Prepaid Meter Software User Manual
1.1 See electricity card meter selling system
1.1 See electricity card meter selling system
All of the selling system need software and hardware are composed of advanced prepayment
meter, IC card read-write meter, IC card and computer terminal management system.
About IC card
It uses a standard encrypted IC card which keeps secret good, on the safe side, currency better
and cost lowly. It tends to popularize and adopt at large.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
System provides menu, shortcut toolbar and tool panel so that user can enter into each module
expediently. Menus are composed of the control of all system function module, shortcut toolbar
is composed of daily operation and in common use correlation module. You can very expediently
use each module which you has operating jurisdiction.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
1.Logging on management
System provides handy using logging on module and logout temporarily module which
guarantees secure
Operating personnel can setup operation jurisdiction and password, entering system after
logging on.
In order to adapt every Operating personnel’s individual fancy, you can select the background
picture.
It has facility calculator for check operation.
2.daily operation
We put the emphases of this module on management of using electricity application and selling
electricity business. At the same time we collect the operation of business. In general, daily
operation management connects every step together, and step by step collects and cleans up
the users’ using electricity files.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
It has the function of buying electricity card after normal time. After emitting the electricity card, if
you lose it, you can instead it by the method of re-buy the card.
3. User management
Module will completely manage the using electricity identity of the users’ in the popedom,
increasing the function of multilevel check.
When calculating the amount of users’ using electricity, it will check the rationality of the users’
using identity. After calculating the amount of users’ using electricity every month, which will be
analyzed, the result shows visualizing in data list and all kinds of figures.
In order to see the change trend of users’ using electricity in every month of the same year and
compare to the electricity amount at the same time last year, the result shows visualizing in data
list and all kinds of figures.
It can find users’ using abnormity in time and contrapose checking.
7. Online help
The system provides helping module. Helping shortcut key is F1.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
[user’s buying electricity data] Save user’s buying meter file and buying electricity information.
[buying electricity list table] Save user’s particular buying electricity information in the form of
water book.
This four table hereinbefore are the main body of the system. Others as supplement serve for the
system.
[using electricity check table] Note the trouble of user’s meter and the result of checking.
[copying and noting meter table] Power supply department should check electricity using at fix
time, and note the data.
[meter type table] In order to manage different factories’ meter we use code management for
meter’s type.
[meter price table] In order to adjust uniformly the price we use code management for meter’s
price.
[line area table] In order to analyze and count according to buildings we use code management
for line and area.
[operator table] It provides strictness operation jurisdiction management. System administrator
can adjust operator’s using jurisdiction according as need. Everyone logging on will be noted in
[operator table], so it provides strictness safe management.
NOTE:
1. You also can change the installation route of system to such as D:\DBMIS6E
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
2. After the installation finished, you must restart the computer, otherwise the system possibly
cannot be operated normally.
Localization database
When starts this system first time, it will demonstrate the orientation system database depositing
route dialog box.
System database should be “BMIS6MDB”, being put in the mainframe server shared directory.
Mainframe data server:
The database file route name is “\DBMIS6E\DATA”.
Business office workstation:
We should find the network route of mainframe server from “network neighbor”, the database file
way name for “\\XXXXX\\DBMIS6E\DATA” . (XXXX is network route)
Attention:
If it uses in the local area network, before starts this management system, it should first map the
mainframe server database shared directory mapping for network driver, it can improve the
system performance.
After only had has been correctly locating the depositing way, in the system database connection,
only then could demonstrate the registered window of boot-start personnel.
If you choose the mistake depositing route, the system database has not connected, which can
force the automatic shut-off withdrawal. So we should please the specialized system manager
establish processing.
When starting register after the system primary installation, the “code” identify
operator’s number, for example:
Operator’s name=administrator operator’s
number=800001 operator’s password=800001
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
This time single-clicks [confirm] the button, enters “system setup maintaining” window.
Inputs in turn‘charge station number’,‘station name’,‘management unit name’ ‘system registration
code’, ‘database route’ five field value, after proofreading is unmistakable, clicks on “Save setup”
button to register.
Please note:
1. If it only progresses in one computer for management, you must setup 0= master station
server.
2. If it will carry on the installment management on many computers, each computer must form
the local area network.
3. Please determine one of the computers as “master station server”, others set up as
“secondary charge station”.
4. The system databases must deposit to the “master station server” directory which has the
jurisdiction of read-write sharing visiting.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Warning! ! !
8 After using the system formally, the registration code can not be changed. If changed the
registration code, the meter has installed will cannot buy the electricity or refuse to read in the
buying electricity card! ! !
After the registration, please inform us yours contact method and the E-mail address, so that the
technical support personnel can provide the technical service and the software promotion in
time.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Attention:
If your computer has not connected the read card, you should choose “Hasn’t connected the
read card” option. Otherwise the system will be able a longer time not to reflect because of
attempting to seek the read card.
