Professional Documents
Culture Documents
Jadual Pembahagian Wim Cu03
Jadual Pembahagian Wim Cu03
EE-320-2:2012-C03/K(1/6)PM EE-320-2:2012-C03/K(1/6)
1. Identify single phase wiring (SEDIA KEPERLUAN PENYELENGGARAAN (SEDIA KEPERLUAN PENYELENGGARAAN
maintenance requirement
PENDAWAIAN) PENDAWAIAN)
EE-320-2:2012-C03/K(2/6)PM EE-320-2:2012-C03/K(2/6)
2. Identify single phase wiring (SEDIA KELENGKAPAN PENYELENGGARAAN (SEDIA KELENGKAPAN PENYELENGGARAAN
tool, equipment and material
PENDAWAIAN) PENDAWAIAN)
3. Carry out electrical wiring EE-320-2:2012-C03/K(3/6)PM EE-320-2:2012-C03/K(3/6)
inspection (PERIKSA PENDAWAIAN SATU FASA) (PERIKSA PENDAWAIAN SATU FASA)
4. Carry out electrical wiring EE-320-2:2012-C03/K(4/6)PM EE-320-2:2012-C03/K(4/6)
maintenance (SELENGGARA PENDAWAIAN SATU FASA) (SELENGGARA PENDAWAIAN SATU FASA)
5. Inspect electrical wiring EE-320-2:2012-C03/K(5/6)PM EE-320-2:2012-C03/K(5/6)
functionality (PERIKSA OPERASI PENDAWAIAN) (PERIKSA OPERASI PENDAWAIAN)
EE-320-2:2012-C03/K(6/6)PM EE-320-2:2012-C03/K(6/6)
6. Record wiring system (REKOD AKTIVITI SELENGGARA (REKOD AKTIVITI SELENGGARA
maintenance activities
PENDAWAIAN SATU FASA) PENDAWAIAN SATU FASA)