Project Cost Breakdown for Repairs

Uploaded by

janong2426
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project: REWORK AND REDO

Location Brgy. Pandan, Bacnotan, La Union


Total Project cost 99,400.00
Owner : Mrs. Michael Quinn
RE: Bill of materials
Item Item Qty Unit Unit Material Labor Total
# Cost Cost Cost Cost

I Mobilization and Payment of Fees & Bonds


A Mobilization
Mobilization 1.00 lot 5,000.00 5,000.00

Sub-Total 5,000.00

II Repairs and Redo. Just for Additional Costing


A Garage Ceiling - cbm - - 2,000.00 2,000.00
B Moving of Tank - cbm - - -
C Roof and gutter in front - cbm - 3,000.00 2,000.00 5,000.00
D Catch Basin - cbm - - 2,000.00 2,000.00
E Cracks and Blisters 5,000.00 4,000.00 9,000.00
F Wooden Stairs 3,000.00 3,000.00
G Shower Room Fittings and Plugs - cbm - - 5,000.00 5,000.00
H Gates 6,000.00 4,000.00
I Kitchen Cabinet 3,000.00

Sub-Total 26,000.00

III New Work


A Concrete Pavement behind Shop 50.00 sm 380.00 19,000.00 15,200.00 34,200.00
B Shop Works -
Ceiling 25.00 sm 560.00 14,000.00 11,200.00 25,200.00
Electricals 1.00 lot
Repairs 1.00 lot 5,000.00 5,000.00 4,000.00 9,000.00

Sub-Total 68,400.00

TOTAL DIRECT COST 99,400.00

Prepared by : ________________________________________
Ar. MARK JOSHUA C. ALMIROL, UAP Mr. MICHAEL QUINN
PRC # 0046249 OWNER