You are on page 1of 8
de | amily egal gSoly Saudi romeo Engineering & Construction Division InternalNon-Conformance Report (INCR) CONTRACT No.: | FINDINGTITLE: Missing OSHA Approval Document | NCR No.:INCR-FP- | 6600044802 —_| of In Line respirableAjr Filter. COAT-05 — = B.I. NO:10-02016- | WORK LOCATION: WORK LOCATIOI 0020-345 DATE:07-NOV-20 DISCIPLINE: [ cm| MECHANICAL ELECTRICAL coatine | x otuers [_] CODEISTDIDWG 3 4. VIOLATED aa | DINGS OR NON-CONFORMANCE DESCRIPTIO? During surveillance inspection it’s found that in line respirable Air filters utilized by abrasive blaster | during blasting,does not contain any document or tag which proves:its OSHA Approval. Which clearly violates the requirement of SAES-H-004, Para-5.4.2.4, states that “Respirable air-fed abrasive blasting hoods and OSHA-approved in-line respirable air filters shall be utilized at all times by abrasive blasting personnel.” Provide Root cause & Corrective action ORIGINATOR: MAROOF AZAM SIGNATURE:. | = O}-Nov-20 | ee ROOT CAUSE:-Construction team ware about the requirements of OSITA Approval forin-line | | respirable air filters. fo : | CORRECTIVE ACTIOI filters. Proposed ACD:-31-DEC-2020 Mayes We | PREVENTIVE ACTION:-Tool box will be conducted to provide awareness among construction / coating crewabout OSHA approval requirement of in Line Respirable Air filter. ACTIONED BY: consivsfion Team Tos Provided naw Atv len hart Cpr Deyo He manhotun clgete weet OF Air dilien one cheeRed,, de bound Oh fe — DATE: 2¥'NW-50 Feedback by SAPMT:- SIGNATUI — VERIFIED / CONCURRED BY: IPIU/OPIU ebeescisie| Representative SIGNATURE Ox DATE: DAs New 00). | IPIU/OPIU Representative comments (ifany):- Provided equa way Vvehed ard dd Liat at fowl aspobl “he tae fas bac "ell bel a 20) ope OrAleb& of | : Form no.: NC-FRM-02 Rev.1 ‘onstruction team has to provide OSHA Approved in line respirable Air | Repo ee LD ol tl OFFSHORE SERVIC ZAM SC Spgnwdi gSolyt Saudi Aramco Engineering & Construction Division (IN-LINE AIR FILTER WTHOUT TRACEABLE DOCUMENT & TAG) Form no.: NC-FRM-02 Rev. , famil? ¢ Spgousll goth Saudi Aromco NEW OSHA APPROVED IN LINE AIR Form no.: NC-FRM-02 Rev. ‘CLEMCO | isi IMPORTANT: For safe, efficient operation, read and follow the owner's manual (OM: 04143) andseok training for everyone who will use this equipment. OVERVIEW Particulate filter for breathing air sup- plied from a compressed air source. Features pressure regulator, mounting bracket for floor or wall mounting. CPF-20 services one or two oper- ators; CPF-80 services up to four operators. The OPF filter removes: mists, including oil mists, water vapor, and particulates greater in size than (0.5 micron REQUIREMENTS FOR OPERATION Compressed Grade D quality breathing as defined by the Compressed Gas Swaine” BATS eCartridge GPF filter sansa, S12." “ssGap sorew;S/8-NC x1" hexhead 2s Plug, 1":NPT. ‘Washer, 1/2" SAE flat Nut, 1/23-NC Washer 3/8" |. Tee. 3/82. NPT, male branct (only on CPF 20) 22, Nipple, brass, 3/8" NPT x 2° <(only‘on CPF 20) * Replacement parts recommended to be he .. Options and Accessories é Description ‘Stock No. Carbon’ monoxide alarm, CMS-2 session 22894 In-Heimet Carbon monoxide alarm, CMS-3. 24612 Packaging Cardboard container with protective cushioning material Dimensions Unit -Shipping Height: 20-1/2" 23-172" Width (ia): 8-3/4" 12" Depth: 8-3/4" 172" Weight: 18ib 22 Ib Color Red body with black base bracket CLEMO 92220: conti. clemco is commited to contrucus product improvement. Speifealons ae subject o change wthout notice. ‘©2019 Clemco Industries Corp. « One Gable Gar Drive ~ Washiigton, MO 62080 + Phone (886) 230-400 + Fax (800) 726-7559 Stock No, 21963 www.clemcoindustries.com 1295. Rev. 0; 04/2018 Zamil? dyrgnuiti gSolji Saudi Aramco Zamil Offshore Services Co. Ltd.(ZOSCO) OFFSHORE HOOK UP, UPGRADE MODIFICATION, SCADA INSTALLATION AND COMISSIONING SUPPORT,SFNY-107 (BARGE FALCON PEARL) TOOL BOX MEETING Date : — 24+NQU 2000 Location:- SFNY-107 (BARGE FALCON PEARL) Topic:- REQUIREMENT'S OF IN LINE AIR FILTER » PARTICIPANTS Stes. |. NAME =. #HQAMA/ID [JOB No. 2 2 |. | KAMAL UDDIN |-8276610 ( _ = ssi UJIR MAN LIMBU 8738585 | Coating Applicator 3.. | CRISOBALPAPAGAYO |.8798038_ Applicator/Blaster = | 8164468 Crew Supervisor 5. |ANGELLO ARCELLANO | 8803842 | Applicator/Blaster Coating Crew Supervisor Name MURAD ALI TOOL BOX MEETING TOPIC:- Requirement's of in line air filter. ‘These below given points are discussed in the Tool Box Meeting. Prior to start the blasting, crew supervisor shall insure that OSHA approved in-line air filters are used by the blaster at all times. 2. Incase of bad odour coming out from filter, it shall be replaced immediately. 3. The filter shail last only up to three months, so after each three month air filter shall be replaced, Coating QC Supervisor Coating QCI OBJECTIVE EVIDENCE

You might also like