LIST OF WORKS DONE

ARCEDGES BUILDING INDIA LLP


MANUFACTURER OF HIGH QUALITY PRE-ENGINEERED BUILDING
4, 5, 6 & 16, SABAR INDUSTRIAL ESTATE, OPP. ASOPALAV HOTEL, NR. SHAMLAJI,
ASAL DIST. - ARAVALLI - 383250
www.arcedges.com
TONNAGE LENGTH WIDTH EAVE HEIGHT
AREA
SR. NO. JOB CODE JOB NAME LOCATION (MT) PO DATE (mtr) (mtr) (mtr) STATUS
(sqmt)

1 SHAMALIYA FOOD COURT SHAMLAJI 2000 60 07‐03‐2017 75.68 25.1 3.91 Completed

2 J17‐021‐001 MUKESHJI NADIAD 615.9349 23.59 26.11 10.02 Completed

3 J17‐021‐002 IBIS MORBI MORBI 6298.88 533 18‐08‐2017 121.6 51.8 17.9 Completed
AHEMEDABA
4 J17‐021‐003 SWATI SWITCH GEAR 917.9742 42 08‐07‐2017 55.77 16.46 9.82 Completed
D
5 J17‐021‐005 SURFICA INDIA LTD HMT 7481.25 320 29‐08‐2019 112.5 66.5 8.16 Completed
AHEMEDABA
6 J17‐021‐007 G+1M&M 309.8264 32.24 9.61 6.57 Completed
D
7 COMP AIR VADODARA 2757.18 133 21‐09‐2017 70 42.71 11 Completed

8 J17‐021‐008 ADVENT ENVIROCARE JAIPUR 1546.49 06‐10‐2017 51.68 39.03 6.59 Completed

52.06 16.11 6.74


50.00 16.11 6.65
SAMARTH CAMPUS  BLOCK‐A BLOCK ‐ B     
52.00 32.00 7.05
9 J17‐021‐009 BLOCK ‐ C KAPADWANJ 142 16‐11‐2017 Completed
41.19 32.00 7.05
BLOCK ‐ D           BLOCK ‐ E BLOCK ‐ F
21.36 14.89 8.28
54.24 12.00 7.80

10 J17‐021‐010 VINODBHAI GAJJAR MEHESANA 675 30 22.5 10.9 Completed

11 J17‐021‐011 SOMTECH CONCAST 1200 70 16‐11‐2017 60 20 11.17 Completed

12 J17‐021‐012 AJAY AUTO AGENCY UGANDA 1700.4 94 04‐12‐2017 72.34 27.67 11.67 Completed

29 24.5
29 24.5
GANI UNCLE
13 J17‐021‐013 HMT 114 19‐02‐2018 29 24.5 8.35 Completed
B1 B2 B3 B4 B5
35 24.0
39 24.0

