Project: IRIS-DIC
Consultant: Fahim Nanji and Desouza (PVT) Ltd.
Client: DIC Pakistan, Kasur.
Design By
Engr. Awais Ashraf
General Comments
1 Change client’s name to DIC as BSP is a separate client of FND. Yes Noted and Rectified.
2 Channels shall be supplied with end caps. Yes Noted
3 The support span shall be as per FND and NFPA specifications and there shall be no sagging. Yes
Connectors shall only be used to extend the length of threaded rods beyond their factory-set
limits. Currently, somewhere 2m long threaded rods are indicated with connectors. This should Threaded Rod Connectors has been proposed only for the drop greater than
4 Yes
be avoided. threaded rod's manufacturing length.
5 All sizes and quantities shall be taken from approved shop drawings Yes Quantities and sizes are taken from the drawings received from client side.
The deflection of channels shall be within allowable limits and shall not be visible from the naked
6 Yes
eye.
7 All pipes shall be supported within 1 ft for every change in direction. Yes
The support system shall be ordered with manufacturer-recommended spray to make amends
8 Yes
for galvanization damaged during cutting.
Specific Comments
The PEB supplier to review and accord approval to support the fire pipes from Z-Purlins as shown
on the supplier drawings. This is to be essentially obtained from PEB supplier before placement
1 Client's/Contractor's Scope.
of order for the pipe supports to the supports supplier. The loading requirements of the support
components shall be duly checked with respect to the purlins of PEB structure.
The submittal of “In-Rack” sprinklers supports is on hold. This will be reviewed once we have
2 Noted.
clarity and IFCs of in-rack sprinklers.
The sidewall supports to be resubmitted without the bracing channel. Revised design without bracing is attached by considering FOS 2. We can only
design WM support without bracing by using FOS 2. As per NFPA 13 we have
3 Yes to consider Factor of safety 5 with additional weight of 115kg for which bending
utilization exceeds from 100% for channels and also for connection that’s why
bracing is required).
Page 1 of 2
COMMENTS COMPLIANCE - TECHNICAL SUBMITTAL Normal
Fire Fighting Pipe Supports System
Kasur 15/01/2024
Project: DIC
Consultant: F.N.D
Client: DIC Pakistan, Kasur
Sr. Consultant Comments Compliance Fischer Remarks
Size of channel is to be re-checked. For dia 32mm pipe, the channel size of 40mm is too high.
4 Yes Revised design is attached with channel FUS 21/2.0 by using FOS 2.
The floor-mounted supports shall be placed over a CC pad. The dimensions of the pad will be
5 Yes Floor Mounted Supports pad design is attached.
shared by the supports supplier and constructed by civil contractor. Currently this is not shown.
FND has observed that certain offered support systems have greater safety margin for instance
6 in threaded rods and channels for sidewall supports. FND advises that these supports shall be Yes Please See Comment No. 3
revaluated by the supplier to make the support system cost effective.
7 The submittal of Transverse and Longitudinal Seismic bracing is missing. Yes Noted and will be provided later after the confirmation from client's side.
Seismic Restraints shall be used for pipe sizes up to 2”. Seismic bracings to be used for pipe sizes
8 Yes See Above Comment.
above 2”.
The supplier is requested to confirm how supports/anchors will be fixed in shafts/ vertical risers. Chemical Anchoring is proposed for masonary walls for vertical risers. Design is
9 Yes
If RCC wall is not available then what would be the mode of anchoring? attached.
Page 2 of 2
Wall Mounted Pipe Supports
System
0
0
2
4.8
C 25/30
Selection Chart For Fire Fighting Pipe Wall/Column/Beam Mounting Support System
Design Data Proposed Material
inch m kg/m kg KN
1 Sch 40 Steel ø4" 3 24.3 73 1.46 U-Strap USP 114 U-Channel 41/2.0 SF L 41 SKSL 10x30 FCN Clix P10 FAZ II 10/10
2 Sch 40 Steel ø3" 3 16 48 0.96 U-Strap USP 89 U-Channel 41/2.0 SF L 41 SKSL 10x30 FCN Clix P10 FAZ II 10/10
3 Sch 40 Steel ø1-1/4" 3 4.3 13 0.26 U-Strap USP 42 FUS 21/2.0 SF L 41 SKSL 10x30 FCN Clix P10 FAZ II 10/10
General Notes:-
1) Self-weight of the Hanging Supports is incorporated in the Safety Factor.The user has the responsibility to check whether the present conditions on site and the anchors, setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting the product for the individual application
is with the customer.
