| 4X Nippon Oil & Gas Exploration (Malaysia)
ex Limited
INSPECTION TEST RECORD (ITR) - A
__ PRESSURE TEST POa-A
Project No. (431 Desqnder Phace [
Project Title Onchore Fabrication for Duovcley Prose 1 Prping Pra eel
Facilities :
INFORMATION
Test Package No_| Afe-[ Test Pressure He Bary
System S TTest Medium Wee
Sub System AY Test Duration | four
Location DEB YARD [Test Date Se [es Peg
INSPECTION / TEST ‘OK [N/A] P/LNo
1 | Verity to ensure that al piping construction / installation activities @s |
per test package limit have been completed. |
2_| Ensure that water flushing ( PO3A)_has been completed aa |
3 | Pre-Test preparation is complete and PO2-A is attached together with | /~ |
P&ID where test limits are clearly marked.
14 | Preliminary Piping Punch List is attached and all “A” items on line are a
clear and have been signed off.
5_| Calibration Certificates for Recorders and Gauges are attached. =
6 | Instruments as stated in procedure are removed.
7_| Test Temporaries are installed =
8_| Permit to Work or HSE authorization isin place. =
9_| Release for Pressure Test. = ee
Record data as below :- |
Pressure Temperature _| Remark
0% a a |
10 | | 2596. sec | = | |
50% Bee =
75% °c :
100% 2E"e =
11 | Pressure test complete = =
COMMENT(S) AND ADDITIONAL INFORMATION. |
ReLaih: NUREd — No cipro Henlage word chacnsed duns [oid Fine
Repo Ho + DE /rAa/ MuPPON /14t /o03 fu
COMPLETED BY VERIFIED BY ‘ACCEPTED BY
Designation Contractor Representative | _JKN Inspector IXNIPPON Engineer
‘Company
Name yout ua au | Buen Simian
Signature ie
Date aspepror4 [aman 20
Page 1 of 1ax JX Nippon Oil & Gas Exploration (Malaysia)
imited
INSPECTION TEST RECORD (ITR) - A
BLOWING/DRYING POS-A
Project No. (Ast Decode, eT
ProjectTitle _|Anebort tabricahon for
Facilities
INFORMATION
Test PackageNo | Ajo. ( Blowing Pressure 10 Bara
System, I Blowing Medium Dey Ate
Sub System Ws ZS Blowing Duration
Location Dee Yep 3 Blowing Date agleeo4
INSPECTION / TEST OK [N/A | P/LNo
1_| Verify to ensure that pressure test (PO4A) has been completed 4
2__| Ensure that water flushing ( PO3A) has been completed Z
3, | Ensure that the test medium has been drained upon completion ofthe | =
hydrotest.
4 | Ensure that no water is trapped in the system 7
5_| Ensure that blowing medium/ compressed air humidity is 30 Deg Zz
6 _| Ensure that all the blowing point humidity is -10 Deg.
7__| Permit to Work or HSE authorization isin place.
Record data as below::
Blowing Injt__| Blowing Point Humidity [Result ]
COMMENT(S) AND ADDITIONAL INFORMATION
~ Bouma [Onin] MHA ve parm ea nig ih 8 piderm wth Het
taslotlakton at offshore pleddberren
| “compueren By VERIFIED BY ‘ACCEPTED BY
Designation | Contractor Representative IX NIPPON IX NIPPON Discipline Engineer
| Inspector
Company pee & aN ai
Name Zo ons Jorn axcxous |“ Baot_Sianen
‘Signature — RS om,
Date (29) ESCES MAL DO
Page 1 of I& Limited
INSPECTION TEST RECORD (ITR) - A
Project No.
JX Nippon Oil & Gas Exploration (Malaysia)
ian)
Project Title ore Xavicetion for Desavelev Phase |
Facilities
Test P eae dow V>ee
System Ze Painting Code | 2~c 7 >
‘Sub System WA
Location
ri er P/L NO
1_| Verify to ensure that all piping activities have been completed.
2_| Ensure that all piping ITRs have been completed and available.
3_| Sharp edges are removed prior to application. |
4 | All masking are completed.
5 ig supports are painted
6_[ Spot painting are performed. z
Dry film thickness is checked to be correct.
7 | Record details:-
8 _| Record any defective area(s) on Punch list. Zz
9 | Attached drawing(s) with highlighted piping sections are checked.
10 _| Line numbering is according to P & ID. Z
11_| Flow direction is according to P & ID. a
12 _| Color coding is according to project requirements. z=
13 _| Tagging of manual operated valves is correct.
14_| All safety / warning signs are in correct locations.
Note: This painting / coating is also applicable to $S/DSS/SDSS
piping as per project paint spec.
[| cOMMENT(S) AND ADDITIONAL INFORMATION
xLe
Cb CL? KIT ONO COA? ONFY, YO CORT/HUE FINAL
AP VE, COPPA RE) HR pat yo
aller foal cont st insledahion ot obsherd
7
SEAT ae Be eS rey | i
Designation fepresentative | JX NIPPON IX NIPPON Discipline
fo (tae 2 Inspector Engineer
‘Company Nees]
Name Sear ey Vanes Tye atin wine | Gad Simian
‘Signature &
Date Flor) MARIS
Page 1 of |