Professional Documents
Culture Documents
ELECTRICAL DESIGN
OF
ED-04 ELECTRICAL CONDUIT (LIGHTING ) LAYOUT PLAN FOR HALL ROOM SUBMITTED
ED-05 ELECTRICAL CONDUIT (POWER & SOUND CABLE) LAYOUT PLAN FOR HALL ROOM SUBMITTED
AF Amplifier of sound system P 13A 3-pin Socket, Flat pin, 9" from FFL.
SB Switch Board, 4'-0" from FFL, 6" away from door frame Q 15/16A 3-pin Socket for A/C, Round pin,
(Bottom at A/C Bottom & 6" apart from A/C)
F Ceiling Fan, 56"/48"/36" Sweep (EF for Emergency) AC A/C, Out door M/C at Outside
WF Wall Fan at 7'-6" from F.F AC-OU A/C, Indoor Split, 7'-0" from FFL
TL Tube light at the wall, 7'-6" from FFL 1" dia PVC Conduit for Electric POWER Cable
ML Mirror light at the top of basin 1" Ø PVC Conduit for Sound System Cable
GENERAL NOTES :
1. The contractor has to survey the site properly before execution. 8. All the conduits will be of water grade and its thickness will be 2 mm.
He has to inform the authority about any descripencies. 9. Unless specified Cable shall not be exposed.
2. The contractor has to keep all safety equipment at site for 10. Continuity of the cable shall be checked before fixing or installation.
labour and all materials and construction work.
11. 3-pin socket (Q) for Window type A/C will be 6" apart from the A/C
3. All conduit shall be of water grade as approved by the authority. and bottom level will be same as A/C bottom..
4. Color code must be maintained. 12. The connection of 2-pin (R) from switch board circuits will be of 2.5 rm BYA
Cable shall be Red, Yellow & Blue for phase and Black for neutral. Cable but 2-pin (S) at bathroom will be of 1.5 rm BYA Cable.
Intermediate Cable joint shall not be permitted.
13. Cable running underground shall be of NYY type.
5. Minimum size of the Cable shall not be less than 1.5 rm BYA Cable.
6. Vertical/Horizontal conduit in wall shall be concealed and saddled properly.
DESIGN ORGANIZATION ELECTRICAL DESIGN RECOMMENDED BY REVISION SHEET NO: ED-02
GOVERNMENT OF THE PEOPLE'S REPUBLIC OF NAME OF SCHEME:
BANGLADESH 1 STORE TYPICAL HALL ROOM AT VARIOUS UPAZILAS UNDER DESIGN UNIT OF LGED REV. NO. DATE DESCRIPTION BY E. SHEET:
LOCAL GOVERNMENT ENGINEERING DEPARTMENT EXTENSION OF UPAZILA COMPLEX PROJECT RDEC BHABON (LEVEL - 4), LGED,
AGARGAON, SHER- E- BANGLA NAGAR, DATE 12-May-19
NAME OF PROJECT: DISTRICT: UPAZILA: UNION: DHAKA - 1207. :
Cad By:
Proposed Typical Hall Room at Various Upazilas under Extension TEL. : +88 02 9119609, +88 02 9123980 ANIKA SADIA REZA MD. ALIM-UL-AL-RAZI
FAX : +88 02 9118175 Junior Engineer (Electrical) SE (DESIGN)
of Upazila Complex Project DRAWING TITLE : LEGEND FOR ELECTRICAL PLAN Assistant Engineer (Electrical)
E-mall: design@lged.gov.bd Design Unit, LGED HQ. Design Unit, LGED HQ LGED HQ, Dhaka.
UP
2'-6"
6'-0" 6'-0" 2'-7" 2'-7"
2'-6"
2'-6"
2'-6"
SP SP SP SP SP SP SP
SB-T4
EXF EXF
AC-OU AC-OU AC-OU AC-OU
2'-21 2"
TOILET
1'-6"
Q-6
SB-C2 AC(5)-2.5TON
2'-0" AC(6)-2.5TON R AC(7)-2.5TON AC(8)-2.5TON
SP
SB-T5 1'-11" 2'-6"
8'-0" SP R ML
CCL
SB-06
2'-3"
5'-0"
5'-0"
CCL CCL SB-T3