Originator
Street
ZIP Code, location
Tel. / Fax
Project DIC
Construction project Fire Pipe Wall Mounted Support System INSTALL-FIX 1.5.0.72 1/15/2024
Comment Fire Pipe Size- ø100 Page 1 of 8
Inputs
System
Knot
Knot x [mm] y [mm] z [mm] Conditions
1 0 0 0 Ux Uy Uz Vx Vy Vz
2 350 0 0
(Restraint of movement in the axes has to be considered)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 2 of 8
Materials
Material E [N/mm²] fy [N/mm²] fu [N/mm²]
Profiles
Profile A [mm²] Iy [mm^4] Iz [mm^4] Wy [mm³] Wz [mm³] Sy [mm³] Sz [mm³]
Beams
Beam Knot Material Profile Conditions
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 3 of 8
Loads
Point load
ID Distance [mm] Load [kN] Load type
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 4 of 8
Result
Beam forces
Beam Distance [mm] Nd [kN] Vzd [kN] Myd [kNm]
Stress
Beam 1
Decisive load combination 1.35 * g + 1.00 * G1
Shear force VEd 1.47 kN
shear load capacity Vb,Rd 22.62 kN
shear force utilisation βV = |VEd | / Vb,Rd 6.50 %
Moment MEd -0.29 kNm
moment load capacity MRd 0.62 kNm
bending utilisation βM = |MEd | / MRd 47.37 %
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 5 of 8
Support forces
Support SF L 41
Moment MEd -0.29 kNm
moment load capacity MRd 0.30 kNm
bending utilisation βM = |MEd | / MRd 97.90 %
Shear force VEd 1.47 kN
shear load capacity VRd 6.70 kN
shear force utilisation βV = |VEd | / VRd 21.94 %
Reaction
Support Fx [kN] Fz [kN] My [kNm]
1 0 1.47 -0.29
(The datas belong to the support reactions at the channel and may vary from the anchor loads.)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 6 of 8
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 7 of 8
post deformation
Beam Distance [mm] ux [mm] uz [mm] u [mm] permissible β [%]
deformation
[mm]
1 350.0 0.0 -0.7 0.7 2.3 31.82
Deformation
Beam 1
Decisive load combination 1.00 * g + 1.00 * G1
post length l 350.00 mm
Limitation of deformation w 1/150
permissible deformation u' =l·w 2.33 mm
actual deformation u 0.74 mm
Deformation βD = u / u' 31.82 %
Proof successful!
Bill of material
Group Article number Name Number Weight PU Number of PU
System 40390 FUS 41/2.0 (350 mm) 1 0.74 kg 1 1
fastener 504355 SF L 41 1 0.70 kg 10 1
079726 U 10 x 28 2 0.01 kg 100 1
079417 SKS 10 x 30 2 0.03 kg 100 1
559759 FCN CLIP P 10 2 0.03 kg 50 1
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø100 1/15/2024
Page 8 of 8
Technical Remarks
• The calculation of the channels is according the elastic-elastic method according to DIN EN 1993-1-3: 2006 + AC:2009. The calculation of the connectors and pipe
clamps is based on a combination of different calculation models based on DIN EN 1993-1-3:2006 + AC:2009 and internal tests.
• The determination of the stresses and load combinations is based on DIN EN 1990:2002 + A1:2005 + A1:2005/AC:2010.
• Stability analysis like buckling or lateral-torsional buckling, as well as distortion is not covered by Install-Fix. If required, the analysis must be conducted by the
responsible engineer and hedged by structural measures. If necessary, the fischer technical support can be contacted.
• In places where user defined loads are acting, local stresses and deformations in the components are not considered. As the user defined loads do not indicate in
what way the load is applied into the system components it cannot be calculated by Install-Fix. In this case this must be taken into account by the engineer in charge
• The deflection of the channels is based on the observation of a single beam (length node to node, or bearing to bearing). The maximum allowable deflection can b
selected by the engineer in the program settings.
