Dayang Enterprise Sdn. BHD.: Inspection and Test Plan (Electrical)

The document outlines Dayang Enterprise's inspection and test plan for electrical work. It details 13 activities to be inspected, including material receiving, welding procedures, cable pulling, testing, and equipment installation. For each activity, it specifies the inspection methods, verifying documents, acceptance criteria, and identifies who is responsible for inspection and obtaining client approval. The plan provides a legend defining different approval roles for inspections including holding work until approval, inspecting, reviewing documentation, and witnessing activities.

Uploaded by

Amy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views3 pages

Dayang Enterprise Sdn. BHD.: Inspection and Test Plan (Electrical)

The document outlines Dayang Enterprise's inspection and test plan for electrical work. It details 13 activities to be inspected, including material receiving, welding procedures, cable pulling, testing, and equipment installation. For each activity, it specifies the inspection methods, verifying documents, acceptance criteria, and identifies who is responsible for inspection and obtaining client approval. The plan provides a legend defining different approval roles for inspections including holding work until approval, inspecting, reviewing documentation, and witnessing activities.

Uploaded by

Amy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DAYANG ENTERPRISE SDN. BHD.

( 61505-V )

INSPECTION AND TEST PLAN (ELECTRICAL)


PROJECT : WO# : AREA :

ACTIVITY ACTIVITY INSPECTION METHODS VERIFYING DOCUMENT ACCEPTANCE CRITERIA CONTROL POINT
ITEM INSPECTOR CLIENT
1.0 MATERIAL RECEIVING INSPECTION
1.1 Material receiving inspection • Check material against DO • DO/ PO/ Mill certificate • Material receiving and inspection report H W/ R
• Dimension Check against • Manufacturer’s test report
AFC Drawings • Factory acceptance test
• Check quantity and condition documents
• Megger check for cable (on
drum)
2.0 MATERIAL VERIFICATION
2.1 Material verification and Material grade • Mill certificate • Material verification report H W/R
dimensional check Heat no • AFC drawings
Dimensional check • Manufacturer data sheet
3.0 WPS AND WQT
3.1 WPS • Approved WPS and PQR • AWS D1.1 • WPS and WQT record H W
3.2 Welder qualification • Welder ID • WQT • WQT H H/ R
• WQT • AWS D1.1 • Revalidation date record
• Welder revalidation update • Revalidation date record
4.0 INSPECTION
4.1 Fit up inspection and • Weld preparation • AFC drawing • Fit up report W W/ R
dimensional check • Alignment
• Dimensional check
4.2 Visual inspection and • Visual check • Approved WPS • Visual inspection report W W/ R
dimensional check • Dimensional check • AWS D1.1
5.0 CABLE PULLING
5.1 Pulling cables and secure to • Cable routing • Manufacturer’s data • Installation report W W/ R
cable tray • Cable type and sizes • AFC drawing • Inspection test report
• Workmanship and cable • Cable schedule
dressing • Project specification
6.0 TEST
6.1 Perform megger test and • Cable insulation • Manufacturer’s data • Inspection test report H W/ R
continuity check of cables • Megger reading • AFC drawing
• Correct end points • Cable schedule
• Project specification
DAYANG ENTERPRISE SDN. BHD.
( 61505-V )

INSPECTION AND TEST PLAN (ELECTRICAL)


PROJECT : WO# : AREA :

ACTIVITY ACTIVITY INSPECTION METHODS VERIFYING DOCUMENT ACCEPTANCE CRITERIA CONTROL POINT
ITEM INSPECTOR CLIENT
7.0 INSTALLATION
7.1 Electrical equipment installation • Tubing routing • Manufacturer’s data • Inspection test report H W/ R
• Test pressure • AFC drawing
• Duration & leak test • Project specification
• Test gauges
8.0 Termination check (cable) • Correct termination • Manufacturer’s data • Inspection test report W W/ R
• AFC drawings • AFC drawing
• Single line diagram • Cable schedule
• Project specification
9.0 Loop check • Correct loop • AFC drawing and loop • Inspection test report W W/ R
• Correct end point check
• Cable schedule
• Project specification
10.0 Earth check and resistance • Earth electrode • AFC drawings • Inspection test report H W/ R
check • Correct joints and continuity • Layout drawings
check • Project specification
• Resistance measurement
11.0 Functional check of electrical • Type and rating • Manufacturer’s data • Inspection test report H W/ R
equipment • Correct assembly and tighten • AFC drawings
of end point connection • Single line diagram
• Functional check as per • Project specification
manufacturer’s data
13.0 Compilation of QAQC • Check all QC documents and H R
documentation test report in place and sign
• As built drawings

LEGEND

H (Hold): No further work progress until the activity is verified and approval given by QAQC Department and/or Client.
I (Inspect): Verification inspection or test activity. Carried out by Operation Team or Quality Department.
R (Review): Verification of documentation, carried out after activity is done.
W (Witness): Notice to be given before activity takes place for Client or QAQC Department to witness. Activity continues if inspector or client representative not present as scheduled.
DAYANG ENTERPRISE SDN. BHD.
( 61505-V )

INSPECTION AND TEST PLAN (ELECTRICAL)


PROJECT : WO# : AREA :

PREPARED BY AGREED BY ACCEPTED BY

NAME : ALIZZAWATI BT MOHAMAD SAPA NAME : IR YEM MOHAMAD SHARIF NAME :


POSITION : QAQC ENGINEER POSITION : PROJECT MANAGER POSITION : JX NIPPON TECHNICAL AUTHORITY
DATE : DATE : DATE :