R-3
1'-81 2"
PL PL PL PL PL PL PL Switch level
P-9 SP
ML
UP
8'-21 2"
8'-21 2"
2'-01 2"
SP CF CF CF CF
11" ML
1'-9"
P-8 R-2 SB-05
Amplifier
Switch level
LADIES
TOILET
5'-2"
PL PL
CL
P-7
2'-7"
CCL
2'-61 2"
8'-10"
8'-10"
8'-10"
SB-11 Switch level
R-8
1'-10"
7'-0"
P-15 EXF
PL
PL PL PL PL PL PL
CF
9'-91 2"
P-6
Switch level
SB-T2
R-7
8'-2"
8'-2"
SB-C2
SB-10 DRESSING
P-14 6'-0" HL WF
CF CF CF CF
PL
PL
2'-6"
P-10
CCL
D1
2'-0" 2'-0"
7'-0"
8'-1"
8'-1"
CF CL
3' DOWN THE CEILING P-11
PL
PL PL PL PL PL PL 10' ABOVE THE FLOOR FINISH
SP
D1 ML GENTS
TOILET
STAGE
7'-0"
CF
6'-0" 6'-0" 6'-0" 6'-0" SB-T1
9'-91 2"
8'-2"
SB-09 PL
SB-C1 Switch level PL
P-5 CCL
R-6 CF CF CF
P-13
3'-111 2" EXF
7'-0"
2'-0"
2'-0" CF
8'-10"
8'-10"
STORE
SB-08
1'-10" 1
2'-6" 2'-7 2"
Switch level
5'-9"
R-5 PL PL PL PL PL PL PL
6'-0"
P-12
CL SB-01
2'-21 2"
CCL
PL SB-SL
PL
8'-2"
TL
6'-11 2"
SB-03
2'-2" 2'-10"
CF CF CF CF P-3 UP
SP
GREEN
UP ROOM
5'-6"
5'-6"
5'-101 2"
Switch level P-4
6'-0"
PL PL PL PL PL PL PL R-4
SB-C1
2'-0" 8'-0" SB-07 CF
1'-6"
1'-6"
48"
SP SP R SP
AC(4)-2.5TON AC(3)-2.5TON R AC(2)-2.5TON AC(1)-2.5TON
DP Q-4 DP Q-3 DP Q-2 DP Q-1
2'-6"
2'-6"
6'-0" 6'-0"
3'-91 2"
3'-91 2"
2'-7" 2'-7"
2'-6"
2'-6"
SP SP
SP SP SP SP SP
UP
SP SP SP SP SP SP SP
SB-T4
EXF EXF
AC-OU AC-OU AC-OU AC-OU
P-9 SP
UP ML
D3
SP CF CF CF CF Switch level
Amplifier
LADIES
TOILET
PL PL P-7 CCL
CL
SB-11
Switch level
R-8
P-15 EXF
PL
PL PL PL PL PL PL
CF
P-6
Switch level SB-T2
R-7
SB-C2
SB-10
P-14
STAGE
HL DRESSING
CF CF CF CF WF
PL
PL
P-10
CCL
SB-02
UP
CF CL
P-11
PL PL PL PL PL PL PL
SP
ML
GENTS
TOILET
SB-T1
SB-09 PL
SB-C1 Switch level PL
P-5 CCL
R-6 CF CF CF CF
P-13 EXF
CF
SB-08
Switch level
R-5 PL PL PL PL PL PL PL
P-12
CL SB-01
CCL
PL PL SB-SL STORE
TL
Incoming MAIN POWER LINE:
P-1 SB-03
CF CF CF CF P-3 UP 2 x 3" Ø PVC Conduit underneath
SP
UP
P-4
E. PIT the Grade-Beam
Switch level
GREEN
PL PL PL PL PL PL PL R-4 ROOM
SB-C1
SP
SB-07 CF
48" Earthing for MDB
SP R SP
AC(4)-2.5TON AC(3)-2.5TON R AC(2)-2.5TON AC(1)-2.5TON
DP Q-4 DP Q-3 DP Q-2 DP Q-1
SP SP SP SP SP SP SP
UP
R
1" pvc SP LADIES
UP
P-8
Amplifier
LADIES
P-7 TOILET
P-15
P-6
P-14 DRESSING
P-10
UP
STAGE
e
efor
P-11
b
stin ying
GENTS
r ca e la
TOILET
1" pvc
g
floor c pipe laying b
floo vc pip
asting efore P-5
P-13
1" p
P-12
P-1
P-3 UP
UP
GREEN
P-4 ROOM
SP SP R
R
UP
ELECTRICAL CONDUIT (POWER & SOUND CABLE) LAYOUT PLAN FOR HALL ROOM
GENTS LADIES
TOILET TOILET
UP
ML
LADIES
TOILET
DRESSING
GENTS
TOILET
STAGE
STORE
UP
ABC DRY POWDER
DRY CHEMICAL UP
POWDER
UP
SL
SL
SL
ELECTRICAL CONDUIT LAYOUT PLAN FOR ROOF FLOOR
16 A SP MCB
20A SP MCB
10A SP MCB
SPARE
2XSPARE
Q4(AC-4)
Q5(AC-5)
Q6(AC-6)
Q7(AC-7)
Q8(AC-8)
Q1(AC-1)
Q2(AC-2)
Q3(AC-3)
P14,P15
SPARE
SB-02,SB-T2
SB-03,SB-04,R1
SB-08,R-5
SB-10,R-7
SB-C1,SB-C2
SB-01,SB-SL,SB-T1
SB-T3-T5
SB-05,R-2
SB-06,R-3
SB-07,R-4
SB-09, R-6
SB-11,R-8
P1,P2
P3,P4
P5,P6
P7
P8,P9
P10,P11
P12,P13
ELECTRICAL CIRCUIT DIAGRAM FOR HALL ROOM
75mm
50mm FGL
500 mm
Earthing Lead
Compact Soil
Detail - B
Inspection Pit & Earth Electrode For Building Earthing for MDB
· 1 FOR MDB