PT PLN (PERSERO) Doc. No. …..

/UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

1. PROTEKSI PENGHANTAR BAY KEBASEN 1-2


JENIS RELAI : LINE CURRENT DIFFERENTIAL (LCD)
MERK / TIPE : ABB / RED-670
LOKASI : GI 150 KV KEBASEN II
PROTEKSI : BAY KEBASEN 1-2
L1, L2 :7 , 14.25 km
L3, L4 : 19.996 , 44.29 km
Z1 : 0.072 +j 0.293 Ω/km
Z0 : 0.88 +j 0.222 Ω/km
CT : 2000 / 1 Ampere
PT : 150 kV / 100 Volt
SCHEME : POTT
NO PARAMETER SETTING UNIT KETERANGAN
HW CONFIGURATION – BIM_X (BINARY INPUT)
1 Operation On
2 DebounceTime 0.001 s
3 OscBlock 40 Hz
4 OscRelease 30 Hz
HW CONFIGURATION – BOM_X (BINARY OUTPUT)
1 Operation On
HW CONFIGURATION – LDCM_302 (LINE DIFFERENTIAL COMMUNICATION MODULE)
1 ChannelMode Normal
2 TerminalNo *) Field Set TerminalNo harus sama dengan
RemoteTermNo GI/GITET Lawan
3 RemoteTermNo *) Field Set RemoteTermNo harus sama dengan
TerminalNo GI/GITET Lawan
4 DiffSync Echo
5 GPSSyncErr Echo
6 CommSync *) Field Set
7 OptoPower LowPower
8 TransmCurr CT-GRP1
9 ComFailAlrmDel 100 ms
10 ComFailResDel 50 ms
11 RedChSwTime 5 ms
12 RedChRturnTime 100 ms
13 AsymDelay 0.00 ms
14 AnalogLatency 2
15 RemAinLatency 2
16 MaxTransmDelay 20 ms
17 CompRange 0-25kA
18 MaxtDiffLevel 600 µs
19 DeadbandtDiff 300 µs
20 InvertPolX21 Off

Page. 1 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

HW CONFIGURATION - TRM_40
1 NAMECH *) Field Set
2 RatedTrans 1.0 A
3 CTStarPoint ToObject
4 CTsec 1.0 A
5 CTprim 2000 A
6 NAMECH *) Field Set
7 RatedTrans 1.0 A
8 CTStarPoint ToObject
9 CTsec 1.0 A
10 CTprim 2000 A
11 NAMECH *) Field Set
12 RatedTrans 1.0 A
13 CTStarPoint ToObject
14 CTsec 1.0 A
15 CTprim 2000 A
16 NAMECH *) Field Set
17 RatedTrans 110.0 V
18 VTsec 100.0 V
19 VTprim 150.0 kV
20 NAMECH *) Field Set
21 RatedTrans 110.0 V
22 VTsec 100.0 V
23 VTprim 150.0 kV
24 NAMECH *) Field Set
25 RatedTrans 110.0 V
26 VTsec 100.0 V
27 VTprim 150.0 kV
POWER SYSTEM - PRIMVAL : 1 (PRIMARY VALUES)
1 FrequencySel 50 Hz
2 PhaseRotation Normal=L1L2L3
POWER SYSTEM - GBASVAL : 1 (GLOBAL BASE VALUES)
1 Ubase 150.0 kV
2 Ibase 1285 A
3 Sbase 192.75 MVA
MONITORING - DRPRDRE : 1 (DISTURBANCE REPORT / DFR)
1 Operation On
2 PreFaultRecT 0.50 s
3 PostFaultRecT 4.50 s
4 TimeLimit 5.00 s
5 PostRetrig Off
6 MaxNoStoreRec 100
7 ZeroAngleRef 1 Ch
8 SetInfoInDRep Enable

