0% found this document useful (0 votes)
135 views9 pages

Process Validation Report 2019-2021

Uploaded by

jmohamednabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views9 pages

Process Validation Report 2019-2021

Uploaded by

jmohamednabi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PRD/R/04

WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR


REV.NO./DATE:00/

PROCESS VALIDATION - 2019-2020


M/C NAME :
DATE :
M/C NO :

HYDRAULIC PRESSURE AIR PRESSURE


(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
S.NO PARAMETER SETTING VALIDATION RESULT REMARKS
From To From To

1 TRIAL NO. 1

2 TRIAL NO. 2

3 TRIAL NO. 3

4 TRIAL NO. 4

5 TRIAL NO. 5

6 TRIAL NO. 6

7 TRIAL NO. 7

8 TRIAL NO. 8

9 TRIAL NO. 9

10 TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE


PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2019-2020


M/C NAME :
DATE :
M/C NO :

HYDRAULIC PRESSURE FORMING PRESSURE


(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
S.NO PARAMETER SETTING VALIDATION RESULT REMARKS
From To From To

1 TRIAL NO. 1

2 TRIAL NO. 2

3 TRIAL NO. 3

4 TRIAL NO. 4

5 TRIAL NO. 5

6 TRIAL NO. 6

7 TRIAL NO. 7

8 TRIAL NO. 8

9 TRIAL NO. 9

10 TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE


PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2019-2020


M/C NAME :
DATE :
M/C NO :

CYCLE- 01 CYCLE- 02 CYCLE- 03


TRAIL VALIDATION RESULT REMARKS
TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL

TRIAL NO. 1

TRIAL NO. 2

TRIAL NO. 3

TRIAL NO. 4

TRIAL NO. 5

TRIAL NO. 6

TRIAL NO. 7

TRIAL NO. 8

TRIAL NO. 9

TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY

DATE DATE
PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2019-2020


M/C NAME :
DATE :
M/C NO :

TANK 01 TANK 02 TANK 03 TANK 04 TANK 05


TRAIL VALIDATION RESULT REMARKS
TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL TEMP TIME VIB LEVEL

TRIAL NO. 1

TRIAL NO. 2

TRIAL NO. 3

TRIAL NO. 4

TRIAL NO. 5

TRIAL NO. 6

TRIAL NO. 7

TRIAL NO. 8

TRIAL NO. 9

TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE


PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2020-2021


M/C NAME :
DATE :
M/C NO :

AIR PRESSURE GAS PRESSURE


(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
S.NO PARAMETER SETTING VALIDATION RESULT REMARKS
From To From To

1 TRIAL NO. 1

2 TRIAL NO. 2

3 TRIAL NO. 3

4 TRIAL NO. 4

5 TRIAL NO. 5

6 TRIAL NO. 6

7 TRIAL NO. 7

8 TRIAL NO. 8

9 TRIAL NO. 9

10 TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE


PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2020-2021


M/C NAME :
DATE :
M/C NO :

AIR PRESSURE LPG PRESSURE


(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
S.NO PARAMETER SETTING VALIDATION RESULT REMARKS
From To From To

1 TRIAL NO. 1

2 TRIAL NO. 2

3 TRIAL NO. 3

4 TRIAL NO. 4

5 TRIAL NO. 5

6 TRIAL NO. 6

7 TRIAL NO. 7

8 TRIAL NO. 8

9 TRIAL NO. 9

10 TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE


PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2020-2021


M/C NAME :
DATE :
M/C NO :

NITROGEN PRESSURE AIR PRESSURE


CHARGING TIME STAB TIME TESTING TIME RELEASING TIME
(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
TRAIL VALIDATION RESULT REMARKS
FROM TO FROM TO SEC SEC SEC SEC

TRIAL NO. 1

TRIAL NO. 2

TRIAL NO. 3

TRIAL NO. 4

TRIAL NO. 5

TRIAL NO. 6

TRIAL NO. 7

TRIAL NO. 8

TRIAL NO. 9

TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY

DATE DATE
PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2019-2020


M/C NAME :
DATE :
M/C NO :

AIR PRESSURE LPG PRESSURE


HEATING WELDING READY WIRE SUPPLY POS HEATING AIR COOLING
(bar/mbar/Mpa/kg/cm²) (bar/mbar/Mpa/kg/cm²)
TRAIL VALIDATION RESULT REMARKS
FROM TO FROM TO SEC SEC SEC SEC SEC

TRIAL NO. 1

TRIAL NO. 2

TRIAL NO. 3

TRIAL NO. 4

TRIAL NO. 5

TRIAL NO. 6

TRIAL NO. 7

TRIAL NO. 8

TRIAL NO. 9

TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY

DATE DATE
PRD/R/04
WONJIN AUTO PARTS INDIA PVT.LTD, MARAIMALAI NAGAR
REV.NO./DATE:00/

PROCESS VALIDATION - 2020-2021


M/C NAME :
DATE :
M/C NO :

ARGON PRESSURE FLOATING BALL RANGE AMPERE RATING


(bar/mbar/Mpa/kg/cm²) (LPM) (AMP)
S.NO PARAMETER SETTING VALIDATION RESULT REMARKS
From To From To From To

1 TRIAL NO. 1

2 TRIAL NO. 2

3 TRIAL NO. 3

4 TRIAL NO. 4

5 TRIAL NO. 5

6 TRIAL NO. 6

7 TRIAL NO. 7

8 TRIAL NO. 8

9 TRIAL NO. 9

10 TRIAL NO. 10

HAVE YOU UPDATED CONTROL PLAN & SOP : YES / NO

PREPARED BY VERIFIED BY APPROVED BY

DATE DATE DATE