) Property Damaged. Safety Management
miss than
Guidelines - plan
1.000.00
Lifting
0 US$
Equipment.

1) Slip, trip
2) Sharp edges
3) Load Hitting to plant facility
4) Fall hazard
5) Over Loading
6) Vision block
7) Uneven surface
8) Lifting tools, Vehicle failure
9) Toppling of crane.
10) Overhead lines
11) Underground utilities.
12) Untrained rigging team /
Uncertified Operator and Tools & Legal Req as per
Tackles 6-
factory act ,
13) Uncontrolled load 1) Personnel Injury. Equipme
1948 Thermax
14) Suspended load 2) Multiple fractures or 1-First nt
Sec 29 As per limited.
Pota cabin lifting and Loading / Unloading by using 15) Improper rigging fatality. 4-Once per Aid damage /
HCCB Safety Policy
Ten Acers Farana. 3) Accident. every 6 months
3-Unlikely 0-No 3 2-3-7 People incident lost value 9 0-No
Construction
0-No
and Safety
108 insignificant
16) Improper Signalling or near is more
17) Adjacent near by structure 4) Property Damaged. Safety Management
miss than
Guidelines - plan
1.000.00
Lifting
0 US$
Equipment.

1) Slip, trip
2) Sharp edges
3) Load Hitting to plant facility
4) Fall hazard
5) Over Loading
6) Vision block
7) Uneven surface
8) Lifting tools, Vehicle failure Legal Req as per
9) Toppling of crane. 6-
3- factory act ,
10) Overhead lines 1) Personnel Injury. Equipme
Medical 1948 Thermax
11) Underground utilities. 2) Multiple fractures or nt
Treatmen Sec 29 As per limited.
Loading, unloading, lifting shifting and Installation 12) Untrained rigging team / fatality. 6-Once per damage /
t case HCCB Safety Policy
every 1-2 weeks 3-Unlikely 0-No 3
WTP 3-8-15 People lost value 12 0-No 0-No 216 insignificant
of Pumps & tank by using Crane . Uncertified Operator and Tools & 3) Accident. (beyond
is more
Construction and Safety
Tackles 4) Property Damaged. first aid Safety Management
than
13) Uncontrolled load but no Guidelines - plan
1.000.00
14) Suspended load time off) Lifting
0 US$
15) Improper rigging Equipment.
16) Improper Signalling
17) Adjacent near by structure

1) Slip, trip
2) Sharp edges
3) Load Hitting to plant facility
4) Fall hazard
5) Over Loading
6) Vision block
7) Uneven surface
8) Lifting tools, Vehicle failure
9) Toppling of crane.
10) Overhead lines
11) Underground utilities. Legal Req as per
6-
factory act ,
12) Untrained rigging team / 1) Personnel Injury. Equipme
1948 Thermax
Uncertified Operator and Tools & 2) Multiple fractures or 1-First nt
Sec 29 As per limited.
Loading, unloading, lifting shifting of Tank and Tackles fatality. 6-Once per Aid damage /
HCCB Safety Policy
every 1-2 weeks 3-Unlikely 0-No 3
WTP 13) Uncontrolled load 2-3-7 People incident lost value 9 0-No 0-No 162 insignificant
installation by using Crane. 3) Accident. or near is more
Construction and Safety
14) Suspended load 4) Property Damaged. Safety Management
15) Improper rigging miss than
Guidelines - plan
1.000.00
16) Improper Signalling 0 US$
Lifting
17) Adjacent near by structure Equipment.

1) Slip, trip.
2) Fall Hazards
3) Improper material stacking
4) Improper material handling
5) Over weight lifting
6) Ergonomic hazards.
7) Sprains and strains
8) Injury to employees
9) Work related upper limb disorders. Legal Req as per
6-
10) Trapping of body parts. factory act ,
Equipme
1) Personnel Injury. 1948 Thermax
1-First nt
2) Rotator cuff injuries 8-Once per each Sec 34 As per limited.
Material manually Lifting, shifting, loading, Aid damage /
HCCB Safety Policy
WTP
unloading. ( affects the shoulder) shift or more 3-Unlikely 0-No 3 2-3-7 People incident lost value 9 0-No
Construction
0-No
and Safety
216 insignificant
3) Muscle strains and low often or near is more
Safety Management
back injuries. miss than
Guidelines - plan
1.000.00
Lifting
0 US$
Equipment.

