BENEFITS
DELIVERY ASSURED
CHALLENGE SOLUTION SUMMARY
We were contracted by our customer to carry • Once offshore our inspection team liaised services procedures and in accordance • Supply of LEEA qualified
out a six-monthly lifting equipment survey on with the client responsible persons on board with the customer’s operating procedures, lifting equipment examiner
board their platform. The lifting equipment to discuss the work scope and any ongoing standards and industry best practice • Supply of IRATA qualified
survey was carried out in accordance with operations that could interfere with the • Throughout the trip all responsible persons rope access level 3
the Lifting Operations and Lifting Equipment survey on board were issued with daily summary • Equipment utilised included:
Regulations 1998 SI No 2307 (LOLER) and • The team made themselves familiar with the reports highlighting the day’s work activities –– Rope access kits
the Provisions and Use of Work Equipment entire platform to gain knowledge of work and the following day’s work plan. Where –– Non-Destructive Testing
Regulations 1998 SI No 2306 (PUWER). locations, timescale and scope, giving the applicable, a defect list was attached to the (NDT) consumables
customer the chance to highlight expected summary report –– NDT equipment
Failures in lifting equipment can result in issues in certain areas • The daily summary reports and defect lists –– Jacking kit
significant or fatal injuries and consequently • Permits were raised as per customer submitted provided us with the opportunity –– Load cell
health and safety law places a number of procedures in advance of any work being to discuss any issues which had been –– NDT consumables
specific obligations on those providing, carried out recorded at the time of examination, e.g.
controlling and using lifting equipment to • Certification for the equipment to be defects, observations and certification issues
properly manage these risks. These checks are examined was located and assessed • The survey identified a small number of
necessary to verify that the lifting equipment (e.g. original as-build drawings, reports items that required upgrade and removal,
can continue to be safely used and to detect of thorough examination, declarations e.g corroded beam trolleys, but in general
and remedy any deterioration in good time. of conformity, etc). During the survey the lifting equipment itself was found to be
our inspectors were working to and in requiring fabric maintenance only.
accordance with the latest suite of inspection
1. 2.
1.
Rigging loft after inspection