the African Dvelopment Outfitting Work for Office Date: August, 2016
N A B C D E F G H I
1. The figures are concrete compressive
strength readings N/mm2.
2. Column readings are written on the
beams.
57 60 68 3. Beam readings are written on the
1 beams.
47 47 47 47
50 50 45 40 4. Slab readings are written on the open
spaces.
70 67 5. Circled readings are those that fall
44 70
70 below the specified concrete
69 compressive strength of 25N/mm2,
2 50 these imply problem area.
54 42 6. The contractor is responsible for
10 68
70 verification of the structural design
61 55 46 before proceeding with construction of
3 40 57
58
57 57 structural elements.
70
63 LEGEND:-
15
35 Existing beams
38 53 53 24 54 Existing beams to be demolished
61
Existing slab to be demolished
25
Existing staircase to be demolished
69 47 54 54 54 66 55
4 22 55 13 Existing column
24
63 Existing column to be demolished
36
8 Existing Slab thickness 150mm
2
For Sierra Leone Field Office of the African Plan Schmidt Drawn by: BWB
SL/ADB/ST-03
Development Bank (ADB) Hammer Result Checked by: SDD Sheet Size: A3
Drawing status: Design: Tender: Contract / Construction: Scale: 1 : 100 Printed on: August, 2016
N A B
NOTES:-
C D E F G H I 1. The figures are concrete compressive
strength readings N/mm2.
2. Column readings are written on the
beams.
1 21
18
3. Beam readings are written on the
beams.
4. Slab readings are written on the open
spaces.
5. Circled readings are those that fall
below the specified concrete
2 compressive strength of 25N/mm2,
21 these imply problem area.
17 6. The contractor is responsible for
verification of the structural design
3 20 before proceeding with construction of
structural elements.
LEGEND:-
Existing beams
Existing beams to be demolished
Existing slab to be demolished
For Sierra Leone Field Office of the African Beams Drawn by: BWB
SL/ADB/ST-04
Checked by: SDD Sheet Size: A3
Development Bank (ADB) Drawing status: Design: Tender: Contract / Construction: Scale: 1 : 100 Printed on: August, 2016
NOTES
27711
N A B C D E F G H I
C1 C1 C1 C1 C1 C1
1 C1
C2
2 C1 C1
Legend
Existing Beam Maintained
C2 New Beam
3 C2 C2
Existing Retaining Wall Maintained
New Retaining Wall
reinforced
concrete
Existing Column Footings
wall
New Column Footings and trenches
C1
Existing Columns Maintained
C1 New Columns
4 C1 C1
New Slab
A B C D E F G H I
N
Type A C1 C1 C1 C1 C1 C1 Type A C1
C1
1 duct
Type A
Type B
C1 C2 Type A
Type A C1 Type A
2 C2
Type A
Legend
Type A
Type B
Type B
Type B
Type B
C2 Existing Beam Maintained
3 C2 C2Type B C2 Type A C2 C2 Type A
C2 New Beam
Existing Retaining Wall Maintained
New Retaining Wall
Type A C2 Type A Type A
Existing Column Footings
C2 C2 C2 C2 C2 New Column Footings and trenches
Type B
Type B
Type B
Existing Columns Maintained
New Columns
A B C D E F G H I
N
Type A C1 C1 Type A C1 C1 Type A C1 C1
1 C1
duct
Type A
Type B
Type B
C1 Type A C1 Type A Type A Type A Type A C2
2
C2
Legend
Type A
Type B
Type B
Type B
Type A
Type A
Type A
Type A
Type A
Existing columns Modified
Type A
New Columns
N A B C D E F G H I
Type A
Type B
Type B
Type B
Type A
Type B Type B
C2
C1 Type A C1
2
Type A
Type B
Type B
Type B
Type A
Legend
Existing Beam Maintained
Type B Type B Type B C2 Type A New Beam
C2 C2 C2 duct
Type B
C2 C2
Type B
C2
Type B
Existing Columns Maintained
Type B
Type B
Type A
C2 New Columns
Type A
Type B
Existing Slab Maintained
4 New Slab
6Y16 06
Y10 05 4Y16 06
Y10 05
SECTION Y-Y
SECTION Y-Y
Y1602-150P B1
Y1602-150P B2
Y1204-200P T2 Y1204-200P T2
Y1601-150P B1 Y1203-200P T1
Y1601-150P B2 Y1203-200P T1
BASE C1 BASE C2
6Y16 05 4Y16 06
NGL. NGL.
