Professional Documents
Culture Documents
Profile - Sri Venkateshwara Fibre Udyog P Ltd.
Profile - Sri Venkateshwara Fibre Udyog P Ltd.
GREENING HIGHWAYS
ABOUT US
Sri Venkateshwara Fibre Udyog
Pvt. Ltd. (SVFUPL), is a Bangalore
based company, with experience
in coir industry of more than three
decades and working with a vision
to provide sustainable solutions
for securing the environment for
future generations.
Pg. 1
OUR PRODUCTS
GEOGREEN BLANKET
A unique bioengineered geo-composite made from non-woven natural
fibres and woven synthetic lattice encompassing all functions of
geotextile to meet the challenges of surface soil erosion.
ADVANTAGES OF
GEOGREEN BLANKET :
Arrests immediate
migration of soil
SVFUPL Protective shield preventing
action of rain beat and
reducing surface run off
Favors development of
dense vegetation
Higher tensile strength
Performs well on steep
slopes of 60
Takes the contour of the
slope
Self-repairing and self-
maintaining
Easy installation
SVFUPL
30 Million + Sqmt
of GECB
Installed till date.
Pg. 2
TECHNICAL DATA
Pg. 3
GEOGREEN BLANKET V/S STONE PITCHING
Made from coconut fibre which is Stones & Cement are not
environment friendly environment friendly
SVFUPL
Pg. 4
APPLICATION - GECB IN TRANSPORT
GREEN HIGHWAY CONSTRUCTION
Green highways are a new
concept integrating transport
with ecological
sustainability. The
embankments of the
highways can have a
sustainable alternative for SVFUPL
stabilization of the slopes.
SVFUPL
Pg. 5
SVFUPL
Pg. 6
GREEN REINFORCED EARTH WALLS
SVFUPL
Pg. 7
RURAL ROAD CONSTRUCTION
Construction of roads in rural
areas is in itself a very
challenging job. Construction
activities would result in
exposure of the slopes for
surface run off due to erosion.
This can be very well SVFUPL
prevented by rapid
revegetation on these slopes.
GECB would ensure growth of
this vegetative cover. In
addition, this technology fits
well in the budget of rural
road construction.
SVFUPL
Pg. 8
STABILIZATION OF STEEP HILL SLOPE
Steep cut slope of Highway
embankment can be stabilized by
cost effective unique combination of
Geogreen Blanket reinforced by
metal chain link net. The Geogreen
Blanket helps in arresting migration
of fine soil particles & developing
vegetation whereas chain link net SVFUPL
provides slope stability.
SVFUPL
Pg. 9
An innovative application of Geogreen
Blanket on steep hill slope by
improvising the installation technique for
developing sustainable vegetation on
vertical cut slope in a hilly region.
SVFUPL
SVFUPL
SVFUPL
Pg. 10
STEEP RAILWAY CUT SLOPE
The steep cut slope of railway can be protected with the help of
Geogreen Blanket reinforced with metal chain link. The Geogreen
Blanket helps in controlling surface soil erosion at micro level where as
chain link enhance the slope stability.
SVFUPL SVFUPL
SVFUPL SVFUPL
Pg. 11
OUR PRODUCTS ARE CERTIFIED BY
TELEPHONE: CELLPHONE:
+91-80-23223800 +91-9448284984
+91-80-23230400
EMAIL:
SALES@SVFUPL.COM
SA INFRASTRUCTURE
CONSULTANTS PVT LTD
Fror No-I,2& 3 Khosro No-l2l;House -l:f;:rgrt,
Bhowon Pohori, pO-Borkochno, uizopprr. pi"_i5i5di
Emoil : fl .voronosi.nhZ@gmoil.com
To,
The Project ilanager
M/s Dilip Buitdcon Limited
Dagmagpur-Latganj (pKG-2)
Mizapur, Uttar pradesh.
Sub:
Dear Sir,
with reference to cited subject and as per reference letter the factory visit of
Geo-Green material
atSriVenkateshwara Fibre Pvt. Ltd Bangalore was canied out by nltrority
engineer along with
contractor representative on dated2g. 1 2.2OZO.
As per test conducted during visit and third party test report the Geo Green
Material of the
aforesaid manufacture has been found suitableior slope protection work of the highway project.
The test report is attached for ready reference.
Thanking you and assuring of our best services all the times
Yours faithfully
V^"r\/
(DrLtP SHAHr)
Team Leader
Encl: As above.
cc: - Proiect Director, NHAI, Mizapur-- For your kind information please.
