Workshop Renovation

DE-PK Ventures Nig. Ltd has submitted a proposal for stackyard roof repair works to Exterran Nigeria Ltd, totaling 8,124,750 Naira. The proposal includes mobilization, steel roofwork, side cladding, and roofing sheet installation. The company anticipates a favorable response regarding the project execution.

Uploaded by

ahmed olanite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views2 pages

Workshop Renovation

DE-PK Ventures Nig. Ltd has submitted a proposal for stackyard roof repair works to Exterran Nigeria Ltd, totaling 8,124,750 Naira. The proposal includes mobilization, steel roofwork, side cladding, and roofing sheet installation. The company anticipates a favorable response regarding the project execution.

Uploaded by

ahmed olanite
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DE-PK VENTURES NIG.

LTD
R.C. No. 287513
30B, Birabi Street,
G.R.A Phase 1
Port Harcourt
Rivers State
Tel: 08033385950, 08023307601
E-mail: depk_ventures@[Link]

The Procurement Manager, 05/05/2024


Exterran Nigeria Ltd,
Eneka Road, Port Harcourt.
Dear Sir,

STACKYARD ROOF REPAIR WORKS


Find below our proposed bill for stackyard Roof Repair.

Description Quantity Unit Rate


Amount
A MOBILIZATION TO SITE

Mobilization to site to include Scaffold, Equipment,


1 lump 600000 600,000.00
Personal Protective Equipment

B STEEL ROOFWORK AND SIDE CLADDING

Steel U-Channel (100 x 50 x 10kg/m Mild Steel) 4 Nr 65,000 260,000.00

50 X 50 (5MM) Angle iron side cover 18 Nr 25,000 450,000.00

150 x 50 x 1.2mm thick Z purlins in bolted


25 Nr 22000 550,000.00
connections to receive roofing sheets

12mm Sag rod 10 Nr 12000 120,000.00

Painting of structural steel work 1 lump 135000 135,000.00

Wiremesh cover 1 lump 100000 100,000.00

Consumables (electrodes, gas, and rigs etc) 1 lump 110000 110,000.00

LABOUR, Equipment, personnel/logistics 1 lump 250,000 250,000.00

C ROOF WORK

0.55MM GUAGE COLOURED ROOFING SHEETS

Roofing Sheets 450.5 m 9500 4,279,750.00

Flashing etc 60 m 9500 570,000.00

Installation / include cladding 1 lump 250000 250,000.00

Accessories 1 lump 150000 150,000.00


Sub Total 7,824,750.00

D Contingencies 300,000.00

GRAND TOTAL 8,124,750.00

Amount: Eight Million and One hundred and Twenty Four Thousand Seven Hundred and Fifty Naira
only, before taxes.

Note:
1. We propose the removal of the entire existing roofing sheets with new ones.
2. Construction of Chinese vent Roof on the workshop.
3. Installation of existing roofing sheets on the sides of the workshop for cladding
4.
We look forward to a favourable response from you.

Yours Faithfully,

For: DE-PK VENTURES.

Olanite Ahmed