Materials of Construction
Materials Specification No. of Units Cost per Unit Total Cost
G.I Pipe Schedule 40, 2’’ x 6 m 14 lengths
2” x 3mm x 6mm x
C purlins 3mm 4 lengths
2’’ x 2mm x 3mm x
Angle Bar 6m 3 lengths
Flat Bar (BI) 1’’ x 3mm x 6m 3 lengths
Steel Matting 4’’ x 8’’ x 5mm 12 sheets
Plastic corrugated
roof White, 10’ 8 sheets
Paint epoxy primer 2 gallons
Paint brush 2.5’’ 4 pieces
Lacquer thinner 2 gal
Cement 3 bags
Sand 12 bags
Gravel 8 bags
Welding Rod Number 11 5 kilograms
Cutting disc Number 4 25 pieces