• Restrains and stresses of system effects (temperature-induced expansion of pipelines, etc.) are not covered by the analysis.
• The welding joints at, e.g. cantilever brackets are taken into account through internally audited system tests and will not be calculated separately.
• The calculation is based on the assumption that all actions are static or semi static. Effects of dynamics and seismic actions are not covered.
• All variable loads are take into account as unified, other load types in the load combinations with ψ2 = 0.8.
• Fire actions and fire resistance are not covered by the design in Install-Fix.
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Originator
Street
ZIP Code, location
Tel. / Fax
Project DIC
Construction project Fire Pipe Wall Mounted Support System INSTALL-FIX 1.5.0.72 1/15/2024
Comment Fire Pipe Size- ø75 Page 1 of 8
Inputs
System
Knot
Knot x [mm] y [mm] z [mm] Conditions
1 0 0 0 Ux Uy Uz Vx Vy Vz
2 350 0 0
(Restraint of movement in the axes has to be considered)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 2 of 8
Materials
Material E [N/mm²] fy [N/mm²] fu [N/mm²]
Profiles
Profile A [mm²] Iy [mm^4] Iz [mm^4] Wy [mm³] Wz [mm³] Sy [mm³] Sz [mm³]
Beams
Beam Knot Material Profile Conditions
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 3 of 8
Loads
Point load
ID Distance [mm] Load [kN] Load type
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 4 of 8
Result
Beam forces
Beam Distance [mm] Nd [kN] Vzd [kN] Myd [kNm]
Stress
Beam 1
Decisive load combination 1.35 * g + 1.00 * G1
Shear force VEd 0.97 kN
shear load capacity Vb,Rd 22.62 kN
shear force utilisation βV = |VEd | / Vb,Rd 4.29 %
Moment MEd -0.19 kNm
moment load capacity MRd 0.62 kNm
bending utilisation βM = |MEd | / MRd 31.24 %
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 5 of 8
Support forces
Support SF L 41
Moment MEd -0.19 kNm
moment load capacity MRd 0.30 kNm
bending utilisation βM = |MEd | / MRd 64.57 %
Shear force VEd 0.97 kN
shear load capacity VRd 6.70 kN
shear force utilisation βV = |VEd | / VRd 14.47 %
Reaction
Support Fx [kN] Fz [kN] My [kNm]
1 0 0.97 -0.19
(The datas belong to the support reactions at the channel and may vary from the anchor loads.)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 6 of 8
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 7 of 8
post deformation
Beam Distance [mm] ux [mm] uz [mm] u [mm] permissible β [%]
deformation
[mm]
1 350.0 0.0 -0.5 0.5 2.3 20.98
Deformation
Beam 1
Decisive load combination 1.00 * g + 1.00 * G1
post length l 350.00 mm
Limitation of deformation w 1/150
permissible deformation u' =l·w 2.33 mm
actual deformation u 0.49 mm
Deformation βD = u / u' 20.98 %
Proof successful!
Bill of material
Group Article number Name Number Weight PU Number of PU
System 40390 FUS 41/2.0 (350 mm) 1 0.74 kg 1 1
fastener 504355 SF L 41 1 0.70 kg 10 1
079726 U 10 x 28 2 0.01 kg 100 1
079417 SKS 10 x 30 2 0.03 kg 100 1
559759 FCN CLIP P 10 2 0.03 kg 50 1
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø75 1/15/2024
Page 8 of 8
Technical Remarks
• The calculation of the channels is according the elastic-elastic method according to DIN EN 1993-1-3: 2006 + AC:2009. The calculation of the connectors and pipe
clamps is based on a combination of different calculation models based on DIN EN 1993-1-3:2006 + AC:2009 and internal tests.
• The determination of the stresses and load combinations is based on DIN EN 1990:2002 + A1:2005 + A1:2005/AC:2010.
• Stability analysis like buckling or lateral-torsional buckling, as well as distortion is not covered by Install-Fix. If required, the analysis must be conducted by the
responsible engineer and hedged by structural measures. If necessary, the fischer technical support can be contacted.
