You are on page 1of 1

SPECIAL CONDITIONS

NAME OF WORK: OFFSHORE PIPELINE LAYING WORKS OF CONTRACT REV 0

BIDDING DOCUMENT NO.: SM/B795-000-MK-T-9510/1004 Sheet 20 of 35


1.1.

e) Commissioning
27.1.2 EIL appointed CONTRACTOR may further sub-contract construction work, to the
Contractor(s) having prior proven experience of similar WORK and on specific
approval by EIL/OWNER after award of WORK.
27.1.3 Following the notification of Acceptance of Bid, the CONTRACTOR will submit to the
RCM/EIC for approval the details of further Contractors as per Annexure- XIII to
SCC. CONTRACTOR shall ensure that competent and resourceful agencies with
proven track record and performance should be proposed for the work to be sub-
contracted.
27.1.4 The list of further construction Contractors proposed in the Bids by the Bidders shall
be considered as indicative only. However, this shall not apply to the Contractors
whose experience has been considered for qualification, wherever permitted, as per
the Notice for Invitation for Bids (IFB).
27.1.5 The CONTRACTOR shall deploy all manpower relating to works at site, i.e., Project
Manager, Quality Control Engineers for various disciplines, Planning Engineers and
Front Line supervisors for Civil, Mechanical, Piping, Electrical and Instrumentation
works, as applicable from his Organization. Sub-contracting of above manpower
requirement shall not be permitted under any circumstances.
27.1.6 Bidder shall meet the requirement regarding deployment of Key construction
manpower as specified in the bidding document as per Annexure - IV to SCC. Bidder
shall also submit their compliance for deployment of manpower along with the bid.
Qualification and Experience of key construction personnel shall be as per
Annexure-V to SCC.

28.0 INSURANCE:
28.1 Contractor will arrange Comprehensive Insurance Policy covering marine, Inland
Transit Insurance (in India) and Site Erection/Storage Insurance.

28.2 Further, Bidder shall carry and maintain any and all other Statutory Insurance(s)
required under Indian Laws and Regulations, including Workmen Compensation Act /
Employee State Insurance / Third Party Liabilities, etc. and Insurances for their
personnel & machineries engaged in performance of the work at Contractor’s own
cost. All insurances of material pertaining to the scope under such contract(s) shall be
in the scope of the contractor till permanent incorporation in the work. Irrespective of
work acceptance, the responsibility to maintain adequate insurance coverage at all
times during the period of Contract shall be that of Contractor alone. Contractor’s
failure in this regard shall not relieve /absolve them him of any of his responsibilities
and obligations under the contract.

29.0 EXTENDED STAY COMPENSATION


Not Applicable

30.0 GENERAL REQUIREMENTS FOR RADIOGRAPHY & OTHER NDT


30.1 CONTRACTOR shall appoint radiography/ NDT agency (ies) only after acceptance of
such agency(ies) by OWNER/EIL. However, acceptance of radiography/ NDT agency
by OWNER/EIL shall not absolve the CONTRACTOR of his responsibility to execute
radiography work as per requirements of the Contract.
Engineers India Limited
New Delhi

Page 206 of 1281