HIGH-RISE STEEL STRUCTURE PROJECTS

HAVE BEEN DESIGNED, MANUFACTURED AND DELIVERED


BY WORLD STEEL

WWW. WORLDSTEELGRO UP.COM


DESIGN PROCESS STANDARDS & DESIGN SOFTWARES
01. ARCHITECT DRAWING
DESIGN SOFTWARES DESIGN & MANUFACTURING STANDARDS
Receive client’s required information such as architect drawing,
location, load,… to propose solutions that are suitable for the
client’s budget.

02. DESIGN AND CALCULATION During the design process, WORLDSTEEL GROUP currently adheres to the following
latest softwares such as SAP, American standards. However, we can design according to
Engineering experts offer optimal design solutions that meet the Staadpro, Etabs, Autocad, the specific requirements of our clients, including American,
original architect requirement and comply with the standard code. Tekla,… are applied. European, Japanese, or Vietnamese standards (TCVN).

03. APPROVAL DRAWING

Submit to client the APD Drawing including: Anchor Bolts Plan,


Cross Section, Sidewall & end wall elevation and connection detail,
to help client check with the architect and approve.

04. BIM MODEL DESIGN

Build 3D models to double check the architecture and structures,


make sure there are no technical issues before releasing fabrication
drawings. IBC 2024 International AISC 360-22
Building code Specification - Structural

05. SHOP DRAWING

Implement and issue detailed shop drawings for the project

06. ERECTION DRAWING AISI S100-2020: North American Specification ASCE/SEI 7-22: Minimum
The erection drawing is shown with Marked Part Number of all for the Design of Cold-Formed Steel Structural Design - Loads for Buildings
Steel Components to avoid the mistakes in the erection stage.
The Erection Department cross - check the drawings and erection
solution during the fabrication stage.

07. AS-BUILT DRAWING


After completing all stages of construction and erection, the
Engineering team will make as-built drawings for the project
based on the design control process and actual construction at
MBMA 2018 Metal AWS D1.1/D1.1M: 2020
the construction site.
Building Systems Manual Structural.Welding Code-Steel
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

TIEN GIANG TONGWEI


FACTORY
TONGWEI Group is the number one Chinese company in the
field of manufacturing aquatic food. The group has more than
110 subsidiaries, distributed throughout China and Southeast
Asia. Tien Giang Tongwei is a large-scale project located in
the southwestern key point, after completion, the factory will
provide aquatic food for the entire Southwestern region.
WORLDSTEEL GROUP takes on the role of EPC contractor
for this project.

Client
TONGWEI GROUP

EPC contractor
WORLDSTEEL GROUP

Field
AGRICULTURE

Area
33,000M²

Location
LONG GIANG INDUSTRIAL PARK, TIEN GIANG PROVINCE

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

HAI DUONG TONGWEI


FACTORY
After the success of the Tien Giang TongWei project, WORLD
STEEL was trusted by the investor TONGWEI group, continuing
to undertake the Hai Duong TongWei project. This is a key project
in the North, after completion, the factory will provide aquatic
food for the whole Northern region. WORLD STEEL is the EPC
contractor of the Hai Duong Tongwei project.

Project name
HAI DUONG TONGWEI

Location
LAI CACH INDUSTRIAL ZONE - HAI DUONG PROVINCE

Field
AGRICULTURE

EPC contractor
WORLDSTEEL GROUP

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

SHENG LONG AQUATIC FOOD


FACTORY
Sheng Long aquatic food factory project is one of the
large-scale production factory projects, built on an area of
52,000m2, located in Cong Hoa Industrial Park, Chi Linh, Hai
Duong. WorldSteel Group assumes the role of project EPC
contractor, implementing the entire project with large items
such as: raw material warehouses A1+A2, finished product
warehouse, packaging warehouse, office building, parking
lot,...

Client
TONGWEI GROUP

EPC contractor
WORLDSTEEL GROUP

Field
AGRICULTURE

Area
33,000M²

Location
LONG GIANG INDUSTRIAL PARK, TIEN GIANG PROVINCE

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

VINH LONG HAI DAI


FACTORY
Vinh Long Hai Dai aquatic feed factory officially held
a groundbreaking ceremony on August 16, 2023.
With a total area of 20,000m², total capacity of
200,000 tons per year. Once completed, the factory
will provide a full range of high quality products to
farmers in the Western market - a key seafood region
of Viet Nam.