Spreading of infection due to COVID


infected person /Material

6-
Equipme
Thermax
1-First nt
limited.
3-Once per Aid damage /
Factories act Safety Policy
WTP Entry in to the work place during COVID'19 Period Illness/Fatal every 1-2 years 3-Unlikely 0-No 3 3-8-15 People incident lost value 10 0-No
1948, Chapter 3
0-No
and Safety
90 insignificant
or near is more
Management
miss than
plan
1.000.00
0 US$

Hand injury due to scrap material or


loose material
6-
Equipme
Thermax
1-First nt
House keeping after Completion of work limited.
Aid damage /
Factories act Safety Policy
Ten Acers Personnel Injury 9-Continuous 3-Unlikely 0-No 3 3-8-15 People incident lost value 10 0-No
1948, Chapter 3
0-No
and Safety
270 insignificant
or near is more
Management
miss than
plan
1.000.00
0 US$

Snake Hazard

As per Factory
act-1948
Contractor and
6-
1) Fatal Visitor
Equipme
2) Minor or major Injury Management Thermax
1-First nt
3)Brain RequirementsES limited.
Aid damage /
RQ-110and Safety Policy
WTP Material Lifting / Shifting Work death 9-Continuous 3-Unlikely 0-No 3 3-8-15 People incident lost value 10 0-No
HCCB
0-No
and Safety
270 insignificant
4)Coma(prolonged loss of or near is more
Construction Management
consciousness) miss than
Safety plan
1.000.00
Guidelines-
0 US$
2,13,14 &
project EHS
plan.
HIRA-REV-02 Slip, Trip or Fall hazards in to the exit Classification: Public
way.
6-
3-
Equipme
Medical Thermax
1) Personnel Injury nt
Emergency evacuation or exit Treatmen limited.
2) Multiple fracture / Fatal 1-Once per damage /
6-More than t case Factories act Safety Policy
WTP
Injury every 10 years 3-Unlikely 0-No 3 50 People (beyond
lost value 15 0-No
1948, Sec 41B
0-No
and Safety
45 insignificant
is more
first aid Management
than
but no plan
1.000.00
time off)
0 US$

Prepared by Reviewed by Reviewed by Reviewed by Reviewed by Reviewed and Approved by

CONTRACTOR EHS Incharger, CONTRACTOR Project Manager FABS Site Engineer FABS EHS Incharge HCCB project manager HCCB EHS Manager
HIRA-REV-02 Classification: Public

6/30/2023
Description of Controls Currently in Place
Risk Score with actual Description of Action Required /
(consider, in sequence: Elimination, Substitution, Use of Barriers, Use of Procedures, Use of Warning Systems/Signs, Use of PPE) Effectiveness of Current Controls Classification of Risk Action Required?
level of control Management Program
Note: Also consider Training

1. Trained, competent and experienced workers should be deployed.


2. Ensure competency certificates.
3. Workers above 21 years and below 50 years of age are only allowed for height work after passing vertigo test.
4. Pre entry medical check - up should be done. Vertigo test to be done for height work workers.
5. Only Safety inducted workers should be deploy for the performing the work. 0.1-Existing Controls No action
6. Work related trainings, TBT to be provide before start the work. Adequate and Fully 22 LOW RISK required at this
7. All workers are known about the work activity. Implemented time
8. HCCBPL Construction guideline must be followed.
9. Task relevant PPES should be provided and PPES compliance register to be maintained.
10. Pre task meeting should be proved before start the work activity like height work training, hot work, fire watcher trainings.
11. Provision of drinking water and other welfare facilities shall be provided.

1) Allow only valid licence holder operator to operate vehicle.


