CHIEF OFFICER HANDOVER AND FIRST DAYS ON BOARD
HANDOVER CHECKLIST
SUBJECTS FOR REVIEW DONE
1 Handover Report & Handover Notes
2 Software Login and Passwords
3 Current port loading Data
4 Sailing Conditions, ammount of:
- Reefer containers
- DG Containers
- OOG's
5 Departure Files and Reports
6 Voyage Instructions:
- Port Rotation
- Reporting
7 Loading program (CD + 2 Hardlocks)
8 Stowage Plan matters:
- Reefer panels (extention cables)
- Gearbox positions
- Blocked cells (stowage special items)
9 Port Information:
- Draft limitations
- Port restrictions (Ballast operations…etc)
- Water density
- Cargo operations (ex.plugging / unplugging)
10 Ballast system:
- Sensors
- Pumps
- Procedure
11 Anti-heeling system:
- Start/Stop limits
- Modes
12 Ballast water treatment system:
- Procedure
- Spares and testing
13 Lashing:
- Last Inventory
- Spares / repair parts.
14 Others:
- IMDG Code, Storck Guide
- Cargo Securing Manual
- Ship Drawings
- DOC
- Ballast Water Management Plan