Professional Documents
Culture Documents
CiMAX Design IoN 27 July 2023 Rev 2
CiMAX Design IoN 27 July 2023 Rev 2
2 DEMO -206501 CE - 116 MRI Infrastructure & Design for Selected Models 06 Apr 23 A 06 Apr 23 A 2
4 DEMO -206502 Issue of MEP Design Parameters and Initial Findings 10 May 23 A 10 May 23 A 4
Review and Acceptance of Design Parameters by Employer
5 DEMO -206503
(and Siemens)
10 May 23 A 1w 16 May 23 A 5
16 DEMO -206571 Employer Review and Acceptanceof Stage 4 Design 12 Jul 23 A 2w 7h 26 Jul 23 16
18 DEMO -206780 Price & Proceed Stage 5 design ( New instruction) 19 Jul 23 19 Jul 23 18
24 DEMO -206740 Employer Instruction to Proceed with installation works 14 Sep 23 14 Sep 23 24
ISG PLC, 33 Aldgate House, Aldgate High Street, London, EC3N 1AG Prog No. BEMP-ISG-SW-XX-PR-W-00-0008
Tel. 020 7247 1717 Fax. 020 7247 8656 Issue date : 27/07/2023
Comments : CiMAX
Planner: VK Revision No. P34
Drawing ref : C:\Users\vkaushik\ISG Ltd\UK Construction - London Planning - Documents\05. Live Projects\IoN Plot 1\1. Contract Programme\4. PFA What-if\Cimax Whatif\PFA P34 with stage 5.pp Page 1 of 1 Revision date : 14/07/2023