You are on page 1of 2

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
REGION IX, ZAMBOANGA CITY

HYDRAULIC ANALYSIS
USING RATIONAL METHOD
PROJECT : CONSTRUCTION OF BY-PASS AND DIVERSION
ZAMBOANGA CITY BY-PASS ROAD PACKAGE 6

LOCATION : ZAMBOANGA CITY

I. PHYSIOGRAPHIC DATA OF BASIN :

DRAINAGE AREA, D.A. = 6.69 sq. km.

LENGTH OF STREAM, L = 5.97 km.

DIFFERENCE IN ELEVATION, H = 510.01 m.

SLOPE, S = 0.08549

II. DETERMINATION OF TIME OF CONCENTRATION, Tc

Tc = (L1.15) / 51*H0.385

= (5965.67)1.15 / 51*(510.01)0.385

Tc = 39.09 min.

III. DETERMINATION OF RAINFALL INTENSITY BY RATIONAL METHOD


FOR 50 YEARS RETURN PERIOD ( LABANGAN )

I = 2405.51/ (t0.81 +5.99)

= 2405.51 / (39.09.81 + 5.99)

I = 94.45 mm/hr

IV. COMPUTATION OF DESIGN DISCHARGE, Q

Q = C I A / 3.60

using C = 0.60

= 0.60*94.45*6.69 / 3.60

Q = 105.34 cu.m. / sec. x 1.10

Q = 115.87477 cu.m. / sec. SAY = 116.00 cu. m/ sec


REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
REGION IX, ZAMBOANGA CITY

HYDRAULIC ANALYSIS
USING RATIONAL METHOD
PROJECT : CONSTRUCTION OF BY-PASS AND DIVERSION
ZAMBOANGA CITY BY-PASS ROAD PACKAGE 6

LOCATION : ZAMBOANGA CITY

I. PHYSIOGRAPHIC DATA OF BASIN :

DRAINAGE AREA, D.A. = 6.69 sq. km.

LENGTH OF STREAM, L = 5.97 km.

DIFFERENCE IN ELEVATION, H = 510.01 m.

SLOPE, S = 0.08549

II. DETERMINATION OF TIME OF CONCENTRATION, Tc

Tc = (L1.15) / 51*H0.385

= (5965.67)1.15 / 51*(510.01)0.385

Tc = 39.09 min.

III. DETERMINATION OF RAINFALL INTENSITY BY RATIONAL METHOD


FOR 100 YEARS RETURN PERIOD ( LABANGAN )

I = 2494.17/ (t0.81 +5.55)

= 2494.71 / (39.09.81 + 5.55)

I = 99.68 mm/hr

IV. COMPUTATION OF DESIGN DISCHARGE, Q

Q = C I A / 3.60

using C = 0.60

= 0.60*99.68*6.69 / 3.60

Q = 111.17 cu.m. / sec. x 1.10

Q = 122.28427 cu.m. / sec. SAY = 122.00 cu. m/ sec

You might also like