2) Operator / Driver should be aware about the HCCB and Project Safety Guideline.
3) All necessary documents should be ensure as per HCCB requirement while entering the vehicle in the plant.
4) Alcoholic person strictly prohibited.
5) Trained Signal Man to be deployed.
6) Mobile phone not be allowed to driver or operator while driving.
7) Vehicle mechanical and hydraulic part condition and working to be inspect. 0.1-Existing Controls No action
8) Job specific PPE's to be provided. Adequate and Fully 21 LOW RISK required at this
9) Signal man must be assigned only for congested areas and where operator visibility is low. Implemented time
10) Adhere speed and other traffic rules.
11) Stop vehicle policy for zebra lines and pedestrian cross areas.
12) TP certificates for mobile plant and equipment operator.

1) Allow only valid licence holder operator to operate vehicle.


2) Operator / Driver should be aware about the HCCB and Project Safety Guideline.
3) All necessary documents should be ensure as per HCCB requirement - Lifting tools and vehicle examination form, TPI, Insurance.
4) Alcoholic person strictly prohibited.
5) Trained Signal Man to be deployed.
6) Mobile phone not be allowed to driver or operator while driving.
7) Vehicle mechanical and hydraulic part condition and working to be inspect.
8) Before start the work inspect all lifting tools such as D shackles, Bow shackles, Web slings, wire rope slings, crane wire rope, crane
hydraulic parts, limit switch is in working, siren or horns is working.
9) Operator should have a clear view of the road.
10) Make sure pota cabin should be parallel to the ground while lifting.
11) Ensure the work area or access is even to avoid toppling of crain.
12) Material should be lift as per shape, size and weight.
13) Material should be carry as per the capacity of crane, lifting tools, do not allow to overloading..
14) Work should be carried out as per the submitted lifting plan / Method statement.
15) Enclosed supervision should be provided.
16) Guide rope should be provided.
17) Ensure no one be enter below suspended load. 0.1-Existing Controls No action
18) Make sure load should not be suspended for long-time. Adequate and Fully 11 LOW RISK required at this
19) Area should be barricaded and display appropriate signage. Implemented time
20) TBT should be conducted before start the work.
21) PPE's to be provided - Full Body Safety Harness to be provided while installing lifting tools.
22) Confirmation by HCCB team for underground utilities.
23) Trained riggers should be deploy
24) Proper communication should be maintained between riggers and operator and flagman.
25) Whistle should be provide to flagman.
26) Fill - up checklist before start the work.

1) Allow only valid licence holder operator to operate vehicle.