Page. 2 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

9 OpModeTest Off
APPLICATION CONFIGURATION – LINEDIFF - L3CPDIF (LINE CURRENT DIFFERENTIAL)
1 Operation On
2 IdMin 0.20 Ibase
3 EndSection1 1.00 Ibase
4 EndSection2 4.00 Ibase
5 SlopeSection2 30.0 %
6 SlopeSection3 80.0 %
7 IdMinHigh 1.00 Ibase
8 tIdMinHigh 0.000 s
9 IdUnre 8.80 Ibase
10 NegSeqDiffEn On
11 NegSeqROA 60.0 Deg
12 IMinNegSeq 0.04 Ibase
13 CrossBlockEn Yes
14 I2/I1 Ratio 15.0 %
15 I5/I1 Ratio 30.0 %
16 ChargeCurEnable On
17 AddDelay Off
18 IdiffAlarm 0.15 Ibase
19 tAlarmdelay 10.000 s
20 Open CTEnabled Off
APPLICATION CONFIGURATION – DIST – ZCVPSOF : 1 (SOTF)
1 Operation On
2 AutoInitMode DLD disabled
3 Mode Impedance
4 tSOTF 1.000 s
5 tOperate 0.03 s
APPLICATION CONFIGURATION – DIST – ZMQPDIS : 1 (ZONE 1 DISTANCE IN PRIMARY
OHMS)
1 Operation On
2 OperationDir Forward
3 X1 1.642 Ohm
4 R1 0.403 Ohm
5 X0 4.927 Ohm
6 R0 1.243 Ohm
7 RFPP 3.449 Ohm/loop
8 RFPE 22.179 Ohm/loop
9 OperationPP On
10 OpModetPP On
11 tPP 0.000 s
12 OperationPE On
13 OpModetPE On
14 tPE 0.000 s

Page. 3 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

15 IMinOpPP 15 % Ibase
16 IMinOpPE 15 % Ibase
17 IMinOpIN 10 % Ibase
APPLICATION CONFIGURATION – DIST – ZMQAPDIS : 2 (ZONE 2 DISTANCE IN PRIMARY
OHMS)
1 Operation On
2 OperationDir Forward
3 X1 4.187 Ohm
4 R1 0.749 Ohm
5 X0 12.561 Ohm
6 R0 2.957 Ohm
7 RFPP 8.793 Ohm/loop
8 RFPE 27.724 Ohm/loop
9 OperationPP On
10 OpModetPP On
11 tPP 0.400 s
12 OperationPE On
13 OpModetPE On
14 tPE 0.400 s
15 IMinOpPP 15 % Ibase
16 IMinOpPE 15 % Ibase
APPLICATION CONFIGURATION – DIST – ZMQAPDIS : 3 (ZONE 3 DISTANCE IN PRIMARY
OHMS)
1 Operation On
2 OperationDir Forward
3 X1 13.045 Ohm
4 R1 3.018 Ohm
5 X0 33.343 Ohm
6 R0 1.243 Ohm
7 RFPP 27.394 Ohm/loop
8 RFPE 34.655 Ohm/loop
9 OperationPP On
10 OpModetPP On
11 tPP 1.600 s
12 OperationPE On
13 OpModetPE On
14 tPE 1.600 s
15 IMinOpPP 15 % Ibase
16 IMinOpPE 15 % Ibase
APPLICATION CONFIGURATION – DIST – ZDRDIR : 1 (DIRECTIONAL DISTANCE)
1 IMinOpPP 10 % Ibase
2 IMinOpPE 5 % Ibase
3 ArgNegRes 115 Deg
4 ArgDir 15 Deg