After entering the “Management system tool” “receipt setup” windows, you can input “revenue
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
register” in turn according to the prompt. Then you single click the [the choice...] Button to
choose the receipt model. After completing the choice, single-click to look at the user receipt in
advance.
After thought appropriate, single-click [preserved receipt setup] button will select the choice
model as current receipt model.
Because each place requests to the receipt form different, if thought not appropriately, please
provide your unit receipt type to produce the new receipt model from, we will increase it to the
system.
Attention:
1. When single-click on the receipt [the revision …] , you can enter the system’s report form
design to carry on the work, because the report form designing software need more specialized
knowledge, it must be carried on the revision by the specialist. You also can demand the detailed
technical data of report form designing software.
2. This function to be able to use by who has the system manager's jurisdiction.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
3. The receipt type preservation route must be the mainframe server shared directory
(..\DATA\GDFP\)
Click on the picture of the [surface setup], the user can use the picture which likes to replace
the system master routine the background picture. After replacing you should click on
[preserved contact surface establishment].
«The DBMIS6 management system of the advanced prepayment meter» has the unloading
function. In “beginning>setup” click on “control panel” option, double click ‘add/delete program’,
you pitch on«The DBMIS6 management system of the advanced prepayment meter»in
‘setup/delete’ option, then click “add/delete” button, it will unload the «The DBMIS6 management
system of the advanced prepayment meter». so long as you act according to prompt do, then will
succeed unloads.
After reinstalling the system, you must copy the database file to the corresponding table of
contents in (\DBMIS6E\DATA\). Or renew the backup after the system database initialization the
data. (Please see “database renew”)
You can click on the menu [setup to maintain -> personnel electrovalence setup] to enter the
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
personnel setup. Like chart 3.1
shows:
Operator may carry on comparative table increase, deletion, revision and maintenance
management and so on.
System manager
He authorizes to carries on the system comparative table establishment, the assignment
operator jurisdiction, eliminates other personnel's password passwords. He authorizes to carries
on the system database to revise, to renew and so on the database maintenance.
Business sells the electricity
He authorizes to open an account, carry on electricity, user information change, adjustment user
capacity and electrovalence business supervisory work and so on..
Meter manager
He authorizes to carries on the electric meter to go into storage, replacement the electric meter
work and so on.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Meter counting controller
He has the right to do the electric meter management work of putting the electric meter into the
storage, altering or changing the electric meter.
Attention:
1. The personnel serial numbers cannot duplicate,
2. After the increase or the revision must saves then can be effective;
3. After changes some operator's jurisdiction, it plays the role only after pass through register
over again,
4. The “administrator” of system establishes in advance can not delete.
You can click on the menu [setup to maintain -> personnel electrovalence setup] to enter the
electric meter type establishment.
The system already in advance is equipped with several kinds of commonly used electric meter
types, you also can increase when the electric meter go into storage.
Noun explanation:
Electric meter constant
The plate rotation (r/kWh) or pulse number (imp/kWh) of electrical energy meter 1 degree.
Example: 3,200imp/kWh
Meter amperage, overload multiple
It reflects the electrical energy meter’s demarcating (fixed) electric current, the maximum current.
Example: 5 (20) A, the demarcating electric current =5A, the overload multiple is 20/5=4, is
named 4 time of tables.
For example: In some electric meter data plate has: 220V 10 (40) A 50Hz 1600imp/kWh
parameter marking.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Indicated: The single phase meter, electric meter voltage =220V, ammter amperage =10A,
overload multiple =4, electric instrument constant =1600.
Setup explanation
1: Because the electric instrument has the different specification, respectively produces the
factory production the electric instrument model to be different, the system selects in the
comparative table method connections other table of the database, after revises the electric
instrument type comparative table, the system automatically completes the corresponding
maintenance.
2: The most main parameter of various specifications, various factories’ electric meter is the
electric meter constant, the meter amperage, the electric meter voltage, the electricity meter ??,
the overload multiple, which must defer to the electric meter’s (kneading board) data plate value
accurately filling in, otherwise directly will affect the electricity card meter’s measurement
accuracy.
Operation explanation
Increase: Increases one kind of new electric price meter type to the database,
Deletion: Deletes one kind of electric price meter type (if in database has this electric price meter
type quotation, then cannot delete),
Revision: You can revise electric price meter type name,
Cancellation: If find it has revises by mistake, can cancel the hasn’t preserved revision,
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Attention
1. The electric meter type code is cannot duplicate.
2. The increasing or the revision must choose “Save” can be effective
Because the electrovalence unceasing carries on the adjustment, has it provids the
electrovalence type table maintenance function, so that it adapts the electrovalence whole
adjustment.
