Preliminary Engineering Design of the swimming pool roof structure.
Does not consider the impact on the existing structure and lateral force.
Scope 2
Used to criteria of the Central Accounting Department and
analyze cost estimates based on the guidelines of the
Phitsanulok Provincial Treasury Department.
Page | 4
Methodology
Page | 5
METHODOLOGY
1. Literature review and data collection
3. Preliminary Design
Page | 6
METHODOLOGY
1. Literature review and data collection
3. Preliminary Design
Page | 7
1. Literature review
Application of building information model for improvement of
document storage building Naresuan University
Page | 8
1. Data collection
3. Preliminary Design
Page | 10
2. Site Visit And Analysis
Page | 11
2. Site Visit And Analysis
2.2 Inquire the problems and the design of the roof require
Page | 12
2. Site Visit And Analysis
Alternative design
Page
Page| |1513
2. Site Visit And Analysis
Selected design
Page | 14
METHODOLOGY
1. Literature review and collection data
3. Preliminary Design
Page | 15
3. Preliminary Design
3.1 Design and create drawing
Trussless
Page | 16
3. Preliminary Design
3.1 Design and create drawing
Tension membrane
Page | 17
3. Preliminary Design
3.1 Design and create drawing
Skylight Fiberglass
Page | 18
3. Preliminary Design
3.2 Cost estimate
Page | 19
3. Preliminary Design
3.3 Construction Planning
The construction duration can be calculated using the following equation:
Ref. : Chaipak Manakongsawat. (2018). Estimating Construction Duration by Working Rate According to the Criteria for Calculating
the Standard Construction Price and Contingency Period. Master's Thesis, Graduate School, Naresuan University.
Page | 20
3. Preliminary Design
3.3 Construction Planning
Page | 21
METHODOLOGY
1. Literature review and collection data
3. Preliminary Design
Page | 22
METHODOLOGY
4. Analyze and results
Page | 23
RESULT
Page | 24
Result
Type 1 : Trussless Roof Structure
Results of proposed construction guidelines
Page | 25
Result
Type 3 : Skylight Fiberglass Roof Structure
Results of proposed construction guidelines
Page | 26
Result
Type 1 Trussless Roof Structure
Page | 27
Result
Type 1 Trussless Roof Structure
Bill of quantities : Structure & Roof
Page | 28
Result
Type 1 Trussless Roof Structure
Bill of quantities : Paint work
Page | 29
Result
Type 1 Trussless Roof Structure : Barchart
Page | 30
Result
Trussless Roof Structure :
Division of construction work periods
Page | 31
Result
Type 3 :Skylight fiberglass Roof Structure
Bill of quantities : Survey
Page | 32
Result
Type 3 :Skylight fiberglass Roof Structure
Bill of quantities : Structure & Roof
Page | 33
Result
Type 3 :Skylight fiberglass Roof Structure
Bill of quantities : Paint work
Page | 34
Result
Type 3 : Skylight fiberglass Roof Structure : Barchart
Page | 35
Result
Type 3 Skylight fiberglass Roof Structure :
Division of construction work periods
Page | 36
Conclution
Budget Period
Strengths Weaknesses Obstacle
( Baht ) ( Days )
Difficulty in
No rigid frames or Metal sheets have a higher
bringing various
complex truss heat retention capacity .
Type 1 construction
structure Poor screw installation 10,657,780 49
Trussless materials and
No modifications to may lead to leaks and
machinery into
the original structure . water infiltration.
the area.
Page | 37
Conclution
Budget Period
Strengths Weaknesses Obstacle
( Baht ) ( Days )
Difficulty in
Type3 Receives natural light bringing various
The construction of the
Skylight from outside during construction
structure is relatively 17,511,771 170
Fiberglass daytime. materials and
complex
Lightweight machinery into
the area.