Rational Hydrologic Analysis
HYDRAULIC ANALYSIS
USING RATIONAL METHOD
PROJECT : CONSTRUCTION OF BY-PASS AND DIVERSION
ZAMBOANGA CITY BY-PASS ROAD PACKAGE 6
SLOPE, S = 0.08549
Tc = (L1.15) / 51*H0.385
= (5965.67)1.15 / 51*(510.01)0.385
Tc = 39.09 min.
I = 94.45 mm/hr
Q = C I A / 3.60
using C = 0.60
= 0.60*94.45*6.69 / 3.60
HYDRAULIC ANALYSIS
USING RATIONAL METHOD
PROJECT : CONSTRUCTION OF BY-PASS AND DIVERSION
ZAMBOANGA CITY BY-PASS ROAD PACKAGE 6
SLOPE, S = 0.08549
Tc = (L1.15) / 51*H0.385
= (5965.67)1.15 / 51*(510.01)0.385
Tc = 39.09 min.
I = 99.68 mm/hr
Q = C I A / 3.60
using C = 0.60
= 0.60*99.68*6.69 / 3.60