Like chart 3.3 show:
Attention
1: The electrovalence type code cannot duplicate;
2: The increasing or the revision must choose “Save” can be effective,
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
You can click on the menu [setup to maintain -> personnel electrovalence setup] to enter the line
area setup.
Like chart 3.4 shows
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Setup explanation
1: The line area code corresponds to the power supply department's transformer area code, also
may correspond to the estate management department's building number code. The system
carries on according to the line area code to analyze statistics the using electricity situation. The
system selects in the comparative table method connections the database of other table, after
revised the line area code comparative table, the system automatically completes the
corresponding maintenance.
2: After has defined the line area code, when opens a bank account of a new table, it must defer
to various users’ meter line area accurately to fill in the region code, otherwise will directly affect
the system analysis statistics accuracy.
3: When opening a bank account if has input the region code which does not exist, the system
can automatically increase it to the comparative table.
Operation explanation
Increase: Increases a new line area to code the database,
Deletion: Deletes a area code (if in database has this area encoded quotation, then cannot
delete),
Revision: May revise the line area’s code, name,
Cancellation: If finds it has revised by mistake, can cancel the hasn’t preserved revision,
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Attention
1: The line area code cannot duplicate.
2: After the increase or the revision must “Save”, then it can be effective.
System account opening, electricity sells service, the user situation inquiry, the user
information change, limits allows the electrovalence adjustment, account canceling
registration, business management report.
After selecting menu or clicking the Daily Business/System Account Opening Bottom which is on
left side of the screen on the second row of tool strip, the system account opening window will
appear on screen. Entire system account opening flows are all in turn to be completed in this
screen.
After inputs all data to be unmistakable, clicks on [preservation], reads in the data the electricity
card, this card for buys the electricity card, the user later will depend on this card to carry on buys
the electricity.
Screen form like chart 4.1 shows: The demonstration treats matches in the user information and
the table storehouse the table information. Electric instrument type, limits allows data and so on
way, electrovalence type, region code to tabulate the way to choose for you.
The table storehouse browsing page demonstration waits for matches the table the detailed
information
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Operation Direction
First we must choose this group of users to match the table to suppose the definite value:
1).Meter’s type: After chooses some model, the system will show the main parameter of this type
of meter automatically(meter’s constant, meter’s phase, meter’s amperage), they must be
checked earnestly.
2).The way of limiting the accommodate: unlimited or power off;
3).Price’s type: we choose that according to the price which are corresponding to the consumer’s
character that how to use;
4)Area code: The power supply area code is base on the area which is corresponds on the
consumer’s address where the meter is installed;
5). When the consumers install the meters in batches, or when all of the parameters are the
same, which is including of the meter’s type and region, price and so on, we may designate the
check box that “the setup doesn’t change in this batch”. The careful consumers can discover that
after doing it, the following content is not must to be chosen.
Reminder
After only made [ preservation ] this consumer’s data according to the meter can enter the
database, it can be restarted and changed before the preservation.
The choice of the “Household serial number” must be corresponding to the mark on the
nameplate of the meter; otherwise, the card can not be read.
Explanation
1: Where the consumer open an account, where they can buy the electricity, the card bought
anywhere else will not work!
2: The consumer are requested to insert the card one more time before buying the electricity in
the next time, such the situation about the consumer can be get.
3: The explain about opening an account: Something should be attention about how to open an
account will be displayed.
The electric quantity when an account be opened, the electric quantity be written into:
The electric quantity be written into when the account be opened=(the electric quantity be
bought)/the multiple rate of the meter
For example: the electric quantity be bought =2000, the multiple rate of the meter =40, electric
quantity written to the card =2000/40=50;
Attention
1st, regarding meter based on the int'l standard GB/T18460: The pre-placed electric quantity will
be taken out automatically when the consumer’s card be inserted. we request that the electric
quantity be bought when the account be opened>= pre-placed electric quantity.
2nd, regarding non- GB code GB/T18460 meter: the electric quantities which is 12 degree been
pre-installed when it be established also must be taken out directly when the account be opened.
And the electricity quantity be written >= 12, therefore the electric quantity be bought when the
account be opened >= 24 * meter’s percentages.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
With an account, user will have a card accordingly. User can claim and buy electricity only to
have to bring this to sales department.
Select the menu or click the daily business/sales service button on second row of tool strip on left
side of the screen to enter operation window. The entire electricity sales service flow are all in
turn to complete in this screen.
Screen form like chart 4.2 show: May complete reads the card, the consult buys the electricity
card data, the error processing, the consult buys the electricity historic record, sells the electricity,
the printing receipt, makes up the card, the consult file data and so on a series of operations.
With an account, user will have a card accordingly. User can claim and buy electricity only to
have to bring this to sales department.
Select the menu or click the daily business/sales service button on second row of tool strip
on left side of the screen to enter operation window. The entire electricity sales service flow
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
are all in turn to complete in this screen.