Page. 4 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

APPLICATION CONFIGURATION – DIST – FDPSPDIS : 1 (PHASE SELECTION & LOAD


ENCHROCHMENT)
1 OperationZ< On
2 OperationI> On
3 INBlockPP 40 % IPh
4 INReleasePE 20 % IPh
5 RLdFw 69.309 Ohm/p
6 RLdRv 69.309 Ohm/p
7 ArgLd 36.87 Deg
8 Iph> 120 % Ibase
9 IN> 20 % Ibase
10 X1 12.392 Ohm/p
11 X0 31.676 Ohm/p
12 RFFwPP 35.428 Ohm/loop
13 RFRvPP 35.428 Ohm/loop
14 RFFwPE 35.428 Ohm/loop
15 RFRvPE 35.428 Ohm/loop
16 TimerPP Off
17 TimerPE Off
18 IMinOpPP 10 % Ibase
19 IMinOpPE 5 % Ibase
APPLICATION CONFIGURATION – DIST – ZMRPSB : 1 (POWER SWING BLOCK)
1 Operation On
2 X1InFw 33.343 Ohm
3 R1Lln 0.503 Ohm
4 R1FlnFw 34.655 Ohm
5 X1lnRv 33.343 Ohm
6 R1FlnRv 34.655 Ohm
7 OperationLdch On
8 RLdOutFw 55.447 Ohm
9 RLdOutRv 55.447 Ohm
10 ArgLd 36.87 Deg
11 kLdRFw 0.80 Mult
12 kLdRRv 0.80 Mult
13 tP1 0.045 s
14 tP2 0.015 s
15 tW 0.250 s
16 tH 0.500 s
17 tEF 2.000 s
18 tR1 0.300 s
19 tR2 2.000 s
20 IminOpPE 20 % Ibase
APPLICATION CONFIGURATION – DIST – FUFSPVC : 1 (VT FAIL / FUSE FAILURE)
1 Operation On

Page. 5 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

2 OpMode UZsIZs
3 3U0> 20 % Ubase
4 3I0< 10 % Ibase
5 3U2> 30 % Ubase
6 3I2< 10 % Ibase
7 Operation DUDI On
8 DU> 20 % Ubase
9 IPH> 10 % Ibase
10 UPH> 70 % Ubase
11 DI< 10 % Ibase
12 SEALIN On
13 USealin 60 % Ubase
14 IDLD 20 % Ibase
15 UDLD 60 % Ubase
APPLICATION CONFIGURATION – DIST – LMBRFLO : 1 (FAULT LOCATOR)
1 R1A 1.421 Ohm/p
2 X1A 5.955 Ohm/p
3 R1B 3.725 Ohm/p
4 X1B 19.861 Ohm/p
5 R1L 0.503 Ohm/p
6 X1L 2.053 Ohm/p
7 R0L 1.553 Ohm/p
8 X0L 6.159 Ohm/p
9 R0M 0.000 Ohm/p
10 X0M 0.000 Ohm/p
11 LineLengthUnit kilometer
12 Line Length 7 km
APPLICATION CONFIGURATION – DIST COM – ZCRWPSCH : 1 (CURRENT REVERSAL
DISTANCE)
1 CurrRev On
2 tPickUpRev 0.020 s
3 tDelayRev 0.100 s
4 WEI Off
APPLICATION CONFIGURATION – DIST COM – ZCPSCH : 1 (SCHEME DISTANCE POTT)
1 Operation On
2 SchemeType Permissive OR
3 tCoord 0.000 s
4 tSendMin 0.000 s
5 Unblock Off
APPLICATION CONFIGURATION – DEF – EF4PTOC : 1 (DEF)
1 SeqTypeUPol Zero seq
2 SeqTypeIPol Zero seq
3 SeqTypeIDir Zero seq
4 Operation On

