Begin time˖ 9/15/2023 8:37:03 PM End time˖ 9/16/2023 10:50:45 AM Page˖ 1/4

Work efficiency:

Advance : 117 Min Ring Building: 433 Min Standby time: 303 Min Total : 853 Min

Cutter Wheel: Avg Max Min


Speed[rpm]: 1.4 1.5 0.2

Torque[kNm]: 1250 1716 364

Rolling[mm]: 1 6 -3

Thrust: Avg Max Min

Thrust[kN] : 12780 15040 679

Speed[mm/min] : 11 17 0

Penetration[mm/r] : 7.7 12 0

Thrust cylinder:
Avg(bar) Max(bar) Min(bar)

Group A
17 67 2
Group B
140 163 59
Group C

Group D 168 192 49

0 Avg pressure(bar)
400 50 75 12

2300

0 A B C D A B C D A B C D

Min stroke(mm) Max stroke(mm) Accumulate stroke(mm)


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 6

Begin time˖ 9/15/2023 8:37:03 PM End time˖ 9/16/2023 10:50:45 AM Page˖ 2/4

Articulation cylinder:
200 200

0 0
A B C D A B C D
Min stroke(mm) Max stroke(mm)
Avg Max Min
Contact Forcr(kN): 12705 15754 9908

Grout Injection: AVG(bar) Max(bar) Min(bar) Vol(L/Line) Total(L)


1 0.9 5.4 -0.1 7100.0 14800.0

2 0 0 0 1200.0
1# Liquid
A 3 1.2 2.4 0 1300.0
2#
4 1.4 16.8 0 5200.0
3# 0.8 2.8 0.3 400.0 870.0
1
4# 2 0.4 0.5 0.4 60.0
Liquid
B 3 0.5 0.6 0.5 70.0
0
4 1.0 3.1 0.6 70.0
Avg pressure at Ports 25
Total(A And B) 15670.0 L

Earth Pressure(Excavation Chamber): Avg(bar) Max(bar) Min(bar)


1.7 2.1 1.4
1#
1.7 2.2 1.4
2#
1.8 2.3 1.5
3#
4# 1.8 2.3 1.5
5# 1.8 2.1 1.4
6#
1.3 1.4 1.1

0 Avg pressure(bar) 6 Total:


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 6

Begin time˖ 9/15/2023 8:37:03 PM End time˖ 9/16/2023 10:50:45 AM Page˖ 3/4

Screw Conveyor: Avg Max Min


Speed[rpm]: 2 5 0

Pressure[bar]: 47 70 28
Torque[KNm]: 11 23 0

Front(Bar) Center(Bar) Rear(Bar)


Earth Pressure Sensor(AVG):

Tail skin grease:


1 2 3 4 5 6 7 8

Front 169 166 166 164 167 167 172 172

Rear 172 169 162 160 136 103 98 129

Front 1343 Impluses Total Weight: 626.74 kg

Rear 1129 Impluses Total pulses: 2472 Impluses

Foam:
Avg pressure(bar) Max pressure(bar) Min pressure(bar) Sum air(m³)Litres Sum liquid(m³)Litres

1 2.6 4.7 1.4 48.6 4.61

2 2.5 4.6 1.3 50 4.65

3 2.4 3.6 1.4 58.9 4.64

4 2 3.3 0.5 57.7 4.62

5 2.3 3.6 0.7 100.6 4.6

6 2 4.1 0.3 63.5 4.52

Foam concentrate : 320 L polymers: 0.06 L


Water : 0 L Bentonite : 6.4 L
Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 6

Begin time˖ 9/15/2023 8:37:03 PM End time˖ 9/16/2023 10:50:45 AM Page˖ 4/4

Grease: EP2: HBW:


Impluses Kg
Outer Seal : 12785
Impulses HBW: 5626 Impluses

Screw Conveyor: 1717 Impluses Kg 2813


Total Weight of HBW: Kg
Rotary Joint : 575 Impluses Kg
Articulation joint : 607 Impluses Kg
Erector Bearing: 14.73 Impluses Kg
Erector Wheel: 0 Impluses Kg

Total Weight of EP2: 42.77 Kg Total Impluses of EP2: 182 Impluses

Gas Measuring: Avg Max Min


Methane Gad(CH4) : 0 0 0

Hydrogen sulfide(H2S) : 0 0 0
Carbon Monoxide(CO): 0 0 0

Oxygen(O2): 21.5 21.6 21.4