Project name
VINH LONG HAI DAI AQUATIC FEED FACTORY

Location
HOA PHU INDUSTRIAL PARK, LONG HO DISTRICT,
VINH LONG PROVINCE

Area
20,000M²

Field
AGRICULTURE

Project EPC contractor


WORLDSTEEL GROUP
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

WORLDSTEEL GROUP OFFICE BUILDING


PROJECT IN LONG AN
WorldSteel Group office building was built in Duc Hoa, Long
An with a scale of 6 floors with a floor area of nearly 2000m²,
designed in a modern open space.

The project uses high-quality structural steel products


designed, manufactured and constructed by World Steel's
own team.

Investor
WORLDSTEEL GROUP

EPC Contractor
WORLDSTEEL GROUP

Field
OFFICE BUILDINGS

Location
HAI SON INDUSTRIAL PARK (PHASE 3+4),
DUC HOA HA COMMUNE, DUC HOA DISTRICT,
LONG AN PROVINCE

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

WORLDSTEEL GROUP
OFFICE - HCMC

Project name
WORLDSTEEL GROUP OFFICE - HCMC

Location
PHU THO HOA WARD - TAN PHU - HCMC

Field
MID-RISE BUILDINGS

Project EPC contractor


WORLDSTEEL GROUP

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

NAM LONG
WAREHOUSE
Nam Long project is a cooperation between WORLD STEEL Construction
Joint Stock Company and Nam Long and Trading Service Company Limited.
The project's purpose is a factory area for rent, built with steel structure for
the main workshop along with office blocks and other auxiliary items.

Project name
NAM LONG WAREHOUSE

Location
LONG HAU INDUSTRIAL PARK, CAN GIUOC DISTRICT, LONG AN PROVINCE

Investor
NAM LONG TRADING AND SERVICE COMPANY LIMITED

Project EPC contractor


WORLDSTEEL GROUP

Scan the QR Code


to watch the project video
TYPICAL PROJECTS TYPICAL PROJECTS

HIGH-RISE STEEL STRUCTURE PROJECTS

BEN TRE EXHIBITION HOUSE


Investor Scope of work
HAI TRUNG FURNITURE CO., LTD DESIGN, MANUFACTURE AND ERECTION

Field Location
EXHIBITION HOUSE HUU DINH COMMUNE, CHAU THANH DISTRICT, BEN TRE PROVINCE
WORLD STEEL CONSTRUCTION JOINT STOCK COMPANY
Head Office: No.55, Le Thuc Hoach St., Phu Tho Hoa Ward, Tan Phu Dist., HCM City, Viet Nam
MR. THAO DANG (VICTOR) Factory: Lot Q9-10-15-16, St. No.7, Hai Son Industrial Park (Phase 3+4),
Duc Hoa Ha Commune, Duc Hoa District, Long An Province, Viet Nam
INTERNATIONAL SALES & MARKETING DIRECTOR Manila Office Address: Unit 1828 - Tower B - Solemare Parksuites, Lot 5A, Bradco Avenue,
Aseana Business Park, Barangay Tambo, Paranaque City, Philippines
Email: dang.victor@worldsteelgroup.com Cebu Office Address: Unit SV2022 Sunvida Tower Across SM City, North Reclamation Area,
Cebu City, Philippines
Hotline: +84 902 881 833 (WhatsApp/ Viber/ Telegram/ Line/ Zalo) World Steel in the U.S: 7302 Emerson Ave, Westminster, CA 92683, USA
Email: business@worldsteelgroup.com - Website: www.worldsteelgroup.com
Linkedin: https://www.linkedin.com/in/dangvictor/ Hotline: (+84) 28 6293 6666 - Project Hotline: (+84) 939 355 789

ONLINE BROCHURE WORLDSTEEL GROUP 'S OFFICIAL CHANNELS

中文 TIẾNG VIỆT
Website Facebook Linkedin Youtube

You might also like