Page. 6 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

5 EnDir Enable
6 AngleRCA 60 Deg
7 polMethod Voltage
8 UPolMin 7.0 % Ubase
9 IPolMin 10 % Ibase
10 RNPol 5.00 Ohm
11 XNPol 40.00 Ohm
12 IN>Dir 10 % Ibase
13 2ndHarmStab 20 %
14 SOTF Off
STEP 1 (AIDED DEF)
15 DirMode1 Forward
16 Characterist1 IEC Def. Time
17 IN1> 10.00 % Ibase
18 t1 0.020 s
19 IMin1 5 % Ibase
20 IN1Mult 1.0
21 tReset1 0.00 s
22 HarmBlock1 Off
APPLICATION CONFIGURATION – DEF – CVGAPC
1 Operation On
2 CurrentInput *) Field Set
3 VoltageInput -3*ZeroSeq
4 OperHarmRestr Off
5 EnRestrainCurr Off
6 RCADir -75 Deg
7 ROADir 75 Deg
8 LowVolt_VM 0.5 % Ubase
OC1 : OVER CURRENT
9 Operation_OC1 On
10 StartCurr_OC1 10.0 % Ibase
11 CurrMult_OC1 1.0
12 CurveType_OC1 IEC Def. Time
13 tDef_OC1 0.00 s
14 IMin1 10.0 % Ibase
15 tMin_OC1 0.05 s
16 ResCrvType_OC1 Instantaneous
17 tResetDef_OC1 0.00 s
18 DirMode_OC1 Non_directional
19 DirPrinc_OC1 I&U
OV1 : OVER VOLTAGE
20 Operation_OV1 On
21 StartVolt_OV1 5.0 % Ubase
23 CurveType_OV1 Definite time

Page. 7 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

24 ResCrvType_OV1 Instantaneous
25 tDef_OV1 0.00 s
26 tResetDef_OV1 0.00 s
27 tMin_OV1 0.05 s
APPLICATION CONFIGURATION – DEF COM – ECRWPSCH : 1
1 CurrRev On
2 tPickUpRev 0.020 s
3 tDelayRev 0.100 s
4 WEI Off
APPLICATION CONFIGURATION – DEF COM – ECPSCH : 1 (SCHEME AIDED DEF)
1 Operation On
2 SchemeType Permissive OR
3 tCoord 0.000 s
4 tSendMin 0.000 s
5 Unblock Off
APPLICATION CONFIGURATION – CB_TR – SMPPTRC : 1 (TRIPPING LOGIC)
1 Operation On
2 Program 1ph/3ph
3 TripLockout Off
4 AutoLock Off
5 tTripMin 0.150 s
6 tWaitForPHS 0.050 s
7 tEvolvingFault 0.9 s
APPLICATION CONFIGURATION – CB_TR – TMAGAPC : X (TRIPPING MATRIX)
1 Operation On
2 OnDelay 0.000 s
3 OffDelay 0.000 s
4 ModeOutputX Steady

CATATAN:
1. Menambahkan logic ketika LCD aktif dan link komunikasi tidak fail fungsi Zone 1 Distance block,
Aided Distance block dan Aided DEF block, namun ketika LCD block karena fungsi link
komunikasi fail, maka fungsi Zone 1 Distance, Aided Distance dan Aided DEF aktif secara
otomatis.
2. Menambahkan Pada Fault recoder sinyal seperti Tegangan per fasa, Arus Local Per fasa, Arus
Remote Per fasa, Measurement Idiff per fasa, Measurement Restrain/Bias per fasa, Z1 Trip, Z2
trip, Z3 Trip, Aided DEF Trip, Aided DEF trip, Phase A, Phase B, Phase C, Distance Send, Distance
Receive, DEF Send, DEF Receive, SOTF, Trip on Reclose, Sychro check, BO trip perfasa, BO
Trip 3 fasa, BO Initiate CBF, Command Close, BI yang digunakan fungsi proteksi (receive, Status
CB, dll).
3. Setting EFPTOC 1, tidak di assign ke BO Trip, hanya alarm, agar dapat dilakukan pengujian fungsi
dengan injeksi EFPTOC 1 tidak trip.