Screen form like chart 4.2 show: May complete reads the card, the consult buys the
electricity card data, the error processing, the consult buys the electricity historic record, sells
the electricity, the printing receipt, makes up the card, the consult file data and so on a series
of operations.
The request user in buys in front of the electricity buys the electricity card to insert in the
electric instrument a time, reads in the user to use electricity the situation.
After enters [ user to buy electricity ] to operate the function window, buys read-write the
electricity card insertion electron card, the choice [ reads buys electricity card ] the item to
read in on time buys the electricity information and looks up the electricity information.
The system after reads takes buys in the electricity card the information, automatically the
information which records with the microcomputer database in carries on the comparison, if
in the card records in the information and the system database records the information
tallies, then may input newly buys the electricity data, then clicks on [ preservation to write
card ] to read in the data.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
If the information between the reading in and in the database records are not symbol, system
prompts warning. You may choose the [electricity card data] option to inspect the user’s
information of using electricity, if it belongs to abnormal seriously, then the system will force
to withdraw from function of buying the electric energy, you should promptly make the
corresponding processing solution according to the situation.
When the instance which user returns don’t agree with the database, the system can
transmit the notice automatically to inquiring electricity department, requested further
examining.
Operation explaining
1. After inserting the user buying the electricity card, single-click [read buying electricity card]
button,
2. The system checks the returning data and using electricity instance, only correct then
allows to buying the electricity.
3. Input this time the user request to buy the electric quantity,
4. After inputting completely, single-click [preservation to write card] button, after writing the
card to print the receipt to complete the operation,
5. Give the receipt to the user. After charging at the charge window, give this electricity card
which produces this time to the user.
Attention: After only made [preservation to write card], this user to buy the electricity data
only then to enter the database, you can change before the preservation.
the read-card electric quantity when buying electricity
The read-card electric quantity when buying electricity = (the quantity of buying electric
quantity + the electric quantity of backing up)/the electric meter percentage
For example: the quantity of buying electric quantity =300, the electric quantity of backing up
=-10, the electric meter percentage=1, The read-card electric quantity =300+ (-10) /1=290;
Attention
The not international GB/T18460 electricity card table: requests The read-card electric
quantity >= 12.
Explanation
Processing the wrong of buying electricity inspection
1. When finding the buying electricity card data error, you must inquire the user and record
the situation, and request the examine,
2. When finding it has overdrew the electricity and permission buys the electricity, you must
inquire the meter whether or not be damaged?
3. There is no return data after making up the card, you must let the user confirm the original
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
card electric quantity has sent in meter, only then it is possible to permit buys the electricity,
4. When prompting the surplus electric quantity are too much, it can suitably limit according
to the special details, avoids the user storing up the electric quantity.
Some temporary users (such as universities, colleges and institutes student using electricity in
dormitory) occur frequently to stop meter and to draw back cost, renew the use.
Before haven’t transact the procedure of drawing back and making up spends, you can
repeatedly carry on reporting stop, the restoration, certainly it does not affect the electric meter
data.
Attention: Buy the electricity card have to buy the electricity card which corresponds with the
electric meter.
1. The meter operation when reporting stop:
freezes the data after the display E=20 vanished, inserts the buying electricity card again will not
influence the data.
Attention: If the card data has not been stop and froze, then you cannot draw back the
expense.
Attention: the buying electric quantity when makes up > the electricity quantity of making up.
In the daily business the electric meter data management mainly completes joining the electric
meter to database, renewing the electric meter, deleting the electric meter of stopping use and
so on.
Here introduces the operating procedure of the electric meter management, including:
Constructing the files when the new meter goes into database, electric meter replacement
processing.
The registration of the electric meter going into database: sets up the files of the electric meter
going into database after examination qualified in advance. When opens a bank account for
buying meters also to be able simultaneously to carry on the electric meter to the registration of
the electric meter going into database. Before using any meter paying in advance all must pass
through [the registration of the electric meter going into database] to set up the files. You can
determine each electric meter’s parameter through this function.
1. After entering the [the registration of the electric meter going into database] function window,
first chooses the way of going into database:
If it is a new meter: chooses the “the registration of the electric meter going into database” option,
If it is an old meter going into the database again: chooses “renews the stopping meter” option.
2. Choosing the corresponding electric meter type from the “the registration of the electric meter
going into database” option’s next pulling tabulates.
Prompt: If it has not the meter you need in the next pulling tabulates, you can click on “append
meter type”.
Screen form like chart 4.3 shows:
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Noun explanation
Start point of electric instruments
The number of degree before the meter put into use.
1. No degree readings of meter with the LCD liquid crystal table at startup stage. Startup point =0.
2. For the “double reading meter” with mechanical degree counter, the degree reading will not
always be zero. However, the mechanical degree counter will be zero after adjustment. Thus
cause the different startup reading. Therefore, the meter startup reading must be record when
put into use.