2) Operator / Driver should be aware about the HCCB and Project Safety Guideline.
3) All necessary documents should be ensure as per HCCB requirement - Lifting tools and vehicle examination form, TPI, Insurance.
4) Alcoholic person strictly prohibited.
5) Trained Signal Man to be deployed.
6) Mobile phone not be allowed to driver or operator while driving.
7) Vehicle mechanical and hydraulic part condition and working to be inspect.
8) Before start the work inspect all lifting tools such as D shackles, Bow shackles, Web slings, wire rope slings, crane wire rope, crane
hydraulic parts, limit switch is in working, siren or horns is working.
9) Operator should have a clear view of the road.
10) Make sure Pumps should be parallel to the ground while lifting.
11) Ensure the work area or access is even to avoid toppling of crain. 0.1-Existing Controls No action
12) Material should be lift as per shape, size and weight. Adequate and Fully 22 LOW RISK required at this
13) Material should be carry as per the capacity of crane, lifting tools, do not allow to overloading.. time
14) Work should be carried out as per the submitted lifting plan. Implemented
15) Enclosed supervision should be provided.
16) Guide rope should be provided.
17) Ensure no one be enter below suspended load.
18) Make sure load should not be suspended for long-time.
19) Area should be barricaded and display appropriate signage.
20) TBT should be conducted before start the work.
21) PPE's to be provided - Full Body Safety Harness to be provided while installing lifting tools.
22) Confirmation by HCCB team for underground utilities.
23) Trained riggers should be deploy
24) Proper communication should be maintained between riggers and operator and flagman.
25) Whistle should be provide to flagman.
1) Allow only valid licence holder operator to operate vehicle.
2) Operator / Driver should be aware about the HCCB and Project Safety Guideline.
3) All necessary documents should be ensure as per HCCB requirement - Lifting tools and vehicle examination form, TPI, Insurance.
4) Alcoholic person strictly prohibited.
5) Trained Signal Man to be deployed.
6) Mobile phone not be allowed to driver or operator while driving.
7) Vehicle mechanical and hydraulic part condition and working to be inspect.
8) Before start the work inspect all lifting tools such as D shackles, Bow shackles, Web slings, wire rope slings, crane wire rope, crane hydraulic parts, limit
switch is in working, siren or horns is working.
9) Operator should have a clear view of the road.
10) Make sure Tank should be parallel to the ground while lifting.
11) Ensure the work area or access is even to avoid toppling of crain.
12) Material should be lift as per shape, size and weight.
13) Material should be carry as per the capacity of crane, lifting tools, do not allow to overloading..
14) Work should be carried out as per the submitted lifting plan.
15) Enclosed supervision should be provided. 0.1-Existing Controls
16) Guide rope should be provided. No action
17) Ensure no one be enter below suspended load. Adequate and Fully 16 LOW RISK required at this
18) Make sure load should not be suspended for long-time. Implemented time
19) Area should be barricaded and display appropriate signage.
20) TBT should be conducted before start the work.
21) PPE's to be provided - Full Body Safety Harness to be provided while installing lifting tools.
22) Confirmation by HCCB team for underground utilities.
23) Trained riggers should be deploy
24) Proper communication should be maintained between riggers and operator and flagman.
25) Whistle should be provide to flagman.
26) Fill - up checklist before start the work.

1) Avoid manual lifting whenever possible.


2) Provide mechanical aid like pallet trolley.
3) Do not use defective tools.
4) Do not carry material over the shoulder.
5) Never try to lift/shift materials beyond individual’s capacity.
6) Never place body parts in line of fire.
7) Awareness shall be made for pinch point hazards.
8) Don't allow to carry over weighted material.
9) Consider the volume, weight and shape of the objects while deciding the number of persons shall be used..
10) Sufficient manpower should be provide.
11) Avoid repetition, awkward posture, Forceful motion, Stationary position, direct pressure, etc..,
12) PTW system should be followed.
13) Material should be stacking as per size, shape, weight. 0.1-Existing Controls No action
14) Kinetic Techniques of lifting to be communicate via TBT and in-house training Adequate and Fully 22 LOW RISK required at this
15) Don't stack weighted material over height. Implemented time
16) Working and material storage area should be barricaded.
17) Provide appropriate signboards.
18) Provide and use PPE's.
19) Work should be carried out under the supervision.
20) Proper access/egress shall be provided.

1. On arrival of worker by bus the security Person or dedicated person will do the Contactless Thermal Scanning for each individual entering
the site. with wearing face shield, nose mask, hand gloves, etc.. temperature checking from outside the bus window and reading should be
recorded.
2. ensure all the workers/Visitors /staff should always wear surgical face mask.
3. Workers will be stand in 6 ft. distance to maintained social Distance near to the gate. till the security Clearance
4. Marking should be done in every 6 ft. distance to maintained social Distance near to the gate.
5. Paddle operated Hand sanitizer will be made available for Hand sanitizing.
6. Verification of the medical check up certificates from MBBS Doctor for each individual and obtaining self declaration form each to identify
any COVID RISK person.
7. during all these process the Social distancing norms of 6 ft. is maintained.
8. Similarly all vehicles should be sanitised by trained person before the vehicle enters in the premises.
9. Temp scanning will be carried out during the entering the site and while leaving the site.
10. in case covid’19 related symptoms observed in any person immediately send him to nearest covid’19 authorized hospital
11. Ensure used mask should be disposed at Bio medical waste dustbins at material gate.
12. Display of emergency contact number near security gate.
13. Frisking for pan masala/gutkha to be done at gate entry. NO SPITTING policy to be explained to the workers and in case of any violation to
be imposed as per clauses
14. Safe to Stay @ home if anyone have mild fever, cough and difficulty while breathing & seek medical assistance ASAP. Strictly 0.1-Existing Controls No action
follow the directions of your local health authority. Adequate and Fully 9 LOW RISK required at this
15. Keep up to date on the latest COVID-19 hotspots (cities or local areas where COVID-19 is spreading widely). Avoid traveling to Implemented time
places – especially senior citizens diabetic, having heart or lung diseases.
16.Avoid touching eyes, nose and mouth.
17.Avoid handshake with others.