Y10 05 Y10 05
150
N A B C D E F G H I
TYPE A
TYPE A
TYPE A TYPE A
TYPE B
TYPE B
3
TYPE C
TYPE F
TYPE B
TYPE D
Legend
TYPE E
TYPE E
TYPE B
Lift
TYPE B
TYPE A TYPE A
TYPE A
TYPE A
TYPE E
FIRST FLOOR
Y1202-150P
Y1201-150P
Y1208-150P
Y1204-150P
P
150
-
2 03
Y1
GROUND FLOOR
Y1206-150P Y1205-150P
Y1202-150P
50P
1
12-
Y
Y12-150P
BASEMENT FLOOR
C2 C1
Development Bank (ADB) Staircase No.1 Checked by: SDD Sheet Size: A3
Drawing status: Design: Tender: Contract / Construction: Scale: 1 : 40 Printed on: August, 2014
NOTES
Y1202-150P Y1205-150P
Y1201-150P
Y12-150P
Y1206-150P
Y1205-150P Y1203-150P
Y1204-150P
600 100
2600
200
02 02 02 02 02 02 02 02 02 02 02
02 02
300
04 04
04 04 04 04 04 04 04 04 04 04 04
y1208-150P
y1207-150P
y1206-150P
y1201-200mm T2
y1205-150P y1603-200mm B2
2500
y1207-150P
1900
y1206-150P
Lift Base
300
y1205-150P
y1206-150P
12138
J K L M N
C4 C4 C4 C4
C3 C3
Type C
Type C
Type C
2325
5075
6 C3 C3 Type C Type C C3
LEGEND:-
Type C
Type C
Type C
Type C
2225
Columns
Beams
Footing
5 Type C Type C Type C
P/C Strips
C3 C3
C4 C4 C4 C4 C4
J K L M N
12138
3263 1725 4225 2825
C4 C4 C3 C4 C3 C4
7
2325
C3
5075
C3
6 C3
LEGEND:-
2225
Columns
225
225
SECTION K-K
900 SECTION M-M
900
300
225
400
225
BEAM TYPE C
Varies
Varies
900
1200
O P Q
300 2300 300 2300 300
Type D Type D
450
8
C5 C5
C5
Type D
Type D
Type D
4000
3600
LEGEND:-
Columns
Beams
C5
Footing
P/C Strips
C5 C5
450
9
Type D Type D
O P Q
8 150 5700
4000
LEGEND:-
Columns
Floor Slab 200mm thick with
16mm rod meshed at 150mm
150
spacing C-C
9
Y16 B1
450
8
1600
4200
4000
3100
2563
LEGEND:-
Columns
Reinforcement
450
9
1350
Y16 B2 Y16 T2 Y16 T1
Y12-150P T1
Y16-200P B1 200
Y16-200P B2 Y12-150P T2
Y16 B1
4000
Y16 B2
LEGEND:-
Columns
Reinforcement
9
Y12-150P T1
Y16-200P B1 200
Y16-200P B2 Y12-150P T2
No. Description Date Architects
Project Title: Drawing Title: Realini
1.0 Description dd-mm-yyyy R B Engineers
Bader Planners
Rehabilitation / Completion and Outfitting Work for Water Tank Typical A Associates Limited 72 Wellington Street, Freetown
Office Building at Regent Road, Hill Station, Freetown First Floor and Date: August, 2016
SL/ADB/ST-24
For Sierra Leone Field Office of the African Suspended Slab Drawn by: BWB
Checked by: SDD Sheet Size: A3
Development Bank (ADB) Details Drawing status: Design: Tender: Contract / Construction: Scale: 1 : 100 Printed on: August, 2016
NOTES:-
6Y16 06
Y10 05
SECTION Y-Y
Y1602-150P B2
Y1204-200P T2
Y1601-150P B1 Y1203-200P T1
BASE C5
6Y16 05
NGL.