UGANDA G DAS B1 120 60.00 9.35


1 J18 ‐ 021 ‐ 001 UGANDA 325 23‐10‐2017 Completed
B2 60 19.65 10.45

2 J18 ‐ 021 ‐ 002 HALIFLEX GAMBHOI 2955.45 91 01‐08‐2018 91.5 32.3 11.9 Completed

3 J18 ‐ 021 ‐ 003 MASCOT INFRA. GKN KADI 2880 68 01‐02‐2018 60 48 8.3 Completed

4 J18 ‐ 021 ‐ 004 BMD PVT. LTD HATHROL 12000 550 27‐02‐2018 Completed

6 J18 ‐ 021 ‐ 006 MASCOT INFRA. EXTENSION KADI 4775.7168 40 01‐02‐2018 77.92 61.29 9 Completed

7 J18 ‐ 021 ‐ 007 MIRAJ BHILODA 627.2122 25 02‐04‐2018 40.57 15.46 7 Completed

8 J18 ‐ 021 ‐ 008 SURFICA RESIN PLANT HIMATNAGAR 8621.8 320 29‐08‐2017 Completed

9 J18 ‐ 021 ‐ 009 SIDHDHIVINAYAK ENGINEERS VISNAGAR 1160.1872 64 25‐04‐2018 52.88 21.94 9.02 Completed

11 J18 ‐ 021 ‐ 011 JK POLYMERS MEHSANA 2891.4864 71 11‐05‐2018 60.72 47.62 7.3 Completed

12 J18 ‐ 021 ‐ 012 AUROMEERA UGANDA 3300 99 15‐06‐2018 66 50 6.8 Completed

15 J18 ‐ 021 ‐ 015 P. D. BEARINGS SANAND 4339.4244 201 31‐07‐2018 64.06 67.74 8.97 Completed

16 J18 ‐ 021 ‐ 016 SCL SANAND 35 14‐08‐2018 Completed

17 J18 ‐ 021 ‐ 017 KNACK PACKAGING BORISANA 7823.016 277 28‐08‐2018 109.26 71.6 7.9 Completed

18 J18 ‐ 021 ‐ 018 PARTH INDUSTRIAL ESTATE KADI 4680 100 120 39 6.85 Completed

20 J18 ‐ 021 ‐ 020 B. M. PATEL MEHSANA 2229.3072 65 60.96 36.57 7 Completed

21 J18 ‐ 021 ‐ 021 MAKKERS VALSAD 3493.0274 105 75.82 46.07 8.25 Completed


22 J18 ‐ 021 ‐ 022 FILMTEC VAPI 4041.52 230 29‐10‐2018 72.17 56 13.35 Completed

24 J18 ‐ 021 ‐ 024 NITIN SPINNERS BEGUN 22893.3 965 02‐11‐2018 274.5 83.4 9.95 Completed

25 J18 ‐ 021 ‐ 025 JAI GRANITE HIMATNAGAR 1605.0516 54 28‐09‐2018 51.51 31.16 7.74 Completed

26 J18 ‐ 021 ‐ 026 CONCEPT HYGINE ASLALI 2622.72 64 21‐11‐2018 54.64 48 5.15 Completed

27 J18 ‐ 021 ‐ 027 FABRIMETAL SENEGAL 9563.52 443 29‐11‐2018 64 149.43 11.98 Completed

28 J18 ‐ 021 ‐ 028 SMCC SUZUKI BECHRAJI 577.8 20 10‐12‐2018 32.1 18 Completed

29 J18 ‐ 021 ‐ 029 AMBICA ALLOYS MAJRA 880.74 54 12‐12‐2018 54 16.31 9.8 Completed

30 J18 ‐ 021 ‐ 030 YOGI CORPORATION NAVA GAAM 1934.8472 54 28‐09‐2018 37.18 52.04 6.75 Completed

MORGANITE CRUCIBLE (INDIA) LTD WALUJ,  135.9 32 10.1


31 J18 ‐ 021 ‐ 031 B1 AURANGABA 250 21‐12‐2018 78.28 83.83 8.4 Completed
B2 & B4 B3 D 42.45 9.50 8.25

32 J18 ‐ 021 ‐ 032 KP OTTA EXTENSION BORISANA 673.4142 25 60.18 11.19 6.98 Completed

33 J18 ‐ 021 ‐ 033 ZYDUS CADILA MORAIYA 1420.3539 110 60.21 23.59 14 Completed

36 J19 ‐ 021 ‐ 001 KAUTEX TEXTRON DASLANA 1805.65 241 17‐01‐2019 53.9 33.5 13.09 Completed

37 J19 ‐ 021 ‐ 002 SCL SANAND 224.7 25 25‐01‐2019 21 10.7 Completed

38 J19 ‐ 021 ‐ 003 SHACHI ENGINEERING DAHEJ 3574.6087 290 08‐02‐2019 85.13 41.99 10.18 Completed

39 J19 ‐ 021 ‐ 004 B. R. CORPORATION HIMATNAGAR 4620.6 145 20‐04‐2019 102.68 45 8.2 Completed

40 J19 ‐ 021 ‐ 005 CONCOR 3106.3829 170 120.73 25.73 7.46 Completed

41 J19 ‐ 021 ‐ 006 JPC AIR DAHEGAM 2327.44 110 11‐03‐2019 49.52 47 9.6 Completed

42 J19 ‐ 021 ‐ 007 NITIN SPINNERS EXTENSION BEGUN 135.9 6 30.2 4.5 7.46 Completed

43 J19 ‐ 021 ‐ 008 NITIN SPINNERS STORE BUILDING BEGUN 2304 90 30‐03‐2019 64 36 9.75 Completed

44 J19 ‐ 021 ‐ 009 FABRIMENTAL GANA GHANA 1400 90 30‐03‐2019 70 20 7.75 Completed

45 J19 ‐ 021 ‐ 010 AMBICA EXT. TALOD 880.74 8 54 16.31 7.26 Completed

46 J19 ‐ 021 ‐ 011 JNS INSTRUMENT BHAGAPURA 6000 290 10‐05‐2019 80 75 12.8 Completed

47 J19 ‐ 021 ‐ 012 VARDHMAN STAMPING MEHESANA 464.058 80 44.45 10.44 12.78 Completed

48 J19 ‐ 021 ‐ 013 PAINT BUILDING GANA GHANA 5220.2794 253 102.62 50.87 6.2 Completed

49 J19 ‐ 021 ‐ 014 GANA STEEL BUILDING GHANA 7255.9604 275 176.63 41.08 9.3 Completed

50 J19 ‐ 021 ‐ 015 SA LOGISTICS BECHARAJI 5209.68 157 05‐04‐2019 88.6 58.8 9.75 Completed
AHEMEDABA
51 J19 ‐ 021 ‐ 016 LUBI PUMPS 293.538 16 36.15 8.12 5.35 Completed
D
52 J19 ‐ 021 ‐ 017 TRL KROSAKI ODISHA 4275.0864 190 07‐05‐2019 72.41 59.04 16.87 Completed