Electricity Pre-setting
Electricity Pre-setting:It is set for electrify verification, and it will be deducted at next electricity
buy.
1) For JB/T8382 standard meter: prepare a “set card” for every card-meter, and pre-set 12
degree electricity reading.
2) For GB/T18460 standard meter: Use the common “pre-setting card” to pre-set a certain
degree.
Operation Direction
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
1. Select this batch goes into storage the meter type, confirmed the parameter is consistent with
the meter data plate on.
2. Clicks [Add new table] button, the cursor pauses in the input meter number (The serial number
on meter data plate);
3. Input the startup reading (the entire value on the meter counter), if no reading, please inputs 0;
4. If device number is 18460, then no need to record on setting card and click the [data save]
button;
If device number is 8382, then lick [record and storage] button to save the data, insert the IC card
to generate the setting card. Pull out the IC card and insert it into the card meter with power to
complete the parameter setting and password transmission.
5. Continue to go into storage or close.
After processes the regular inspection to uninstall or to trade the table overhaul to be qualified
must be restored into files. At this moment only reset the meter status from stop to await
assignment.
Select management method as “Meter Restoration”, the screen form like chart 4.4 show:
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Operation Direction
1. The cursor pauses in the meter recording which must restore;
2. Clicks [restores and await assign] button, the data goes into storage.
Notes: If get a wrong setting card or forget to set, can use the [compensate setting card] to do
another setting card.
Operation Direction
1. The cursor pauses in the meter records which must be deleted;
2. Click the [delete] button.
Any replacement because of company confirmed replace, damage, breakdown and other
reasons.
The meter replacement record is used to record the old and new meter replace and establish
new profile to get right the electricity sell.
choose menu [ meter management – meter replacement processing ], enters the meter
replacement processing registration screen.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
the system can record your revision operation when the revision?the deletion to the data,
records to the [ revises diary data sheet ].
It can consult registers sheet and the revision data sheet, then it can inspect whether operating
exceptionally or not.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Operation method
1. first choose "the customer data changes" type that to modify ;
2. decide the users that to modify, strike the [ beginning] button;
3. to modify the item change into a edit one, and to proceed the modification according to request
at this time;
4. If amend correctly, clink [preservation] on the up tool bar, save all user’s amended result;
5. Before preservation, clink[cancellation]to cancel the just amended operation.
6. After revises all users ,clicks on [ conclusion ], only then it can preservate this batch of revision
result.
7. Clicked on before the conclusion, clicks on [ cancellation ] button the revision will become
completely invalid.
It can change the appointed user electrovalence to another kind of electrovalence, for example
some inhabitant-lighting-electricity household can change into the trade - use electricity
household. After the adjustment the system will count the cost according to the new
electrovalence if you buy electricity.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Choose operating mode “Price type adjustment”.
? Power supply region adjustment
It can adjust the power supply region of the assigned user .After the adjustment will do the
statistics according to the new power supply region.
Choose the operating mode as “Electricity region adjustment”.
It can cancel the user, the user which cancels cannot continue to purchase the electricity. But
certainly has not been deleted, It can be restored. The user which cancels also can be putted in
the formation which can be deleted, when necessity It can be thoroughly deleted. When deletion
it will delete the user's file, the purchasing electricity record, the charge record completely.
" the household cancellation to restore processing" can carry on two kind of bidirectional
operations -" the household cancellation " and "the restoration".
the operation of the household cancellation is change "the user condition” into the cancelled
users in the matching record table storehouse . After cancellation the user isn’t able to buy the
electricity, but still retained the user’s file information and the historic record of purchased
electricity complete.
operating procedure
1. inputs the localization that the user record will be restored in the fast search .
2. after confirmation, single-clicks the button [ restores confirmation ], restores completely.
attention: The permanent deletion can not restore please uses it prudently.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
4.4.3 Analysis of overtime users (blacklist)
" Analysis and manage to users" window supplies the functions of inquiry and analysis of
overtime electricity users and searching for suspicious users. It also can inquire the information
and arrange it in an order, type and export the information.
It bases on the database technology of data’s echoplex. So we can check the electricity
consumption purposely, instead of checking it in a large area blindly in the past.
While analyzing and calculating user's electricity consumption, it also checks the rationality of the
electricity-using situation; after calculates user’s monthly electricity consumption, it go on
analyzing the consumption’s alteration. The result will be vividly showed using data list and many
kinds of figures.
The analysis helps us understand the variation tendency of the electricity consumption every
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
month this year and compare the electricity consumption with last year’s in the same period. The
result will also be vividly showed using data list and many kinds of figures:
The check can be processed according to different areas and different months, It is convenient to
export all kinds of report forms and it ensure that we can find user's unusual electricity-using
situation and can do relevant check in time.