Y10 05
COLUMN TYPE C5
R S T U
8600
Type F
Type F
Type F
Type F
LEGEND:-
Columns
Beams
Footing
C6 C6 C6 C6
P/C Strips
11 Type F Type F Type F
R S T U
8600
10
C6 C6 C6 C6
4450
LEGEND:-
Columns
Floor Slab 150mm thick with
12mm rod meshed at 150mm
spacing C-C
C6 C6 C6 C6
11
300
SECTION K-K
900
300 300 300
300
300
300
BEAM TYPE F
Varies
900
COLUMN TYPE C6
C7 C7
Type G
C7 C7
Type G
Type G
1550
C7 C7 C7 C7
LEGEND:-
Columns
Beams
Footing
P/C Strips
Floor Slab 100mm thick with
16mm rod meshed at 150mm
spacing C-C
Y16-200P B1 100
Y16-200P B2
No. Description Date Architects
Project Title: Drawing Title: Realini
1.0 Description dd-mm-yyyy R B Engineers
Rehabilitation / Completion and Outfitting Work for Back Security Post A
Bader Planners
Associates Limited 72 Wellington Street, Freetown
Office Building at Regent Road, Hill Station, Freetown Foundation Structural Date: August, 2016
For Sierra Leone Field Office of the African Layout,Ground Floor Drawn by: BWB
SL/ADB/ST-29
Slab & Suspended Checked by: SDD Sheet Size: A3
Development Bank (ADB)
Slab Details Drawing status: Design: Tender: Contract / Construction: Scale: Not To Scale Printed on: August, 2016
NOTES:-
200
200
SECTION K-K
800
300 200 300
200
200
200
BEAM TYPE G
Varies
800
COLUMN TYPE C7
No. Description Date Architects
Project Title: Drawing Title: Realini
1.0 Description dd-mm-yyyy R B Engineers
Bader Planners
Rehabilitation / Completion and Outfitting Work for A Associates Limited 72 Wellington Street, Freetown
Office Building at Regent Road, Hill Station, Freetown Back Security Post Date: August, 2016
For Sierra Leone Field Office of the African Structural Details Drawn by: BWB
SL/ADB/ST-30
Checked by: SDD Sheet Size: A3
Development Bank (ADB) Drawing status: Design: Tender: Contract / Construction: Scale: Not To Scale Printed on: August, 2016
NOTES:-
2000
1500
Y16-200P T1
Y16-200P T2
300
Y16-200P B1
Y16-200P B2
Number Number
t)
t)
s(
s(
)
)
R
R
)
ON
ON
(m
(m
(m
(m
as
MMETE
as
MMETE
BAR BAR
t
TI
TI
Symbol (m) Symbol (m)
en
en
tal
tal
lm
lm
th
th
ts
ts
CA
CA
AM
AM
en
ng
en
ng
MARK MARK
m
bto
bto
ta
ta
ele
ele
LO
LO
m
m
Le
Le
DI
DI
Total Total
To
To
Su
Su
ele
ele
e
e
th
th
of
of
in
in
2000 1500
02 12 4.783 3283 0.133
BUTTOM 10 2 28 133.924
01 BUTTOM 12 10 3 30 7.389 221.67 3589 0.230
1800
1750 1500
02 12 14 2 28 2.000 56.00 125 125 0.266 03 BUTTOM 12 10 1 10 2.100 21.000 600 0.021
2000
