You are on page 1of 3
TELEPRESENCE ROOM SURVEY PURPOSE OF DOCUMENT Purpose of document isto confirm if room is ready for new Telepresence installation and modification that have to be made for successful Telepresence installation. Approximate Site Survey time should be 1 hour. SITE INFORMATION READINESS CHECKLIST ‘Company / Allequipment has been received ee Address f Network is tested and tive (Mo LAW compugynsel _ Wiki of} C. Marques de Larios 7, 16 Power is available on the installation place City YO Firewall is configured . 'V° pirenell pete Som ROOM AVAILABILITY COMMENTS Sit id 9 eee oe They dont have router yet Hugo Sanchez To: 13 Thee Ra ip respect Saas, te Ad wi Fr avedlable ‘ROOM SPECIFICATIONS (IN CM OR INCHES) NEW SYSTEM LOCATION Afront wall Back wall legs +LAny oe Left wall Right wall Aeayy Floor stand plug Sm fom floor Distance A Distance B Distance C 2K 38nd + 2 leight Room name room 1 RIGHT WALL Room Length Room Width Sm S30 Power availability in Network Location of he power Location of the network room connections sockets on the sockets on the availability installation wall installation wall in the room Table Table Behind the soreen Behind the screen V Front wail Front wall WAlear the screen Avear the screen Back wall Back wall Near the ceiling Near the ceiling U Left wall cert wail Not available Not available Right wall Right wall Wall type [Single layer plaster - 13 mm Ceiling type|Faise ceiling - Plaster Floor type Wood Cable path [External white wall cable raceway & floor raceway pees Cable covers Need Room lightning Noise in the room Obstructions / Lighting is good for VC _/ Noise is at acceptable The room is too level for VC small to fit screen + Lightning needs “nprovements Noise needs to be / Power reduced connections need Lights are dimmable to be moved/ Source of the noise added Window blinds are good to reeeees stop unwanted light cow. Network un spear cutst connections, / Windows blinds need ae need to be impctarene Ces] nen movediadded Other ‘Comments (State any concems that might cause installation issues) Law ETH. Crnecha will be ecb Lifer. No tgs naartae Please state any additional materials that needs to be purchased cablecanal ( [loos eile co VA) Site-Survey checklist ‘Site-survey prior installation Checklist Prior going to installations site survey should be concluded, please fil in following points and circle the correct part Address: : de 7 Room Name: _ yoo YA Ze Contact person nameat ste; Mug Sa chor ‘Retion ‘Comments t cabling Power oullels within 1.5 meters from designated instalation = = Power outlets checked and have electricity (8) | No Network outlets within 1.5 meters from designaied instalation pice is Network outlets tested and network is accessible Yes | & | Routing of cable required undemeath the floor via tunnel? ves | (8) Wall cable cover needed? Length: Ce) | No AS | Floor cable cover needed? Length: S Yes) No Oi | Ti furniture W already In place? (lable, and other furniture cont glee Ea If No expected wher Yes | © 312g Wall readiness Wall material (wood, concrete, plasterboard, other) plaster locarel ] wrea | FN please speciy which screws wil Special sorews required | required: Come Qe) 1s possible to install soreen on 80 em height? @ | we l Mount type Wall Mount ‘Stand mount ‘Any local policies for instalation? ves | (No) Removing of old equipment needed? Yes ® Field engineer name:_MAT/AL MmaAvke Avo pate__ O19 / 2524

You might also like