In " Area’s contrast and analysis of electricity sale", it analyze and compare the area’s electricity
sales amount and sales number in an unit time; It also compares every area’s electricity sales
amount and sales number with last year’s. So we can pick up the unusual situation from the
analysis. The main window is showed in The chart 4.9.
We can switch between electricity sales amount and sales number by clicking the button:
[Electricity sales amount/number switch]. " Amount " is the analysis of electricity sales amount,
while " Number " is the analysis of electricity sales number. It regards " year" as the analytical
unit when the [Total] button is pushed, when the button is floating, it regards" month" as the
analytical unit
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
In " Each Area’s contrast and analysis", the block diagram shows the distribution of electricity
sales amount and sales number per unit time in different areas. The abscissa shows areas’ serial
numbers and the ordinate shows the electricity sales amount or sales number per unit time; The
figure of " Numerical value", contrasting with" Distribution map" of above, shows the concrete
data of electricity sales amount/sales number in the appointed area. The figure of " Percentage"
shows the percentage of each area’s electricity sales amount / sales number in all of the
electricity sales amounts / sales numbers per unit time.
If you want to compare the specific area’s electricity sales situation by years, you can click the
label page of" contrast and analysis with last year ". The default page shows the contrastive
analysis of the first area’s business situation. You can choose the number of the area you want
to analyze by clicking different buttons. Those Buttons are " The first district", " The upper district",
" The lower districts" and" The end district" etc. The " Annual distribution chart" embodies the
electricity sales situation in the appointed area, including every month and the same period last
year. The abscissa shows the month and the ordinate shows the electricity sales amount or
sales number. The figure shows the electricity sales situation of the current year.
User's file information is in the first half of this page. The other half shows the list of user’s
purchases of electricity in detail. Once clicking to choose user’s record in the file list, the list will
show the detailed information of user’s purchases of electricity immediately. You can also
choose users’ records by clicking: " To the first", " Forward", " Backward", " To the end"
In this window, you can type and export the data you have inquired about.
" Analysis of electricity sale every month" regards a month as the unit. It analyzes the information
of electricity sale every business day in this month. " Analysis of users’ number" is the analysis of
the electricity sale number every business day. It is more intuitionistic and exact for you to
analyze using histograms and data mark. " Consult the detailed data " uses lists to list detailed
data of the total quantity of electricity sale, electricity sale number, the average quantity of
electricity sale and the total sum of electricity consumption etc. There is the window followed:
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
You must fill the choice menus: " Month" and" Year" with year and month you want to inquire.
You also can click buttons of " Last year"," Last month", " Next month", and " Next year" to
change the " Month" and" Year". The result will be typed and exported in form of report list when
clicks the " type" button.
The histogram of electricity sales amount will be showed when you click the label page of "
Analysis of electricity sales amount ". The abscissa shows the time and the ordinate shows the
electricity sales amount.
Equally, when you click the label page of " Analysis of user's number". It will show the distribution
chart of electricity sales number this month. The abscissa shows the time and the ordinate
shows the business number.
Special cards include: Check card, Test card, Reset card, Meter copy card, Manage card and
Preset card.
The cards don’t need to input data into except for “Reset card”. Having chosen the type you want
to make, please click [Write electricity card].
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
You can read the card to check back it after writing the card.
We use check card for checking meters and returning the data of meters. You can use the card
as long as the meter works normally.
When using the check card, we insert the card to the meter. The data of this meter’s work status
will be written into the check card. This meter also can show part of the data at the same time.
Then we use the function of [Read the data of electric card] to read the data in the check card
and write it into the checking database. Thus we can inquire and analyze the data.
Notice: It can check the working performance of the relay to insert the electric card twice within
10 seconds and check the relay at the same time. If you hear the sound of " Ka-Ta", it shows that
the relay can connect and cut normally. The meter’s setup data is also showed on the meter.
Test card can test the load power of the meter and the descending of the residuary quantity
of electricity.
The manufacturer and the department of meters’ supervision use the card for testing the
meter’s performance and rechecking the meter. It is also used in the technical aging program
to checking and assessing the meter quickly.
It tests the load power of the meter to insert the card once: Showing real time power
“XXXXX.XXX kW”
It tests the descending of the residuary quantity of electricity to insert the card twice within 10
seconds: showing the residuary quantity of electricity“9999.DD.PP kWh”;DD=0.01kWh,
PP=Sum of pulses.
The test will exit when inserts check card or the purchase card.
Reset card is used for resetting the data after the production and testing.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Every new meter must be reset before leaving factory or entering storage. After resetting, the
meter shows “E=00” and the inner relay is cut.
The use of manage card: It is used for stopwatch and reuse of user’s meter in the precinct.
Power cut and return the balance of electricity: You must insert the manage card to stop the
meter and cut off the power within 10 seconds after inserting the electricity-purchasing card.
