DESCRIPTION DATE DRAWN CHECKED


BY BY

942mm (Cirrcumference of
1250 L (Length of the Duct in mm)

in e
a ch
L
g M
in
0
125
d
G rin
w ith
in g
u rr
B
De Step 3. Tack Welding for Setting:
Step 2. Sheet Rolling Step 3A. Surface Cleaning.
Step 1. Sheet profile Cutting for Plain Round Duct TITLE:
Method of Manufacturing GI Welded Plain Duct
CLIENT:
---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 01 Of 03 AIR QUALITY ENGINEERS
REV.NO. DESCRIPTION DATE DRAWN CHECKED
BY BY

Step 3B. Tack Welding followed by Continous Welding

ing
e l d
s W
n o u
o nti
g C
T i
by
wed
o
Foll Step 3C. Flange Fixing & Level setting
c k )
( Ta
n g
e ldi
W
TITLE:
Method of Manufacturing GI Welded Plain Duct
CLIENT:
---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 02 Of 03 AIR QUALITY ENGINEERS
REV.NO. DESCRIPTION DATE DRAWN CHECKED
BY BY

Step 5. Deburring / Surface Grinding on welding area

ing
el d
s w
n o u
nti
C o
T ig
y
edb
o l lw
) f
a ck Step 6. Cleaning of Duct both inside & Out side.
g (T
l d in
W e TITLE:
Method of Manufacturing GI Welded Plain Duct
CLIENT:
Step 4. Welding (Tack) followed by Tig Continous Welding ---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 03 Of 03 AIR QUALITY ENGINEERS
REV.NO. DESCRIPTION DATE DRAWN CHECKED
BY BY

Method of Manufacturing GI Welded Elbow / Reducer / Y Piece, Etc.,

Step 3. Tack Welding for Setting:


Step 3A. Surface Cleaning.

Step 1. GI Sheet profile Cutting for Step 2. Profile Cutting for Elbow Five Segments.

TITLE:
Method of Manufacturing GI Welded Elbow.
CLIENT:
---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 01 Of 03 AIR QUALITY ENGINEERS
REV.NO. DESCRIPTION DATE DRAWN CHECKED
BY BY

Method of Manufacturing GI Welded Elbow / Reducer / Y Piece, Etc.,

Step 3B. Tack Welding followed by Continous


Welding (Longitudinal).

Step 4. Flange Fixing & Level setting


Step 3C. Tack Welding followed by Continous Welding
(Cross Sectional).

TITLE:
Method of Manufacturing GI Welded Elbow.
CLIENT:
---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 02 Of 03 AIR QUALITY ENGINEERS
REV.NO. DESCRIPTION DATE DRAWN CHECKED
BY BY

Method of Manufacturing GI Welded Elbow / Reducer / Y Piece, Etc.,

Step 5. Welding (Tack) followed by Tig Continous Welding


Step 6. Deburring / Surface Grinding on welding area TITLE:
Method of Manufacturing GI Welded Elbow.
Step 7. Cleaning of Duct both inside & Out side.
CLIENT:
---
DWG.NO. SCALE: NTS
DRAWN BY CHECKED BY MATERIAL REV.NO: 0
Ravin Syed Ali Jinnah GI DATE:
11 Feb 2020 western
CONTACT ADDRESS: J/1, Adyar Apartments, 4th Main Road, Kottur Garden,
SHEET.NO.
airducts
Kotturpuram, Chennai 600 085 INDIA (PVT) LTD
Email: info@wad.co.in, Web site: www.wad.co.in 03 Of 03 AIR QUALITY ENGINEERS

You might also like