03 TOP 12 10 1 10 2.450 24.50 0.024 1500
04 TOP 12 10 1 10 2.100 600 0.024
450 21.000
2000
BUTTOM 10 10 2.600 26.00 600 0.01 450
P
05 12 1 10.25
TO
50 10 0.010
M
06 10 1 1.025
125
O
450
TT
BU
3250
06 12 10 1 10 2000 0.01
TOP 2.600 26.00 600 3280
07 BUTTOM 12 10 1 10 8.030 80.300 0.080
1500
2000
07 TOP 12 10 1 10 2.600 600 0.01
26.00
450
P
50 1 50 26.00
TO
2.600 125
M
08 10 450 0.01
O
TT
BU
Number
(t)
)
R
)
ON
ss
(m
(m
MMETE
ma
BAR
t
TI
Symbol (m)
en
tal
th
s
CA
t
AM
en
ng
m
MARK
bto
tal
ele
LO
Le
DI
Total
To
Su
ele
e
th
of
in
2975
200
01 TOP 12 80 1 80 3.4 269 1.216
200
80 80 269
Number
(t)
)
R
)
ON
(m
s
(m
as
MMETE
BAR
200
t
TI
3.4 Symbol (m)
en
tal
m
80 80
th
0.678
ts
03 BOTTOM 16 1 269
CA
AM
en
ng
MARK
bto
tal
ele
LO
Le
DI
Total
To
2975
Su
ele
e
th
of
in
200
04 BOTTOM 16 80 1 80 3.4 269 0.678
05 Front 12 136 1 136 9 507.3 9 1.216
2975
2250
200
LIFT SHAFT BASE
07 Front 12 68 1 68 5.2 348.8 0.678
BENDING DETAILS 2250
Number
(t)
m)
R
)
ON
2250
ss
(m
MM ETE
200
al (
ma
BAR
t
TI
Symbol (m)
en
th
5.13 0.678
ts
08 Back
tot
AM
en
ng
MARK
m
2250
tal
ele
LO
b
Le
DI
Total
To
Su
ele
e
th
of
in
2475
125
2475
02 BUTTOM 12 34 1 34 2.73 93 0.266
125
RS
100
BA
10 100
03 10 4 1 4 0.5 2 0 0.01
10
ER
AC
0
SP
Water tank Mezzanine Floor Slab Roof Slab & Parapet Water Tank
BENDING DETAILS BENDING DETAILS
Number Number
t)
t)
(
(
)
)
R
R
)
)
N
N
(m
ss
(m
ss
(m
(m
MMETE
MMETE
O
O
ma
ma
BAR BAR
t
TI
TI
Symbol (m) Symbol (m)
en
en
tal
tal
th
th
ts
ts
CA
CA
AM
AM
ng
ng
en
en
m
m
MARK MARK
bt o
bt o
tal
tal
ele
ele
LO
LO
m
m
Le
Le
DI
DI
Total Total
To
To
Su
Su
ele
ele
e
e
th
th
of
of
in
in
2650 5300
150
150
TOP 27 1 27 2.950 71.50 0.071 01 TOP 27 1 27 5.600 151.20 0.150
150
150
12 12
150
150
150
150
BOTTOM 16 27 1 27 2.950 71.50 0.071 02 BOTTOM 16 35 1 35 4.200 147.00 0.140
2650 3900
3900
TOP 12 19 1 19 4.200 79.80 0.079
150
150
150
150
BOTTOM 16 19 1 19 4.200 79.80 0.079 Roof Slab & Parapet Water Tank
3900 BENDING DETAILS
Number
(t)
2688
)
R
)
ON
ss
(m
(m
MMETE
TOP 12 1 13
150
ma
13 37.70 150 0.037 BAR
t
2.988
TI
Symbol (m)
en
tal
th
ts
CA
AM
en
ng
m
MARK
bto
tal
ele
LO
Le
DI
Total
To
Su
ele
e
th
of
in
150
150
150
150
M
TO
2688 01 16 35 1 27 5.600 151.20 0.150
O
TT
BO
1775
150
150
13
P
TOP 12 1
150
150
TO
02 O 16 35 1 35 4.200 147.00 0.140
TT
BO 3900
AL AL
T
RT ZO ET
N
500
IC NT
VE RI AP
O
150
FR
150
HOPAR
BOTTOM 16 18
K
18 1 2.075 37.35 0.037
C
BA
2000
1775