Then wait for the meter being stop as the display: “E =20” disappears to insert
electricity-purchasing card again to return the data. (Notice: Users electricity purchase cards
must be callback to return the data. So users can have the balance paid back.)
Reuse of electricity: If you want to reuse the electricity, please insert the electricity-purchasing
card into the meter within 10 seconds after inserting the manage card. (Notice: If you have
balanced the fare, please transact the procedure before reuse, then you will get the
electricity-purchasing card again.)
The use of preset card: presetting limit to the electricity tick (or the consultative quantity of
electricity) when installing the meter. So the user can use the electricity until the limited electricity
tick was run out
Data copy card is used for making a copy of the meter’s data. One card can copy 169 pieces of
data at most. The data copied at last will cover the 169th while the number exceeding 169.
Notice: Data copy card is a special card of large capacity. It is different from other cards so you
should order it from the manufactory additionally.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
User’s electricity-purchasing card: this card is a special card for user to buy electricity. The card
and the meter are one-to-one.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Making up the buying-electricity card for users: to carry on the operation of making up the card
for users who lose the buying-electricity card. The design of the system and the electric
instrument has guaranteed the safety of the buying-electricity card which is make up. After such
a new card be make up, the original card can’t be able to use even if the user found it, See
appendix 2.
Operating procedure
Select the orientation to the record of the users who need to make up the card. Single click the
“make up card” button to carry on the operation of making up the card after the inspection is
unmistakable.
Attention
Only can it make up the user’s last or preceding buying-electricity card. And it can also make up
for printing the buying-electricity receipt of the last time.
Regarding GB/T18460 GB code’s table which doesn’t have the establishment card, it adopts “the
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
initialization card” to carrying on the initialization generally.
Regarding JB/T8382 sign electric instrument, establishment card: use in to set the basic
parameter of the electric instrument. One card corresponds one table.
When gone into storage, each electric instrument must use the establishment card to carry on
the establishment before it can be able to put into use.
Here it provides making up the establishment card, which is used as remedial treatment for
reproduce the establishment card.
Inset IC card into the read-write instrument, then enter the “makes up the establishment card of
the system electric instrument” window, select the electric instrument factory that need to make
up the system establishment card according to the leaving-plant serial number on the data plate
of the electric instrument. After inspecting all parameters to be unmistakable on this table, single
click the “system card” button, then complete the operation of making up the establishment card.
Attention
Only for the electric instrument which goes into storage to make up the establishment card.
5.5 The usage of the electric instrument and the demonstration of the electricity
2. The demonstration of the total buying-electricity quantity: Demonstrate prompt symbol = “The
total buying-electricity quantity”.
3. The demonstration of the buying-electricity times: Demonstrate prompt symbol = “The times”
(the buying-electricity times that allowed to accept at the next time).
4. The demonstration of the alarm electric quantity: Demonstrate prompt symbol = “The alarm
electric quantity”.
5. The demonstration of the credit limited quantity: Demonstrate prompt symbol = “The limited
electric quantity”.
6. The demonstration of the buying-electricity condition and the tolerance power: Demonstrate
prompt symbol = “FOX=XX.XX kW” (XX.XX =00.00kW expressed no tolerance).
5.5.5 Item one: the demonstration when inserting the checking-electricity card
1. The demonstration of the electric instrument’s serial number: Demonstrate prompt symbol =
“The serial number of the instrument” (8 figures).
4. The demonstration of the total buying-electricity quantity: Demonstrate prompt symbol = “The
total buying-electricity quantity”.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
5. The demonstration of the buying-electricity times: Demonstrate prompt symbol = “The times”.
6. The demonstration of the buying-electricity condition and the tolerance power: Demonstrate
prompt symbol = “FOX=XX.XX kW” (XX.XX =00.00kW expressed no tolerance).
7. The demonstrated condition of the electric instrument: Demonstrate prompt symbol = “E=XX”.
5.5.6 Item two: the two continuous insertion of the checking-electricity card to examine the failure
function of the relays and the demonstration
1. The demonstration of the leaving-plant serial number: Demonstrate prompt symbol = “serial
number” the low 8 figures of the leaving-plant serial number (interior are 10 figures).
3. The demonstration of the alarm electric quantity: Demonstrate prompt symbol = “The alarm
electric quantity”.
4. The demonstration of the credit limited quantity: Demonstrate prompt symbol = “The limited
electric quantity”.
5. The demonstration of the limited surplus electric quantity: Demonstrate prompt symbol = “The
limited surplus electric quantity”.
6. The demonstration of the running time: Demonstrate the form = “XXXXXX.XX h” (the total
running time of the electric instrument which hour is as a unit of).
7. The demonstration of the edition model: For example demonstrated that, “5943.127C”
“030810C1”.
1. Test the load power of the electric instrument: Electric instrument Demonstrate current power
XXX.XXX kW.
2. When it hasn’t quit the power test, insert the testing card again to test the progressive
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
decrease of the surplus electricity quantity.
