You are on page 1of 3
| 4X Nippon Oil & Gas Exploration (Malaysia) ex Limited INSPECTION TEST RECORD (ITR) - A __ PRESSURE TEST POa-A Project No. (431 Desqnder Phace [ Project Title Onchore Fabrication for Duovcley Prose 1 Prping Pra eel Facilities : INFORMATION Test Package No_| Afe-[ Test Pressure He Bary System S TTest Medium Wee Sub System AY Test Duration | four Location DEB YARD [Test Date Se [es Peg INSPECTION / TEST ‘OK [N/A] P/LNo 1 | Verity to ensure that al piping construction / installation activities @s | per test package limit have been completed. | 2_| Ensure that water flushing ( PO3A)_has been completed aa | 3 | Pre-Test preparation is complete and PO2-A is attached together with | /~ | P&ID where test limits are clearly marked. 14 | Preliminary Piping Punch List is attached and all “A” items on line are a clear and have been signed off. 5_| Calibration Certificates for Recorders and Gauges are attached. = 6 | Instruments as stated in procedure are removed. 7_| Test Temporaries are installed = 8_| Permit to Work or HSE authorization isin place. = 9_| Release for Pressure Test. = ee Record data as below :- | Pressure Temperature _| Remark 0% a a | 10 | | 2596. sec | = | | 50% Bee = 75% °c : 100% 2E"e = 11 | Pressure test complete = = COMMENT(S) AND ADDITIONAL INFORMATION. | ReLaih: NUREd — No cipro Henlage word chacnsed duns [oid Fine Repo Ho + DE /rAa/ MuPPON /14t /o03 fu COMPLETED BY VERIFIED BY ‘ACCEPTED BY Designation Contractor Representative | _JKN Inspector IXNIPPON Engineer ‘Company Name yout ua au | Buen Simian Signature ie Date aspepror4 [aman 20 Page 1 of 1 ax JX Nippon Oil & Gas Exploration (Malaysia) imited INSPECTION TEST RECORD (ITR) - A BLOWING/DRYING POS-A Project No. (Ast Decode, eT ProjectTitle _|Anebort tabricahon for Facilities INFORMATION Test PackageNo | Ajo. ( Blowing Pressure 10 Bara System, I Blowing Medium Dey Ate Sub System Ws ZS Blowing Duration Location Dee Yep 3 Blowing Date agleeo4 INSPECTION / TEST OK [N/A | P/LNo 1_| Verify to ensure that pressure test (PO4A) has been completed 4 2__| Ensure that water flushing ( PO3A) has been completed Z 3, | Ensure that the test medium has been drained upon completion ofthe | = hydrotest. 4 | Ensure that no water is trapped in the system 7 5_| Ensure that blowing medium/ compressed air humidity is 30 Deg Zz 6 _| Ensure that all the blowing point humidity is -10 Deg. 7__| Permit to Work or HSE authorization isin place. Record data as below:: Blowing Injt__| Blowing Point Humidity [Result ] COMMENT(S) AND ADDITIONAL INFORMATION ~ Bouma [Onin] MHA ve parm ea nig ih 8 piderm wth Het taslotlakton at offshore pleddberren | “compueren By VERIFIED BY ‘ACCEPTED BY Designation | Contractor Representative IX NIPPON IX NIPPON Discipline Engineer | Inspector Company pee & aN ai Name Zo ons Jorn axcxous |“ Baot_Sianen ‘Signature — RS om, Date (29) ESCES MAL DO Page 1 of I & Limited INSPECTION TEST RECORD (ITR) - A Project No. JX Nippon Oil & Gas Exploration (Malaysia) ian) Project Title ore Xavicetion for Desavelev Phase | Facilities Test P eae dow V>ee System Ze Painting Code | 2~c 7 > ‘Sub System WA Location ri er P/L NO 1_| Verify to ensure that all piping activities have been completed. 2_| Ensure that all piping ITRs have been completed and available. 3_| Sharp edges are removed prior to application. | 4 | All masking are completed. 5 ig supports are painted 6_[ Spot painting are performed. z Dry film thickness is checked to be correct. 7 | Record details:- 8 _| Record any defective area(s) on Punch list. Zz 9 | Attached drawing(s) with highlighted piping sections are checked. 10 _| Line numbering is according to P & ID. Z 11_| Flow direction is according to P & ID. a 12 _| Color coding is according to project requirements. z= 13 _| Tagging of manual operated valves is correct. 14_| All safety / warning signs are in correct locations. Note: This painting / coating is also applicable to $S/DSS/SDSS piping as per project paint spec. [| cOMMENT(S) AND ADDITIONAL INFORMATION xLe Cb CL? KIT ONO COA? ONFY, YO CORT/HUE FINAL AP VE, COPPA RE) HR pat yo aller foal cont st insledahion ot obsherd 7 SEAT ae Be eS rey | i Designation fepresentative | JX NIPPON IX NIPPON Discipline fo (tae 2 Inspector Engineer ‘Company Nees] Name Sear ey Vanes Tye atin wine | Gad Simian ‘Signature & Date Flor) MARIS Page 1 of |

You might also like