You are on page 1of 4

Chennai Metro Phase ||

Project˖ DZ1040 Ring˖ 53

Begin time˖ 10/22/2023 6:13:56 PM End time˖ 10/25/2023 12:06:33 Page˖ 1/4
AM

Work efficiency:

Advance : 96 Min Ring Building: 331 Min Standby time: 2795 Min Total : 3222 Min

Cutter Wheel: Avg Max Min


Speed[rpm]: 1.5 1.7 0.3

Torque[kNm]: 1628 2342 633

Rolling[mm]: -10 -6 -13

Thrust: Avg Max Min

Thrust[kN] : 17381 21022 2661

Speed[mm/min] : 13 25 0

Penetration[mm/r] : 7.8 14.5 0.1

Thrust cylinder:
Avg(bar) Max(bar) Min(bar)

Group A
126 133 89
Group B
170 201 139
Group C

Group D 176 217 145

0 Avg pressure(bar)
400 109 132 83

2300

0 A B C D A B C D A B C D

Min stroke(mm) Max stroke(mm) Accumulate stroke(mm)


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 53

Begin time˖ 10/22/2023 6:13:56 PM End time˖ 10/25/2023 12:06:33 Page˖ 2/4
AM
Articulation cylinder:
200 200

0 0
A B C D A B C D
Min stroke(mm) Max stroke(mm)
Avg Max Min
Contact Forcr(kN): 6249 9264 0

Grout Injection: AVG(bar) Max(bar) Min(bar) Vol(L/Line) Total(L)


1 0.2 8.8 -0.4 1600.0 4900.0

2 0 0 0 1000
1# Liquid
A 3 0.7 3.2 0 800.0
2#
4 0.6 8.9 -0.2 1500.0
3# 1.3 4.9 0.5 150.0 450.0
1
4# 2 1.1 7.8 0.7 80.0
Liquid
B 3 0.5 1.7 0.3 80.0
0
4 1.2 4.1 0.7 80.0
Avg pressure at Ports 25
Total(A And B) 5350.0 L

Earth Pressure(Excavation Chamber): Avg(bar) Max(bar) Min(bar)


1.9 2.5 0
1#
2 2.6 0
2#
2.1 2.4 0
3#
4# 1.9 2.3 0
5# 1.9 2.6 0
6#
2.1 2.6 0

0 Avg pressure(bar) 6 Total:


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 53

Begin time˖ 10/22/2023 6:13:56 PM End time˖ 10/25/2023 12:06:33 Page˖ 3/4
AM

Screw Conveyor: Avg Max Min


Speed[rpm]: 3 6 0

Pressure[bar]: 53 78 2
Torque[KNm]: 15 27 0

Front(Bar) Center(Bar) Rear(Bar)


Earth Pressure Sensor(AVG):

Tail skin grease:


1 2 3 4 5 6 7 8

Front 51 34 34 33 31 29 28 39

Rear 39 27 28 42 42 28 28 42

Front 279 Impluses Total Weight: 4.26 kg

Rear 276 Impluses Total pulses: 555 Impluses

Foam:
Avg pressure(bar) Max pressure(bar) Min pressure(bar) Sum air(m³)Litres Sum liquid(m³)Litres

1 1.6 6.9 0.5 4.4 1.94

2 1.5 6.3 0.5 5.2 1.92

3 1.2 4.9 0.3 14.5 1.95

4 0.9 4.2 0.1 23.2 1.94

5 0.8 3.8 0.2 25.1 1.95

6 0.6 4.4 0 21.1 1.95

Foam concentrate : 105 L polymers: 0.02 L


Water : 0 L Bentonite : 3.9 L
Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 53

Begin time˖ 10/22/2023 6:13:56 PM End time˖ 10/25/2023 12:06:33 Page˖ 4/4
AM
Grease: EP2: HBW:
Impluses 5.89 Kg
Outer Seal : 4910
Impulses HBW: 1737 Impluses

Screw Conveyor: 653 Impluses 1.57 Kg 8.68


Total Weight of HBW: Kg
Rotary Joint : 247 Impluses 0.49 Kg
Articulation joint : 356 Impluses 0.57 Kg
Erector Bearing: 0.06 Impluses 0.01 Kg
Erector Wheel: 0 Impluses 0 Kg

Total Weight of EP2: 35.02 Kg Total Impluses of EP2: 149 Impluses

Gas Measuring: Avg Max Min


Methane Gad(CH4) : 0 0 0

Hydrogen sulfide(H2S) : 0 0 0
Carbon Monoxide(CO): 0.1 33.1 0

Oxygen(O2): 21.5 21.9 12.6