You are on page 1of 5

Inspection and Test Plan for Power Cable

Activity By Remark
No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document
Manuf. TPI Client ‐

1 Pre‐Inspection Meeting Spec. Spec. MOM H H H ‐

Before Manufacturing

DWG, Design, IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF, DWG,
2 H R A ‐
Calculation Document ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA Calculation book

Power Cable Conductor IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
3 Procedure H R A
Resistance Test Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Withstand IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
4 Procedure H R A
Voltage Test Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Insulation IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
5 Procedure H R A
Resistance Test Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Discharge IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
6 Procedure H R A
Test Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Tensile


IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
7 Strength and Elongation Procedure H R A
ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA
Test Procedure

Power Cable Aging Test IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
8 Procedure H R A
Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

1
www.inspection‐for‐industry.com
Power Cable Heat Shock IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
9 Procedure H R A
Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Heat IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
10 Procedure H R A
Distortion Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Power Cable Flame


Resistance Test IEC, NEC, NEMA, FDF, IEC, NEC, NEMA, FDF,
11 Procedure H R A
Procedure ISO ANSI, CI, IPCEA ISO ANSI, CI, IPCEA

Materials

Original Material
12 Raw Material Inspection ASTM ASTM H H ‐ ‐
Certificates

13 Review of Certificates ASTM ASTM Certificates H H ‐ ‐

14 Material Identification ASTM ASTM Report H H ‐

During Fabrication

15 Fabrication Inspection DWG/Spec DWG/Spec Report H SW ‐

2
www.inspection‐for‐industry.com
Configuration Inspection
for Cable Type, Number
of Conductors, Conductor
Size, Conductor Color
Coding, Insulation Type
and size, Fillers, Water
16 DWG/Spec DWG/Spec DWG/Spec H SW ‐
Stoppers, Armour, Shield,
Outer diameter, Other
Specified
Elements/Dimensions and
Cable Identification

Drum Inspection for


Labeling, Sealing, Lagging
17 Drum quantity and DWG/Spec DWG/Spec Report
Conformance of quantity

Power Cable Conductor


18 Procedure Procedure Report H H ‐
Resistance Test

Power Cable Withstand


19 Procedure Procedure Report H H ‐
Voltage Test

Power Cable Insulation


20 Procedure Procedure Report H H ‐
Resistance Test

Power Cable Discharge


21 Procedure Procedure Report H H ‐
Test

3
www.inspection‐for‐industry.com
Power Cable Tensile
22 Strength and Elongation Procedure Procedure Report H H ‐
Test

23 Power Cable Aging Test Procedure Procedure Report H H ‐

24 Power Cable Heat Shock Procedure Procedure Report H H ‐

Power Cable Heat


25 Procedure Procedure Report H H ‐
Distortion

Power Cable Flame


26 Resistance Test Procedure Procedure Report H H ‐

Final Inspection
Final Visual &
27 DWG DWG Report H H ‐ ‐
Dimensional Check
28 Check of Final Book Spec. Spec. DWG/ P.O H R ‐

Documentation

29 Inspection Reports Spec./DWG Spec./DWG Report H R ‐ ‐

30 NCR Spec./DWG Spec./DWG Report H R ‐ ‐

31 Review Final Data Report Spec./DWG Spec./DWG Report H R ‐ ‐

Pre‐Shipment Inspection

32 Preservation and Packing Spec. Spec. Report H H ‐ ‐

33 Marking Spec. Spec. Report H H ‐ ‐

4
34 Loading Inspection Spec. Spec. Report H H ‐ ‐
Shipping Document
35 Procedure Spec. Packing List H H ‐ ‐
Control
Abbreviations:

H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;
Client can waive this inspection based on his discretion and informs TPI Inspector accordingly.

R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
A: Approval
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring;