THANH LONG INDUSTRIAL SERVICE TRADING ONE MEMBER CO.
, LTD
852, DT743A Street, Dong Chieu Quarter, Tan Dong Hiep Ward, Di An City, Binh Duong Province, Viet Nam
Project Leader: Tran Tuan Tu
Start Date: 3/1/2023 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###### ### ### ### ### ### ### ### ### ### ### ### ### ###
Display Week: 1
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Daily Meeting 27-Feb-23 6-Mar-23 13-Mar-23 20-Mar-23 27-Mar-23 3-Apr-23 10-Apr-23
WBS Task Lead Start End Cal. % Note Work
Days Done Days M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 0% 0
1.1 3/22/2023 3/26/2023 0% 3
1.2 0% 0
1.3 0% 0
1.4 0% 0
1.5 0% 0
1.6 0% 0
THANH LONG INDUSTRIAL SERVICE TRADING ONE MEMBER CO., LTD
852, DT743A Street, Dong Chieu Quarter, Tan Dong Hiep Ward, Di An City, Binh Duong Province, Viet Nam
Project Leader: Tran Tuan Tu
Start Date: 3/20/2023 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###### ### ### ### ### ### ### ### ### ### ### ### ### ###
Display Week: 1
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Daily Meeting 20-Mar-23 27-Mar-23 3-Apr-23 10-Apr-23 17-Apr-23 24-Apr-23 1-May-23
WBS Task Lead Start End Cal. % Note Work
Days Done Days M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 BOM List check 55% 0
1.1 - Check Bom list 1006543 Mr.Linh 3/22/2023 3/24/2023 100% 3
1.2 - Check Bom list 1001653 Mr.Linh 3/27/2023 3/30/2023 10%
1.3 - Check Bom list 1068579 Mr.Đa 3/22/2023 3/24/2023 100%
1.4 - Check Bom list 1070185 Mr.Đa 3/27/2023 3/30/2023 10%
2 Order Material Mr.Linh 03/22/23 04/08/23 10% 13
2.1 Order Material for 1006543 Ms.Nguyet 0
2.1.1 Nhôm tấm t=2.3 mm ( 5052 H32 ) Ms.Nguyet
2.1.2 Nhôm tấm t= 2.3 mm ( 5052 H32 ) Ms.Nguyet
2.1.3 Tấm nhựa màu trắng t= 2,36 mm ( Nylon ) Ms.Nguyet
2.1.4 Thép tấm t=0,53 mm ( 1010/1020 25GA ) Ms.Nguyet
2.1.5 RIVET, DOMEHEAD, Ms.Nguyet
GRIP 6.4MM-7.9MM, AL
2.1.6 RIVET, DOME HEAD, Ms.Nguyet
GRIP 3.20MM-4.75MM, AL
2.1.7 RIVET, C'SUNK HEAD, Ms.Nguyet
GRIP 3.20MM-4.75MM, AL
2.1.8 RIVET, C'SUNK HEAD, Ms.Nguyet
GRIP 6.4MM-7.2MM, AL
2.1.9 STUD, SELF CLINCHING, Ms.Nguyet
M4X0.7X 12, STL, ZI(PEM)
2.1.10 NUT,SELF CLINCHING, M5x0.8, STL, ZI(PEM) Ms.Nguyet
2.1.11 NUT,SELF CLINCHING, Ms.Nguyet
M6x1.0, STL, ZI(PEM)
2.1.12 STUD,SELF CLINCHING, Ms.Nguyet
M4X0.7X10,ZI(PEM)
2.1.13 NUT, SELF CLINCHING 8-32, STL, ZI(PEM) Ms.Nguyet
2.1.14 PIN,PILOT,SELF CLINCHING,4X8mm,STL(PEM) Ms.Nguyet
2.1.15 NUT, SELF CLINCHING, Ms.Nguyet
M3 X 0.5 STL, ZI(PEM)
2.1.16 STANDOFF, SELF CLINCHING, Ms.Nguyet
M4X0.7 X 8, STL, ZI(PEM)
2.1.17 PIN, PILOT, SELF CLINCHING, Ms.Nguyet
4 X 16mm, STL(PEM)
2.1.18 M3 MINIATURE SELF Ms.Nguyet
CLINCHING NUT
STANDOFF, SELF CLINCHING,
2.1.19 Ms.Nguyet
M3X0.5 X 16, STL, ZI(PEM)
STANDOFF, SELF CLINCHING,
2.1.20 Ms.Nguyet
M4X0.7 X 4, STL, ZI (PEM)
NUT, SELF CLINCHING,
2.1.21 Ms.Nguyet
M4X0.7, STL, ZI(PEM)
2.2 Order Material for 1068579 Ms.Nguyet 3/23/2023 4/6/2023 0%
2.3
2.4 0% 0
3 Export 2D 0% 0
3.1 - 2D Drawing 1006543 Mr.Linh 3/24/2023 3/30/2023 0% 5
3.1.1 BẢN VẼ BỐ TRÍ CHUNG
3.1.2 BẢN VẼ LẮP RÁP
3.1.3 1006543-1 ( PEDESTAL )
3.1.4 1006543-2 ( BASE PLATE )
3.1.5 1006543-3 ( CHASSIS, SIDE, LEFT )
3.1.6 1006543-4 ( CHASSIS, SIDE, RIGHT )
3.1.7 1006543-5 ( CHASSIS, REAR )
3.1.8 1006543-6 ( CHASSIS, STIFFENER, FRONT, RIGHT )
3.1.9 1006543-7 ( STIFFENER, CHASSIS, FRONT, LEFT )
3.1.10 1006543-8 ( CHASSIS, CHAMBER SUPPORT )
3.1.11 1006543-9 ( CHASSIS, POWER SUPPLY BAY )
3.1.12 1006543-10 ( CHASSIS, POWER ENTRY MODULE BAY )
3.1.13 1006543-11 ( CHASSIS, RAIL, MODULE )
3.1.14 1006543-12 ( CHASSIS, REAR PANEL, CLIP )
3.1.15 1006543-13 ( FOOT, NYLON, BASE, CHASSIS )
3.2 - 2D Drawing 1001653 Mr.Linh 4/1/2023 4/7/2023 0% 5
3.3 - 2D Drawing1068579 Mr.Đa 3/24/2023 3/30/2023 0% 5