0% found this document useful (0 votes)
157 views2 pages

Quotation For Internal & External Work

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views2 pages

Quotation For Internal & External Work

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

REPAIR WORK AT OBAYAN STREET YABA

Dear Sir,

Please find below both the Internal and External repair work.

QUOTATION FOR INTERNAL WORK

S/ DESCRIPTION AMOUNT (₦)


N
1 Remove the old plastering of the affected area in all the 150,000
flats and cart away
2 Re-plaster the affected area (Cement 15bags @ 8,300) 124,500
3 Provide Water Proof Solution 64,000
4 Provide P.O.P cement for re-screeding the affected area 69,000
5 Provide P.O.P paint 72,000
6 Provide Screeding Gum 96,000
7 Paint all the whole surface of the affected wall in all the 845,000
flats – 8 drums of quality paint @ 65,000 (Note: Ceiling
Painting not included)
8 Transportation 50,000
WORKMANSHIP
Mason 250,000
Screeder 200,000
Painter 750,000
Professional Charges 700,000
GRAND TOTAL 3,370,500

QUOTATION FOR EXTERNAL WORK

This includes:

- Change all the spoilt plumbing pipes


- Connect all the A.C. water into soakaway
- Re-Construct crack pillar
- Cast the entire compound

S/ DESCRIPTION AMOUNT (₦)


N
1 Provide 50 bags of Cement @ 8,300 415,000
2 Provide 45tons of Granite 975,000
3 Provide 40tons of Sharp/Sand 330,000
4 Remove the crack pillar cast new base, set new block & 250,000
plaster
5 Break all the crack area on the compound floor to fill the 150,000
vacuum below the hardcore before casting
6 Casting the surface to a depth of 75mm – 100mm 350,000
respectively
TOTAL 2470000

PLUMBING WORK

S/ DESCRIPTION AMOUNT (₦)


N
1 16 Pcs of 4" imported tee @ 1500 24,000
2 30 Length of 4" thick pipe @ 4,500 135,000
3 12 Pcs of 4" imported bend @ 1,200 14,400
4 6 Length of 2" thick pipe @ 2,500 15,000
5 30 Pcs of 2" imported bend @ 250 7,500
6 25 Pcs of 2" imported tee @ 300 7,500
7 20 Length of 1" pipe @ 1,500 30,000
8 10 Pcs of 1" pipe @ 1,500 2,500
9 14 Pcs of 1" tee @ 250 3,500
10 20 Pcs of 1" Socket @ 200 4,000
11 1 Big Abro Gum @ 12,000 12,000
Transportation 20,000
Workmanship 650,000
Supervision On All External Work 650,000
TOTAL 1575400