3. Quit the test, and demonstrate the condition when other types of IC cards are inserted.
Database compression: Carries on the database compression once to reorganize, eliminates the
residual data fragment in the database, release the floppy disk space which takes up.
Simultaneously completes the wrong repair in the database structure.
After restores the data or finish inducting the data, please click the button [ pack compression ].
It also should regularly carry on the database compression in daily data maintenance.
The backup document deposit tacitly in the system install content, if the local area network of
power supply department apply, deposits in the install content (..\DATA\BAK\)that register as
“Service computer mainframe”,the system was allowed to preserve the recent 5 backups data.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
operating procedure
1. choose the backups document: Clicks on [browse …], elects from which backup document to
carry on the restoration.
2. Make certain of the path in which the DBMIS6 is conserved. If you want to restore the
database, please do it on the “host-serving computer” in on-line sharing system.
3. Make sure that you have made the right choice, then click the [ Start to restore ], the system
will start to restore the database.
4. In the process of database restoring, the corresponding information of data which is
transmitted from backup file will be displayed on the screen.
Illuminate
1. If the record number is equal to zero, it shows that there is no file has been appended after last
backup.
2. Pack and compression: When the database restoring is finished, click the [Pack and
Compression] to compress and clean the database by which we can clean away the fragment
and release the occupied room.
3. Button of “Data browse” could facilitate the data checking and searchning before or after the
restoring.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
Notice
After the restoring, there may be some hints of unparallel right-confining setup. You can reenter
the system after shut down.
You should be cautious to use this function. Generally speaking, when there are some serious
errors occurring in database, we should set up a new database and restore the data from the
backup database. In this way, the system can come into regular running.
a) The following edition users can upgrade the system to DBMIS6(Meter Administration System)
1. DBMIS Ver 5.15 database file name: DBMIS.MDB
2. YCMIS2000 Ver 5.1X database file name: YCMIS.MDB(support JB/T8382)
3. YCMISC Ver 5.1X database file name: YCMISC.MDB(support GB/T18460?JB/T8382)
b) Way of upgrading: After installing the DBMIS6,( the old edition won’t be destroyed because
the former installed catalogue won’t be overlaid ), start the DBMIS6 and perform the systematic
integrative module:[Setup and Maintenance] and [Systematic Register Setup]. In the section of
[Database Setup], you can click the [Upgrade] and choose the name of old edition to convert it to
DBMIS6.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
1. Upgrading should be done at once after the operations of systematic installation, system
registration and database initialization.
2. After upgrading, you should firstly check and modify the setup of systematic collating form.
Only manager has the jurisdiction of upgrading.
Illuminate
1. Pack and compression: When the database restoring is finished, click the [Pack and
Compression] to compress and clean the database by which we can clean away the fragment
and release the occupied room.
2. Button of “Data browse” could facilitate the data checking and searchning before or after the
restoring.
Notice
You must quit and reenter the system after upgrading of the database.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
6.6 Modification of Database
Be cautious to use this function. Before perform the operation of modification, you should make
certain of the record scope and field which are going to be modified.
After click the [Database Update], there will present a window of “Data Modify” just as show in
chart 6.4.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
5. After the modification, click the “Save” to submit the modified result.
6. Modification completed.
Hint
You can right click the record, there will also present a shortcut menu for modification.
Illumination of deletion
Double click the record in “Data Modification” window, then you could modify the record in details
and could also delete the records. Show in The chart 6.5
This system has the function of form printing and there are several steps related to it. They are
fields selecting, previewing, printer setting and so on.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
The fields in form are not fixed, they can be selected from the forms to print according to your
need. A dialog box of “Outputting Fields Selecting” is showed in chart 7.3.
All fields in the form are enumerated in this dialog box, and you can select fields you want to print.
(“v”denotes selecting)
If the col width of the form you want to print is inappropriate or the font is too small, you could
cancel printing and reselect the fields or reduce the amount of fields to get proper size.
After fields selecting, you can preview the form to check up whether the size or format is
appropriate through the imitating preview function.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573
WENZHOU GAIA ELECTRICAL CO., LTD
www.gaiaele.com
Prepaid Meter Software User Manual
There are several terms in this window. They are “Display Proportion”, “Print and Printing Setup”,
“Sheet and Page layout Setup”, “Page Up”, “Page down” etc.
“Display Proportion” lists out various proportional values: 200%, 150%, 100%, 75%, 50%, 25%,
10% and col width, whole page, double page etc. Click it to select.
If there are several pages to print, you can click [Turning] use scroll bar to browse
In this dialog box, you can get the printer setup including setting the amount of sheet and scope
and so on.
Click [Property] to set the size of sheet, sheet delivering way and printing mode.
Email: mrpaopaocn@yahoo.com
Skype:energykelly
Mobile:+86 13968710573