18. MSDS of Disinfectant chemical should be explained to all concern person and Display the same near gate entrance

1).Hand gloves to be provided to workers to ensure that his hand doesn't gets injured due to sharp edges of material boxes.
2).Dust mask should provide for worker because of dust during house keeping.
3).Take the general work permit before the starting of work.
4).Area should be well illuminated.

0.1-Existing Controls No action


Adequate and Fully 27 LOW RISK required at this
Implemented time

1. Trained, competent and experienced workers should be deployed.


2. Ensure competency and expereince certificates.
3. Adequate safe storage practices need to be implemented.
4. Pre entry medical check - up should be done.
5. Only Safety inducted and trained workers should be deploy for the performing the work.
6. Induction and Work related trainings, TBT to be provide before start the work.
7. All workers are well known about the work activity.
8. HCCBPL Construction guideline and project EHS must be followed.
9. Task relevant PPES should be provided and PPES compliance register to be maintained.
10. Pre task meeting should be provided before start the work activity and supervison shall give correct information regarding the works and
what materails and tools need to be used .
11. Provision of welfare facilities like resting shelter ,rest room& lunch room etc.. shall be provided by the employer .Do not allow employees
to taking rest in outside area where snakeor other animal could present. 12.Ensure
provision of adequate illumination made available for all area.Many species are mainly nocturnal (night hunters) 13.Be
specially vigilant about snake after rains, during flooding, at harvest time and at nighttime.
14.Minimize the storage of construction materails at project
premise .because snakes have adapted to a wide range of habitats and prey species ,Also cover all pipe mouth by using end caps and open
hole and trench must be protected to prevent snake entering into there. Try not to provide hiding places for snakes 0.1-Existing Controls No action
15.Make Adequate and Fully 27 LOW RISK required at this
sure proper waste management and segregation of waste like seperate storage of general waste and food waste. All snakes are predatory Implemented time
carnivores, none is vegetarian although some eat eggs it may enter the ffod presrving area in search of food or to
find a hiding place for a while. Do not keep livestock, as snakes may come to hunt them. Store food in rat-proof containers.
16.Area cleanliness tidiness must be adopted to prevent breeding
of small animals such as rat,mouse as snakes prefer not to confront large animals such as humans so give them the chance to slither away.
17.Watch
18.Where you walk at dark area or during night Rather than walking bare-footed or wearing sandals, use proper shoes or long boots and
long trousers,pants especially when walking in the dark or in undergrowth. Step on to rocks or logs rather than straight over them – snakes
may be sunning themselves on the sides. Do not put hands into holes or nests or any hidden places where snakes might rest. Use a light
(torch, flashlight or lamp)when walking at night, especially after heavy rains and winter times .Dont touch apparently dead snakes – even an
accidental scratch from the fang of a snake’s severed head may injectvenom. 18.Need to
disply snake awarness poster and emergency plan along with contatc number at diffrent locations.
HIRA-REV-02
1) Keep the emergency exit area free from any obstacles. Classification: Public
2) Emergency lighting should be provided for that area.
3) Workers & employees should be trained with emergency evacuation procedure & exits.
4) In case detect any emergency situation gather in Safe assembly point.

0.1-Existing Controls No action


Adequate and Fully 5 LOW RISK required at this
Implemented time

Reviewed by Reviewed and Approved by

HCCB EHS Manager