You are on page 1of 5

Mechatronics Level-IV- version -3-

Part -I-CHOOSE THE CORRECT ANSWER


1. A group of physical component combined to perform a specific function. (UC5)
A) Pressure B) System C) Actuator D) Stability
2. Pictorial representation of the cause and effect relationship between the input and output of a physical system.
(UC4)
A, Block diagram B, Circuit diagram C, Valve D, Filter
3. Supplies air to the pressure vessel through a pipe line and resistance to flow is provided by a constriction.
(UC5,9)
A, Hydraulic power system B, Electromechanical system C, Pneumatic system D, Transfer function
4. Electrical maintenance. (UC13)
A) Is safe to use unforeseen circumstances B) Is illuminated and heated to an appropriate level
C) Ensures the efficiency of the installed system D) Provides safe monitoring of industrial processes and systems
5. A group of components which can complete certain tasks or achieve certain desired results in a desired manner
while working together is called as_____.(UC5,11)
A, Output system B, Sequence system C, Control system D, Succession system
6. A “competent” worker is one who: (UC17)
A, Cannot do the job or task B, Has been trained to do a job or task successfully C, Can do the job or
task more quickly than anyone else D, Is quarrelsome and likely to cause an argument at work
7. An appropriate performance indicator that a small business might use to evaluate its level of social responsibility
is.(UC18)
A. Results of a customer satisfaction survey B. Profit C. Rate of greenhouse gas emissions generated over a
period of time D, Staff turnover
8. On-off control is also called as (UC5)
A, One position control B, Two position control C, Four position control D, Half position control
9. In which stage the measurement system comes in contact with the measured or the quantity to be
measured? (UC10,12)
A) Transducer stage B) Signal processor stage C) Output stage D) Production stage
10. A cyclical process that involves data gathering, interpretation and identification of the problem areas and possible
acting programs.(UC7,18)
A) Benchmarking B) Asset C) Profit D) Diagnosis
11. The transformation of a set of input, which may be material, actions, methods and operations into desired outputs
in the form of a product.(UC8)
A) Control B) Process C) Automation D) Sensor
12. The term given to programs stored in ROMs or in programmable devices which permanently keep their stored
information. (UC5)
A) Hardware B) Software C) Firmware D) Universal serial bus
13. Deciding now what we are going to later including when and how we are going to do it.(UC1,UC4)
A) Planning B) Activity C) Monitoring D) Evaluation
14. Which one is displacement measurement sensor? (UC4, UC10)
A) Resistive sensor B) Light sensor C) Temperature sensor D) Light emitting diode
15. What is the input of the data acquisition system (DAS) to which a transducer is connected called? (UC4)
A) Control element B) Interface C) Channel D) Function
16. The signal produced by changing the air pressure in the signal pipe in proportion to the measured change in a
process variable. (UC9)
A) Digital signals B) Analog signals C) Resistive temperature device D) Pneumatic signal
17. Which one is a passive sensor? (UC4)
A) Thermocouple B) Thermister C) Strain gauge D) Silicon
18. The region between the limits within which a quantity is measured, received or transmitted, expressed by stating
the lower and upper range values is____.(UC5,UC10)

P.by: - TSEGAYE ALEMU


A) Instrument range B) Calibration range C) Zero error D) Field
standard
19. The main objectives of maintenance are (UC2)
A) To obtain plants and equipments at its minimum operating efficiency B) To safeguard instruments by
minimizing rate of deterioration C)Help in implementation of wrong procedures for storage and consumption
of spares D)To hinder management in taking decisions on replacements or new investment
20. The main advantages of closed-loop control system (UC11)
A) Reduced sensitivity to disturbance B) Complex and expensive to construct
C) The loss of gain D) Quiet easy to become unstable
21. Team commitment and cooperation is developed through (UC15,16)
A) Poor communication and effective decision making B) Fostering mutual concern and camaraderie
between team members C) Fostering bad feeling between team members D) Dissatisfied
communication and ineffectual decision making

Part II. Matching A and B


Column B
Column A A. Central heating boiler controlled only by a timer
____1. Controller (UC4) B. The lower end of the range
____2. Disturbance (UC11) C. Declaration of a desired end state
____3. Feedback (UC2) D. Reconciles disagreements and relieves tensions
____4. Goal (UC1) E. Device that measures a variable condition
____5. Tolerance (UC5, 10) F. Period of time of use to ensure the equipment remains
____6. Zero value (UC10) reliable
____7. Harmonizing (UC16)
G. Signal that tends to adversely affect the valve of the output of a system
____8. Open-loop control system
(UC11) H. Error in measurement
____9. Silencer (UC4) I. The output of a system that is returned to modify the input
____10. Damper (UC11) J. Permissible deviation from a specified value
____11. Uncertainty (UC10) K. Automatic water level controller
____12. Calibration interval (UC10) L. Device used to control the flow of fluids such as
Steam or water
____13. Control valve (UC9)
M. Rectifier
____14. Water separator automatic
drain N. Device used to control the flow of air in a duct or through a
(UC9) wall louver.
____15. Closed-loop system (UC11) O. Voltage multiplier

P.

Q.

R.

2
P.by: - TSEGAYE ALEMU
Mechatronics Level-IV- version -3-
Answers key
Part -II-Matching A and B
1. E 2. G 3. I 4. C 5. J 6. B 7. D 8. A 9. P 10. N 11. H 12. F 13. L 14. R 15. K
Part -I-CHOOSE THE CORRECTANSWER
1. B
2. A
3. C
4. C
5. C
6. B
7. C
8. B
9. A
10. D
11. B
12. C
13. A
14. A
15. C
16. D
17. A
18. B
19. B
20. A
21. B

P.by: - TSEGAYE ALEMU


3

Mechatronics Level-IV- version -3-

P.by: - TSEGAYE ALEMU


4

P.by: - TSEGAYE ALEMU

You might also like