• In places where user defined loads are acting, local stresses and deformations in the components are not considered. As the user defined loads do not indicate in
what way the load is applied into the system components it cannot be calculated by Install-Fix. In this case this must be taken into account by the engineer in charge
• The deflection of the channels is based on the observation of a single beam (length node to node, or bearing to bearing). The maximum allowable deflection can b
selected by the engineer in the program settings.
• Restrains and stresses of system effects (temperature-induced expansion of pipelines, etc.) are not covered by the analysis.
• The welding joints at, e.g. cantilever brackets are taken into account through internally audited system tests and will not be calculated separately.
• The calculation is based on the assumption that all actions are static or semi static. Effects of dynamics and seismic actions are not covered.
• All variable loads are take into account as unified, other load types in the load combinations with ψ2 = 0.8.
• Fire actions and fire resistance are not covered by the design in Install-Fix.
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Originator
Street
ZIP Code, location
Tel. / Fax
Project DIC
Construction project Fire Pipe Wall Mounted Support System INSTALL-FIX 1.5.0.72 1/15/2024
Comment Fire Pipe Size- ø32 Page 1 of 8
Inputs
System
Knot
Knot x [mm] y [mm] z [mm] Conditions
1 0 0 0 Ux Uy Uz Vx Vy Vz
2 300 0 0
(Restraint of movement in the axes has to be considered)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 2 of 8
Materials
Material E [N/mm²] fy [N/mm²] fu [N/mm²]
Profiles
Profile A [mm²] Iy [mm^4] Iz [mm^4] Wy [mm³] Wz [mm³] Sy [mm³] Sz [mm³]
Beams
Beam Knot Material Profile Conditions
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 3 of 8
Loads
Point load
ID Distance [mm] Load [kN] Load type
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 4 of 8
Result
Beam forces
Beam Distance [mm] Nd [kN] Vzd [kN] Myd [kNm]
Stress
Beam 1
Decisive load combination 1.35 * g + 1.00 * G1
Shear force VEd 0.27 kN
shear load capacity Vb,Rd 11.02 kN
shear force utilisation βV = |VEd | / Vb,Rd 2.41 %
Moment MEd -0.05 kNm
moment load capacity MRd 0.23 kNm
bending utilisation βM = |MEd | / MRd 22.99 %
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 5 of 8
Support forces
Support SF L 41
Moment MEd -0.05 kNm
moment load capacity MRd 0.30 kNm
bending utilisation βM = |MEd | / MRd 17.62 %
Shear force VEd 0.27 kN
shear load capacity VRd 6.70 kN
shear force utilisation βV = |VEd | / VRd 3.97 %
Reaction
Support Fx [kN] Fz [kN] My [kNm]
1 0 0.27 -0.05
(The datas belong to the support reactions at the channel and may vary from the anchor loads.)
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 6 of 8
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 7 of 8
post deformation
Beam Distance [mm] ux [mm] uz [mm] u [mm] permissible β [%]
deformation
[mm]
1 300.0 0.0 -0.6 0.6 2.0 30.14
Deformation
Beam 1
Decisive load combination 1.00 * g + 1.00 * G1
post length l 300.00 mm
Limitation of deformation w 1/150
permissible deformation u' =l·w 2.00 mm
actual deformation u 0.60 mm
Deformation βD = u / u' 30.14 %
Proof successful!
Bill of material
Group Article number Name Number Weight PU Number of PU
System 40391 FUS 21/2,0 (300 mm) 1 0.44 kg 1 1
fastener 504355 SF L 41 1 0.70 kg 10 1
079726 U 10 x 28 2 0.01 kg 100 1
079417 SKS 10 x 30 2 0.03 kg 100 1
559759 FCN CLIP P 10 2 0.03 kg 50 1
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Project DIC
Construction project Fire Pipe Wall Mounted Support System
Comment Fire Pipe Size- ø32 1/15/2024
Page 8 of 8
Technical Remarks
• The calculation of the channels is according the elastic-elastic method according to DIN EN 1993-1-3: 2006 + AC:2009. The calculation of the connectors and pipe
clamps is based on a combination of different calculation models based on DIN EN 1993-1-3:2006 + AC:2009 and internal tests.
• The determination of the stresses and load combinations is based on DIN EN 1990:2002 + A1:2005 + A1:2005/AC:2010.