6Sh.l 600
Da& 28,12,20?0
Bakh No, 22
TemperaErre 250e
Pre-Tendon Load ON
?00,00 Sq,rnnt
CS Area
Wid*t ?00.00 mm
ry\
By $# , 80fl9 aluru'
trt{lat{ l
M
Te*ted :
Ci.**kcd BY :
':\,
,}r>:
'ry E
$ffiv
I F"$ r:
st?# Irarff Fibre tfulyog
ll{achine No.:ST$-J9S
rffiNslm rxgi$R6pr{
Rrport l.o.ll_{
{tond vs Displacen:ent}
LOAD 0r&
ftl.
PrrtHo.
Fx7 rSWU
Brt iilu. :
B4r" Sprc t{o. rA$Ilt$46$5
Lq.dCd ; {t0,{$ll.
78s.6
frrprr*nr r 2t'f
3prrd r X0mttrJmfn
676.
Pn Ttnrion Lard :0 t{.
$urgc Lrngfi ; l00.mm.
t{rr Lord r S{:.dff"
6!r,6
IrrElong :703!(,CI0Sounl
Imr lfrngtr r d.2,{ klPr
60r.
C8tuu i ?00.00 $q,ilnr
It dut : f00,000 mra
{xu"r
11,
t6t.6
t6t,
01.6
DISP mm.
&$a..&#$.:+.rss.,
Testd 8y:*,*
,#w$t$
ry
"sffi
SRI VtrNKATtrSHWARA F'IBRE UDYOG
crN (u20?g0rQ\2013prc070467)
PVT LTD.
I GS.rlN (29Adr CS44r.{Q1 Zr,)
RD FO IN TIO OF
OSION LB NK SLO ST.
Step II
Step IV
sp
TWU-
SRI 1,/E}'IIGTESHWARA FIBRE UDY'G
cI -r uz0p$0K{s0 I 3p'r'c0204 67) PVT LTD.(
lijxfl....1ffiffi]11::],,,',,:.,.,.,',,,||1,..'''...::t.Y.itffltY:.staiffiffirlisfiIffi.fi'...'....'..... IG s.n N (2 9AATC s4*, oa,}r:)
Step V Jllt
Urrr.ll blankct down slope in the direction of the
upP(lr trenclr' The blanket should not be sketched flow through the
water
firur t ontact with the soil and the end of the but should have
branket should be inserted in
thc tot'kench before back filling of soil. Ancr,or
blanket with hook, at
leust rrtle hool< per
$ mtr speciail| on the overlapped area. The construction
of t t''tsh barrier should b. pr"i".ubly done after installation of GECB
witlroLrt dishrrbing the instalied GECB. The excavated soil for fixing
bar.it'r shoul'-l be spread uniformly on the shoulder crash
or to be removed from
thc .sitc.
Step VIII
Step IX Aftcr_earej
''
-l
*1d
ri''
J-.'*.
,'l
,.
tl
"t,
lgsyfrk, i tr ',,*/.:.1
.-
TYI'I(,\ \,r,ll
Sl)lI. i
S1 Lrii.a\I[rN I
f,
,i
,
ft
ffi
,rfl
I
.il
t
i
,$
:€
I
{;{
s
li
i
ffi#
Y
$TFU
slir \rj 'Fit{
To,
The SPV Head,
PNC Bithur Kanpur Hrghnrays Private Limite{
Village - Nonha KalarU Nonha Narsingh Road,
Chaubepur, Kanpur (2O9ZO3) Uttar Pradesh
Email : sov.bkhpl@oncinfratech.com
Sub: "4-laning of Aligarh-Kanpur Section from km. 356+000 (Design Charnage 373+085) to
km414+000 (Design Chainage 433+728) (Package-V from Mitrasen-Kanpur) of NH-91 in the
State of Uttar Pradesh on Hybrid Anrrurty Mode under Bharatnala Pariyojna"- Source Approval
- Slope Protection Item- Submission of Documents- Reg.
Dear Sir,
This has reference to tle subject and your/our letters cited in ref. no. 2 to 8, the submitted documents for
Source Approval -Slope Protection work including Presentation done by the material supplying agency
lWs Sri Venkateshwara Fibre Udyog Pvt. Ltd. B-51, NOIDA, UP at PIU NHAI has been reviewed and
found satisfactory. Hence tbe subject agency has been approved for the slope protection work.
Furthermore, the Concessionaire is hereby advised for conducting a third parly/in house testing of Slope
Protection Material to be used for each lot in presence of IE representative before use of the same in
permanent constuction work
This is for your information and necessary action as per the requirement.
(Team Leader)
1. The Proj HAI, PIU Kannauj, 39, Mukherjee V.ihar, Indira Nagar, Kanpur,
Uttar Pradesh-208026.
2. The lndependent Engineer, SA Infrastructure Consultants Pvt. Ltd., 1101A, llhFloor,
Tower A-II, Corporate Park, Plot No.7All, Sector-142, Noida, Uttar Pradesh - 201301.
www.soinfro.com