Page. 8 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

2. PERANGKAT AUTORECLOSER RELAI PENGHANTAR BAY KEBASEN 1-2


JENIS RELAY : LINE CURRENT DIFFERENSIAL (LCD)
MERK / TIPE : ABB / RED-670
LOKASI : BAY KEBASEN 1-2 GI 150 kV KEBASEN II
NO PARAMETER SETTING UNIT KETERANGAN
HW CONFIGURATION - TRM_40
1 NAMECH *) Field Set
2 RatedTrans 1.0 A
3 CTStarPoint ToObject
4 CTsec 1.0 A
5 CTprim 2000 A
6 NAMECH *) Field Set
7 RatedTrans 1.0 A
8 CTStarPoint ToObject
9 CTsec 1.0 A
10 CTprim 2000 A
11 NAMECH *) Field Set
12 RatedTrans 1.0 A
13 CTStarPoint ToObject
14 CTsec 1.0 A
15 CTprim 2000 A
16 NAMECH *) Field Set
17 RatedTrans 110.0 V
18 VTsec 100.0 V
19 VTprim 150.0 kV
20 NAMECH *) Field Set
21 RatedTrans 110.0 V
22 VTsec 100.0 V
23 VTprim 150.0 kV
24 NAMECH *) Field Set
25 RatedTrans 110.0 V
26 VTsec 100.0 V
27 VTprim 150.0 kV
POWER SYSTEM - PRIMVAL : 1 (PRIMARY VALUES)
1 FrequencySel 50 Hz
2 PhaseRotation Normal=L1L2L3
POWER SYSTEM - GBASVAL : 1 (GLOBAL BASE VALUES)
1 Ubase 150.0 kV
2 Ibase 1285 A
3 Sbase 192.75 MVA
MONITORING - DRPRDRE : 1 (DISTURBANCE REPORT / DFR)
1 Operation On
2 PreFaultRecT 0.50 s

Page. 9 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

3 PostFaultRecT 4.50 s
4 TimeLimit 5.00 s
5 PostRetrig Off
6 MaxNoStoreRec 100
7 ZeroAngleRef 1 Ch
8 SetInfoInDRep Enable
9 OpModeTest Off
APPLICATION CONFIGURATION – CB_TR – SMPPTRC : 1 (TRIPPING LOGIC)
1 Operation On
2 Program 1ph/3ph
3 TripLockout Off
4 AutoLock Off
5 tTripMin 0.150 s
6 tWaitForPHS 0.050 s
7 tEvolvingFault 0.9 s
APPLICATION CONFIGURATION – CB_TR – TMAGAPC : X (TRIPPING MATRIX)
1 Operation On
2 OnDelay 0.000 s
3 OffDelay 0.000 s
4 ModeOutputX Steady
APPLICATION CONFIGURATION – CB_AR – SMBRREC : 1 (AUTO RECLOSE INTERNAL)
1 Operation On
2 ExternalCtrl On
3 NoOfShots 1
4 ARMode 1/2/3ph
5 StartByCBOpen On
6 CBAuxContType NormOpen
7 CBReadyType CO
8 T1 1Ph 1.000 s
9 T1 2Ph 3.000 s
10 T1 3Ph 3.000 s
11 T1 3PhHS 3.000 s
12 tReclaim 40.00 s
13 tSync 3.00 s
14 Extended t1 Off
15 tInhibit 5.000 s
16 tTrip 0.200 s
17 CutPulse Off
18 tPulse 0.200 s
19 Follow CB On
20 tCBClosedMin 5.00 s
21 AutoCont Off
22 UnsucClByCbChk NoCBCheck
23 BlockByUnsucCl Off