53 J19 ‐ 021 ‐ 018 VENUS EQUIPMENTS MEHESANA 816 410 10‐03‐2019 136 60 12.12 Completed

54 J19 ‐ 021 ‐ 019 MAKKERS EXETENTION VALSAD 5084.4892 35 20‐06‐2019 75.82 67.06 6.75 Completed

55 J19 ‐ 021 ‐ 020 FILMTECH BUIDING‐2 VAPI 5400 350 120 45 10.4 Completed

56 J19 ‐ 021 ‐ 021 MASCOT TOKAI KADI 9705.6375 245 07‐05‐2019 115.75 83.85 8.73 Completed

NITIN SMALL BUILDING B1 12.69 9.84


57 J19 ‐ 021 ‐ 022 BEGUN Completed
B2 9.37 5.23

MASCOT CMR B1 199.03 68.55 10.05


58 J19 ‐ 021 ‐ 023 KADI 695 07‐05‐2019 Completed
B2 127.19 64.20 10.05

59 J19 ‐ 021 ‐ 024 RADHY IMPAX AHMEDABAD 2016.1284 82 48.36 41.69 6.81 Completed

60 J19 ‐ 021 ‐ 025 NITIN SPINNERS RO PLANT BEGUN 19‐05‐2019 Completed

61 J19 ‐ 021 ‐ 026 DHARAM AGRAWAL AHMEDABAD 4068.4236 125 93.57 43.48 11.2 Completed


AHEMEDABA
62 J19 ‐ 021 ‐ 027 MANGALAM WARE HOUSE 7051.8875 240 07‐06‐2019 145.25 48.55 9.02 Completed
D
63 J19 ‐ 021 ‐ 028 TOKITA SEEDS ‐ SHIMIZU BANGLORE 675.5675 11‐06‐2019 35.65 18.95 9.8 Completed
64 J19 ‐ 021 ‐ 029 HONDA ‐ SHIMIZU VITHLAPUR 25‐06‐2019 Completed
AHEMEDABA
65 J19 ‐ 021 ‐ 030 LUBI EXT. 91.224 6 16.29 5.6 Completed
D
66 J19‐021‐034 FAMECO STORE BUILDING CONGO 600.000 116 28‐09‐2019 40.00 15.0 11.9 Completed

67 J19‐021‐035 TIRUPATI COLD STORAGE RANASAN 3844.200 100 73.19 52.5 7.2m B.W + 1.65m Completed

68 J19‐021‐036 NILKANTH AGROTECH RANASAN 4379.560 108 09‐10‐2019 103.00 42.5 7.2m B.W + 1.65m Completed

69 J19‐021‐037 IINDIAN MINERAL COMPANY HUBBLI 7056.630 378 144.90 48.7 10.5 Under progress

70 J19‐021‐038 JEKAY INTERNATIONAL LTD RAIPUR 2800.000 114 02‐11‐2019 70.00 40.0 10.0 Under progress
PRAKASH DHOKA - B1
BHIWANDI 3365.824 113 25‐11‐2019 75.13 44.8 8.4 Under progress
PRAKASH DHOKA - B2
71 J19‐021‐039
13121.010 470 123.90 105.9 13.0 Under progress

72 J19‐021‐040 PRAKASH CONSTRUCTION SANAND 1335.623 32 34.90 38.3 10.6 & 4.6 Completed


EXCEL SOURCE INDIA LIMITED / GANDHIDHA
73 J19‐021‐041 175.700 390+150 25.10 7.0 45.0 Under progress
CARGILL M
74 J20‐021‐001 SATYENDRA PACKAGING SUDAN 6930.000 330 03‐01‐2020 90.00 77.0 9.5 Completed

75 MG MOTORS - SUPPLIER WAREHOUSE HALOL 1350.000 64.3/90 54.00 25.0 7.7 & 6.0 Under progress
J20‐021‐002
76 MG MOTORS - BUFFER AREA HALOL 765.000 50/90 45.00 17.0 8.3 & 7 Under progress

77 J20‐021‐003 XCELON INDISTRIES KANCHADANI 2027.400 54 65.40 31.0 8.3 Under progress

78 J20‐021‐005 SUN PHARMA BASKA 1298.288 90 42.40 30.6 7m B.W + 7m Under progress

79 J20‐021‐007 FIELD FRESH FOODS LUDIANA 3899.766 280 78.23 49.9 8.5 Under progress

80 J20‐021‐009 MG MOTORS - INTERNAL WAREHOUSE HALOL 7661.150 410 140.52 54.5 8.0 Under progress

COST OF LENGT WIDT


AREA COMPLETIO
SR. NO. JOB CODE JOB NAME LOCATION PROJECT PO DATE H H STATUS
(sqmt) N TIME
(In Lacks) (mtr) (mtr)
Export Projects
1 Ajay auto agency Jinja, Uganda 2550 110 2 Months Completed
2 Ajay auto agency Jinja, Uganda 9125 231 4 Months Completed
3 Meera enterprise Jinja, Uganda 3250 76 2 Months Completed
4 Fabrimetal Senegal 4600 355 Under progress