• Stability analysis like buckling or lateral-torsional buckling, as well as distortion is not covered by Install-Fix. If required, the analysis must be conducted by the
responsible engineer and hedged by structural measures. If necessary, the fischer technical support can be contacted.
• In places where user defined loads are acting, local stresses and deformations in the components are not considered. As the user defined loads do not indicate in
what way the load is applied into the system components it cannot be calculated by Install-Fix. In this case this must be taken into account by the engineer in charge
• The deflection of the channels is based on the observation of a single beam (length node to node, or bearing to bearing). The maximum allowable deflection can b
selected by the engineer in the program settings.
• Restrains and stresses of system effects (temperature-induced expansion of pipelines, etc.) are not covered by the analysis.
• The welding joints at, e.g. cantilever brackets are taken into account through internally audited system tests and will not be calculated separately.
• The calculation is based on the assumption that all actions are static or semi static. Effects of dynamics and seismic actions are not covered.
• All variable loads are take into account as unified, other load types in the load combinations with ψ2 = 0.8.
• Fire actions and fire resistance are not covered by the design in Install-Fix.
The input values and the design results and the installation should be checked against local valid standards and approvals. Please respect
the disclaimer of warranty in the license Agreements of the Software.
Chemical Anchoring for Fire Pipe
Vertical Riser Pipes For Areas where
RCC Wall/Columns are not available
Thickness of Insulation 0
Density of Insulation 0
Safety Factor 5 Plus 115kg
Threaded Rod Material Grade 4.8
Concrete C 25/30
Selection Chart For Fire Fighting Pipe Floor Mounting Support System
Design Data Proposed Material
Water Filled Pipe Water Filled Pipe Fischer Threaded Rod For
Pipe Size Max Spacing Factored Load as per NFPA Fischer Pipe Clamp Fischer Channel Fischer Hex. Bolt Fischer Channle Nut Fischer Chemical
Sr No Pipe Material Weight per Meter Weight Chemical Anchoring
inch m kg/m kg KN
1 Sch 40 Steel ø6" 3 46.8 140 8.17 U-Strap USP 168 U-Channel 41/2.0 SKSL 10x30 FCN Clix P10 FIS V Plus 360 TRS M12
2 Sch 40 Steel ø4" 3 24.3 73 4.80 U-Strap USP 114 U-Channel 41/2.0 SKSL 10x30 FCN Clix P10 FIS V Plus 360 TRS M12
3 Sch 40 Steel ø3" 3 16 48 3.55 U-Strap USP 89 U-Channel 41/2.0 SKSL 10x30 FCN Clix P10 FIS V Plus 360 TRS M10
4 Sch 40 Steel ø2-1/2" 3 11.7 35 2.91 U-Strap USP 72 U-Channel 41/2.0 SKSL 10x30 FCN Clix P10 FIS V Plus 360 TRS M10
5 Sch 40 Steel ø1-1/4" 3 4.3 13 1.80 U-Strap USP 42 FUS 21/2.0 SKSL 10x30 FCN Clix P10 FIS V Plus 360 TRS M10
General Notes:-
1) Self-weight of the Hanging Supports is incorporated in the Safety Factor.The user has the responsibility to check whether the present conditions on site and the anchors, setting tools etc. intended to use comply with the conditions given. The ultimate responsibility for selecting the product for the individual application is with the customer.
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
fischer FZE
Enquiry@fischer.ae
www.fischer.ae
Comment
Chemical Anchoring for areas where RCC wall/columns are not available.
Design Specifications
Anchor
Anchor system fischer Injection system FIS V Plus for masonry
Injection resin FIS V Plus 360 S
Fixing element Threaded rod FIS A M 12 x 120,
zinc plated steel, Property Class 5.8
Calculated anchorage 100 mm
depth
Design Data Anchor design in Masonry according European Technical
Assessment ETA-20/0729,
Issued 26/11/2020
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 1
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Input data
Design actions *⁾
# NSd VSd,x VSd,y MSd,x MSd,y MT,Sd Type of loading
kN kN kN kNm kNm kNm
1 0.61 0.61 0.00 0.00 0.00 0.00 Permanent-Transient/Static
1
Most unfavourable anchor
Steel failure
(NRd,s)
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 2
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Pullout failure
(NRd,p)
(NRd,b)
g g g
αj,N N Rk γM,m N Rd NSd β N,b
kN kN kN %
1.00 8.25 2.50 3.30 0.61 18.5
(NRd,pb)
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 3
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
(VRd,s)
(VRd,b)
g g g
αj,V V Rk γM,m V Rd VSd β V,b
kN kN kN %
1.00 4.90 2.50 1.96 0.61 31.1
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 4
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Eq. C.5.8c
Technical remarks
The transmission of the anchor loads to the support shall be shown for the ultimate limit state and the serviceability limit
state. For this purpose, the normal verifications shall be carried out under consideration of the actions introduced by the
anchors. For these verifications the provisions given in the current design method shall be taken into account.
