You are on page 1of 3
TELEPRESENCE ROOM SURVEY PURPOSE OF DOCUMENT Purpose of document is to confirm if a room is ready for new Telepresence installation and modification that have to be made for successful Telepresence installation. Approximate Site Survey time should be I hour. SITE INFORMATION READINESS CHECKLIST Company ui ‘equipment has been received Aéquipment boxes will be stored insidc/ncar the room prior installation ‘Address _ Network is tested andlive (only, wip) C: Marqles eae ASower is available on the installation place City Firewall is configured if ieee. ea ROOM AVAILABILITY COMMENTS Site person name and surname ona No Lav _ no Fu Hugo Sanchez To: 17 mobile TY shh ROOM SPECIFICATIONS (IN CM OR INCHES) NEW SYSTEM LOCATION Front wall ack wall Left wall Right wall Floor stand Distance A Distance B Distance C vile Disance Room name Room 3 Room Length Room Width D. CSrege ae 62 Power availability in Network Location of he power Location of the network room connections ‘sockets on the sockets on the availability installation wall installation wall in the room Table Table Behind the screen Behind the screen Front wall Front wall UNear the screen Near the screen Back wall Back wall Near the ceiling Near the ceiling Left wall Left wall Not available Aiot available Vright wall Right wall Wall type [Wood Ceiling type [False ceiling - Plaster Floor type. Wood Cable path Inside the wall & floor raceway Cable covers [Don't need Room lightning Noise in the room Obstructions Lighting is good for VC Noise is at acceptable The room is too level for VC small to fit screen Lightning needs improvements Noise needs to be Power reduced connections need Lights are dimmable to be moved/ Source of the noise added Window blinds are good to ‘Acondiioning stop unwanted light Network Na anaen connections Windows blinds need See ine need to be improvement Other movediadded Neo blinds Other Comments (State any concems that might cause installation issues) Please state any additional materials that ni is to be purchased Site-survey prior installation 4 ‘Checkt Site-Survey checklist Prior going to installations site survey should be concluded, please fil in following points and cicle the correct part: address: C. Mowgvey As re ee Room Name ben, #3 Contact person name at site: pee Sigs Sacoken ‘Retion ‘Comments Cabling Power oullets within 1.5 meters from designated instalation place @| ® Power outlets checked and have electricity ‘Network outlets within 1.5 meters from designated instalation pe ve | @ | Network outlets tested and network is accessible Ye | Only wpe | | Routing of cable required underneath the floor via tunnel? Yes | Wall cable cover needed? Length: Yes | @ Floor cable cover needed? Length: Yes &) All furniture is already in place? (table, and other furniture a meant to place equipment) ree os | ves | fo) Wall readiness Wal mateal (wood, conere pastetboara, Dre) ] TENo please specify which screws will Speci screws required | NO Please Yes Is it possible to install screen on 80 cm height? Ces) Mount ype Wall Mount Sian mou ‘ny local policies for installation? Yes Removing of old equipment needed? Yes Field engineer name:_MIAT/AS Wwohocytvo Date: 03/19 / 2524 Sensi Interat

You might also like