Page. 10 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

24 tUnsucCl 3.00 s
25 Priority None
26 ZoneSeqCoord Off
APPLICATION CONFIGURATION – CB_AR – SESRSYN : 1 (SYNCHRO CHECK)
1 SelPhaseBus1 *) Field Set
2 SelPhaseBus2 *) Field Set
3 SelPhaseLine1 *) Field Set
4 CBConfig Double bus
5 PhaseShift 0 Deg
SYNCHRO CHECK
6 OperationSC On
7 UHighBusSC 80.0 % Ubase
8 UHighLineSC 80.0 % Ubase
9 UDiffSC 0.10 pu
10 FreqDiffA 0.167 Hz
11 FreqDiffM 0.167 Hz
12 PhaseDiffA 15.0 Deg
13 PhaseDiffM 15.0 Deg
14 tSCA 0.000 s
15 tSCM 0.000 s
ENERGIZING CHECK
16 AutoEnerg Both
17 ManEnerg Both
18 ManEnergDBDL On
19 UHighBusEnerg 80.0 % UBB
20 UHighLineEnerg 80.0 % UBL
21 ULowBusEnerg 40.0 % UBB
22 ULowLineEnerg 40.0 % UBL
23 UMaxEnerg 115.0 % UB
24 tAutoEnerg 0.100 s
25 tManEnrg 0.100 s

CATATAN:
1. Menambahkan Pada Fault recoder sinyal seperti Arus Per fasa, Tegangan Per fasa, Initiate AR,
Sychro check, BO trip perfasa, BO Trip 3 fasa, BO Initiate CBF, Command Close, BI yang
digunakan Status CB, AR Ready, AR Inprogress, dll).
2. Menerapkan Switch AR menggunakan selector switch beberapa posisi (Off, 1-pole, 3-pole, dan
1/3-pole).
3. Pola Autoreclose pada ruas ini adalah sebagai berikut :
 Gangguan 2 fasa inisiasi Autoreclose 3 Fasa
 Gangguan Evolving fault (1 fasa berkembang menjadi 2 fasa dalam masa deadtime SPAR)
inisiasi Autoreclose 3 Fasa.
 Gangguan ketika AR posisi OFF dan gangguan 3 fasa maka tidak inisiasi Autoreclose (trip
3 fasa).

Page. 11 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
PT PLN (PERSERO) Doc. No. …../UITJBT/SET/2023
UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH
Komplek PLN Cigereleng - Bandung Valid. AGUSTUS 2023

DAFTAR SETELAN RELAI PROTEKSI GI 150 kV KEBASEN II

3. PROTEKSI CADANGAN PENGHANTAR BAY KEBASEN 1-2


JENIS RELAY : OVER CURRENT & GROUND FAULT RELAY
MERK / TIPE : ABB / REF 615
LOKASI : BAY KEBASEN 1-2 GI 150 kV KEBASEN II

ROW MENU TEXT APPROVED KETERANGAN


SETTING ANALOG INPUT – HW CONFIGURATION
(URUTAN CHANEL MENGIKUTI KONDISI DI LAPANGAN)
1 ReversePolarity No
2 CTsec 1.0 A
3 CTprim 2000 A
OVER CURRENT PROTECTION
OCR Standar Inverse
1 Is 0.771 A (Sekunder) 1542 A (Primer)
IEC Normal Inverse / Standar
2 Curve
Inverse
3 TMS 0.3
GROUND FAULT PROTECTION
GFR Standar Inverse
1 Is 0.13 A (Sekunder) 257 A (Primer)
IEC Normal Inverse / Standar
2 Curve
Inverse
3 TMS 0.54

CATATAN:
 Menambahkan Pada Fault recoder sinyal seperti OCR Trip, OCR Start per fasa, GFR
Trip, Initiate CBF, BO Initiate CBF dan BO Trip ke PMT.

Page. 12 Daftar Setelan Relay Proteksi DIBUAT: FMN DIPERIKSA: TMY DISAHKAN: EKO
Rev. 00 GI 150 kV KEBASEN II
RUANG LINGKUP SERTIFIKASI ISO 9001:2000
PENGEMBANGAN DAN PEMBINAAN INSTALASI PENYALURAN TENAGA LISTRIK
SISTEM JAWA BALI DI PT PLN (PERSERO) UNIT INDUK TRANSMISI JAWA BAGIAN TENGAH

You might also like