As a pre-condition the anchor plate is assumed to be flat when subjected to the actions. Therefore, the plate must be
sufficiently stiff. The C-Fix anchor plate design is based on a proof of stresses and does not allow a statement about
the stiffness of the plate. The proof of the necessary stiffness is not carried out by C-Fix.
During the design process, the following hints and warnings were issued:
• In the current view a bottom edge is selected. Assuming this as joint from the masonry to the concrete slab we don't
do any calculation for edge failure in this case.
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 5
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Installation data
Anchor
Anchor system fischer Injection system FIS V Plus
for masonry
Injection resin FIS V Plus 360 S (other cartridge Art.-No. 558747
sizes available)
Fixing element Threaded rod FIS A M 12 x 120, Art.-No. 44971
zinc plated steel, Property Class 5.8
Installation details
Thread diameter M 12
Drill hole diameter d0 = 14 mm
Drill hole depth h1 = 100 mm
Calculated anchorage hef = 100 mm
depth
Drilling method Hammer drilling or rotary drilling with
carbide drill bit
Installation type Pre-positioned installation
Installation torque Tinst,max = 10.0 Nm
Socket size 19 mm
Socket size 19 mm
Base plate thickness t = 2 mm
Total fixing thickness tfix = 2 mm
Tfix,max
Attachment
Profile type None
Anchor coordinates
x y
Anchor no. mm mm
1 -100 0
2 100 0
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 6
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
fischer FZE
Enquiry@fischer.ae
www.fischer.ae
Comment
Chemical Anchoring for areas where RCC wall/columns are not available.
Design Specifications
Anchor
Anchor system fischer Injection system FIS V Plus for masonry
Injection resin FIS V Plus 360 S
Fixing element Threaded rod FIS A M 10 x 130,
zinc plated steel, Property Class 5.8
Calculated anchorage 100 mm
depth
Design Data Anchor design in Masonry according European Technical
Assessment ETA-20/0729,
Issued 26/11/2020
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 1
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Input data
Design actions *⁾
# NSd VSd,x VSd,y MSd,x MSd,y MT,Sd Type of loading
kN kN kN kNm kNm kNm
1 0.21 0.21 0.00 0.00 0.00 0.00 Permanent-Transient/Static
1
Most unfavourable anchor
Steel failure
(NRd,s)
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 2
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Pullout failure
(NRd,p)
(NRd,b)
g g g
αj,N N Rk γM,m N Rd NSd β N,b
kN kN kN %
1.00 6.75 2.50 2.70 0.21 7.8
(NRd,pb)
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 3
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
(VRd,s)
(VRd,b)
g g g
αj,V V Rk γM,m V Rd VSd β V,b
kN kN kN %
1.00 4.20 2.50 1.68 0.21 12.5
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 4
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Eq. C.5.8c
Technical remarks
The transmission of the anchor loads to the support shall be shown for the ultimate limit state and the serviceability limit
state. For this purpose, the normal verifications shall be carried out under consideration of the actions introduced by the
anchors. For these verifications the provisions given in the current design method shall be taken into account.
As a pre-condition the anchor plate is assumed to be flat when subjected to the actions. Therefore, the plate must be
sufficiently stiff. The C-Fix anchor plate design is based on a proof of stresses and does not allow a statement about
the stiffness of the plate. The proof of the necessary stiffness is not carried out by C-Fix.
During the design process, the following hints and warnings were issued:
• In the current view a bottom edge is selected. Assuming this as joint from the masonry to the concrete slab we don't
do any calculation for edge failure in this case.
