HIRA Team Prepared by with the Reviewed by Approved by (only Understood and I have read and
members involvement of ---- (respective seniors) PD/ PM) agree to comply understood the
(workmen contents
representatives (communicated
names/ s/c names, down the line)
etc.,)
Name & role:
Signature
Anticipated
Probability
Population
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
personal safety, or
recklessness, or a
lack of interest in
• Job pre start meeting, Toolbox talk
/Serious or fatal
Injury, Major
Young and
workmen n
ignorance
meeting to be conducted
Showing
1*4=4(L)
EHSO
• New workmen should not be involved in
8(M)
Workmen 2 4
high risk activities
• New workmen to be only engaged with
experienced workmen
Manpower Mobilization
Serious or fatal
• Maintained Social Distance wherever
1*4=4(L)
entry.
12(H)
Workmen possible (Minimum 6 feet)
3 4
• Maintain Hygienic Habits.
• Check Body Temperature (bellow 98.5)
• To be Obey Client / PMC Rules and
Regulations,
• Spiting to avoid at work/ open place.
• Conducting training or campaign to be
done.
• Provided cushioning to the edges as far as
possible.
injury/Amputation &
Contact with sharp
Material handling
1*3=3(L)
objects
objects
9 (M)
shoe, Safety helmet & shoulder pads) are use handling aids where
2 3 3
ensured. possible
• Work force involved in the activity need to • Promote Human Behavior
be educated through training. campaign (Trainings, TBT etc.
• Supervision and clear access to be
ensured
• Ensuring reverse horn & Reverse light is in
(Transportation hazard)
1*4=4(L)
movement.
12(H)
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
lifting gears.
erection, improper selection of
lifting tools, faulty lifting tool &
Suspended Load (Unplanned
1*4=4(L)
damage
from height.,
• Maintain good housekeeping
16(H)
• Work related PPE to be worn.
4 collision with 4 4
• Use double tagline during lifting. • Area to be barricaded to avoid
nearby
structures • Provide signage & signal man. unauthorized entry
• Only competent operator is allowed to
operate the crane.
• Pre- Inspection should be carried out for
crane.
• All lifting gear will be inspected before use
• All power tools to be routed through SDBs
Electricity, Flying objects, Rotating
Foundation works (Drilling/
only
Chipping work & grinding
Serious or fatal
Injury, Major /
Electrocution, • Cables shall have plug tops and be • Work force involved in the
1*3=3(L)
works)
Worker
Impact of high- checked for proper insulation. activity need to be educated
parts,
9(M)
5 energy debris, 3 3 • All power tools to be inspected through training
Contact with • Machine guards are provided. • Ensure barricading
rotating parts, • Safety goggles/face shield & ear plugs to • Supervision to be ensured
Entanglement be ensured.
• Frequent breaks or job rotation to be
ensured
• Appropriate PPEs to be ensured
• Proper material management and
Foundation works (Reinforcement,
housekeeping to be ensured.
Slippery or uneven ground, poor
1*3=3(L)
among workmen while handling rebar or
• Maintain proper lux level
9(M)
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
• Hot work Permit need to be taken prior to • No rebar to be used for return
start of the hot work. lead.
1*4=4(L)
Material near to the 30 mA. among the workforce about the
12(H)
Fire, electricity,
7 damage. welding 3 4 • Body earthing to be done for the welding usage and necessity
welding fumes
area. machine if applicable
• Plug top to be ensured.
• Welding machine terminal points are to be
kept covered by a permanent means
always.
• Electrode holder must be in good quality &
condition
• Ensure that forward and return cables are
in good condition.
• Use proper cable connector for extension.
• Wear appropriate PPEs
• Hot work Permit need to be taken prior to
start of the hot work.
• Before starting make sure the area is clear
of all types of combustible materials.
• Use trolleys and secure the cylinders
• Store and secure cylinders in vertical
Gas cutting Operation
1*4=4(L)
Fire & explosion burns, Cutter • Soap water solution for leak
12(H)
or hoses/ Poor and torch.
8 due to Fatal, & 3 4 test to be carried.
handling of • Cordoning of the area.
flash back Material nearby • Daily checklist for cutting set to
cylinders
damage workers • Inspect the cylinders and hoses before
be ensured.
Burns starting the job.
• Shall keep the “Compressed Cylinder” in
well-ventilated area.
• Ensure Cylinder test certificate (HPT).
• Pressure gauges should be free from
damage
• Fire retardant cloth provided if cutting at
height.
Anticipated
Probability
Population
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
Serious or fatal
scaffolding erection.
Injury, Major /
safety harness.
Work man • Ensure the barricading work
1*4=4(L)
• 3-point contact shall be maintained while
16(H)
and area and signages.
9 4 4 using ladders
nearby • Ensure and provide the out-
workers • Hand tools fall protection to be considered.
trigger support for scaffolding
• Proper method (rope to tie materials) to be above 2 mtr work area.
followed during shifting of materials to
higher level and lower level
• Scaffolding to be properly secured
• Use vertical anchorage with fall arrestors
wherever applicable
• Shall suspend the work during wet weather
conditions & high winds.
• Ensure scaffolding materials should not be
kept over the working platform.
• PTW to be obtained.
• Ensure Scaffolding wheels should be lock
while working and erection.
• Ensure the supervisor during activity of
work.
Anticipated
Probability
Population
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
workmen
1*5=5(L)
20(H)
• Only competent crane operator and rigger beneath the lifted object.
10 4 5
allowed to performed the job. • Maintain safe distance from
• Ensure clear visibility between rigger and lifted objects.
crane operator. • Structural consultant approval
• Ensure appropriate outriggers pad and it is to be obtained before placing
free from damage the crane in the grade slab
• Inspect lifting gear and lifting equipment
prior to use.
• Use two Guide Ropes.
• Crane load chart must be strictly followed.
• Never go under suspended load.
• Ensure no hydraulic leakage of crane.
• Any person working above 2m height shall
Welding, Cutting and alignment work & removing
1*4=4(L)
16(E) • Working Platform made with 600 mm width
11 4 4 • Lifeline arrangement shall be
(only for workmen) & secured both sides, tied horizontally at the lifting
with guard rails, top, Mid handrails with toe location before material is
guard close to the work platform. lifted.
• Good means of access and egress shall
be provided.
• Use of Full body Harness with Double
lanyard shall be ensured.
• 16mm PP rope should be used as lifeline.
• Fire retardant cloth provided if cutting at
height
Anticipated
Probability
Population
Risk Level
Outcome
Possible
Severity
Rating
Rating
at risk
Risk
Sl Sub Hazardous
Hazard Existing Control Measure* Additional Control Measures Action By
No activity Event
and workmen
Major injury
• Only Authorized operator allowed to
Workman
arranged for operator/ Rigger/
1*4=4(L)
20(E)
operate winch machine. Fitter before lifting activity.
12 4 5
• Pre-Inspection should be done all tools & •Winch operation should be
tackles. maintaining running gap for
• Ensure Trained & Experienced Rigger/ release of tension during lifting.
Fitter.
• During Lifting operation winch rope should
be checked for heating/tension.
• Ensure no one should stand under
suspended load
• Avoid working during poor light and night
time.
• Trained gang to be used during erection.
NOTE: All necessary permits to be obtained from TCFM team prior to start works on daily basis.
____________________________________________
Project Manager/ Construction Manager / Section In-charge EHSO
* - Strike off what is not relevant