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 5
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Installation data
Anchor
Anchor system fischer Injection system FIS V Plus
for masonry
Injection resin FIS V Plus 360 S (other cartridge Art.-No. 558747
sizes available)
Fixing element Threaded rod FIS A M 10 x 130, Art.-No. 90279
zinc plated steel, Property Class 5.8
Installation details
Thread diameter M 10
Drill hole diameter d0 = 12 mm
Drill hole depth h1 = 100 mm
Calculated anchorage hef = 100 mm
depth
Drilling method Hammer drilling or rotary drilling with
carbide drill bit
Installation type Pre-positioned installation
Installation torque Tinst,max = 10.0 Nm
Socket size 17 mm
Socket size 17 mm
Base plate thickness t = 2 mm
Total fixing thickness tfix = 2 mm
Tfix,max
Attachment
Profile type None
Anchor coordinates
x y
Anchor no. mm mm
1 -60 0
2 60 0
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 6
Anchoring Design for Floor
Mounted Supports with Concrete
PAD
DIC
fischer FZE
Enquiry@fischer.ae
www.fischer.ae
Comment
Floor Mounting Anchoring Design with Base Concrete PAD-For Pipe Size -ø10", 8" & 6"
Design Specifications
Anchor
Anchor system fischer Bolt Anchor FAZ II Plus
Anchor Bolt Anchor FAZ II Plus 10/10,
zinc plated steel
Calculated anchorage 60 mm
depth
Design Data Anchor design in Concrete according European Technical
Assessment ETA-19/0520, Option 1,
Issued 24/05/2023
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 1
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Input data
Design actions *⁾
# NSd VSd,x VSd,y MSd,x MSd,y MT,Sd Type of loading
kN kN kN kNm kNm kNm
1 -6.13 0.00 0.00 0.00 0.00 0.00 Permanent-Transient/Static
Proof successful
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 2
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Technical remarks
All data and information in the software is based on fischer products and common engineering knowledge. Please
check all the proof results against local valid standards and approvals.
As fischer is not the design office, the attached is no guarantee for incorrect input or assumptions. Any
recommendations have to be approved by the building-authority or project engineer. Results are valid only for
anchor system calculated in the attached. If any part of the system is changed, it will invalidate this report and new
calculations would be required.
The transmission of the anchor loads to the supports of the concrete member shall be shown for the ultimate limit state and
the serviceability limit state; for this purpose, the normal verifications shall be carried out under due consideration of the
actions introduced by the anchors. For these verifications the additional provisions given in the current design method shall
be taken into account.
As a pre-condition the anchor plate is assumed to be flat when subjected to the actions. Therefore, the plate (if present) must
be sufficiently stiff. The C-Fix anchor plate design is based on a proof of stresses and does not allow a statement about the
stiffness of the plate. The proof of the necessary stiffness is not carried out by C-Fix.
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 3
C-FIX 1.120.0.0
Database version
2023.11.3.17.23
Date
15/01/2024
DIC
Installation data
Anchor
Anchor system fischer Bolt Anchor FAZ II Plus
Anchor Bolt Anchor FAZ II Plus 10/10, Art.-No. 564579
zinc plated steel
Installation details
Thread diameter M 10
Drill hole diameter d0 = 10 mm
Drill hole depth h2 = 85 mm
Calculated anchorage hef = 60 mm
depth
Installation depth hnom = 72 mm
Drilling method Hammer drilling
Borehole cleaning Clear the borehole with a hand
blower.
The installation instructions should
be followed when installing without
borehole cleaning.
Installation type Push-through installation
Annular gap Annular gap not filled
Installation torque Tinst = 45.0 Nm
Socket size 17 mm
Base plate thickness t = 6 mm
Total fixing thickness tfix = 6 mm
Tfix,max tfix, max = 10 mm
Attachment
Profile type Customized profile
Profile dimensions mm
Height 42
Web thickness 2
Flange thickness 2
Load application on X-axis 18
Anchor coordinates
x y
Anchor no. mm mm
1 -60 0
2 60 0
The input values and the design results should be checked against local valid standards and approvals. Please respect the disclaimer of warranty in
the license agreement of the Software.
Page 4
Technical Data Sheets