Project : ROSMARI MAROJAM FIELD DEVELOPMENT PROJECT
Building : CONTRACTOR BUILDING
Element : WBLFL
Item : FOUNDATION
Measured By : KHAIDIR
Date : 01/08/2024
Description No Length Kickers Width Depth of (m)
Fdn. Stump Fdn
(Nos) (M) (M) (M) (M) (M)
Foundation
F1 3 2.750 0.200 2.750 1.000 0.700
F2 1 2.750 0.200 2.550 1.000 0.700
F3 2 2.750 0.200 1.250 1.000 0.700
F3A 3 2.750 0.200 1.250 1.000 0.700
F3B 3 2.750 0.200 1.250 1.000 0.700
TOTAL
Depth of (m) Actual Excavation Concrete Concrete Hardcore
Blinding Hardcore Depth Foundation Blinding
(M) (M) (M) (M3) (M3) (M3) (M3)
0.050 1.75 45.69 15.88 1.31 0.00
0.050 1.75 14.20 4.91 0.41 0.00
0.050 1.75 14.97 4.81 0.43 0.00
0.050 1.75 22.46 7.22 0.64 0.00
0.050 1.75 22.46 7.22 0.64 0.00
8.75 119.77 40.04 3.42 0.00
Sawn Formwork
(M2)
7.70
7.42
5.60
5.60
5.60
31.92
Project : ROSMARI MAROJAM FIELD DEVELOPMENT PROJECT
Building : CONTRACTOR BUILDING
Element : WBLFL
Item : FOUNDATION
Measured By : KHAIDIR
Date : 01/08/2024
For 1 Nos of Foundation
Description No Length Bend Concrete Concrete Concrete Link/Bar
Fdn. Cov (Side) Cov (Top) Cov (Bot) c/c
(Nos) (M) (M) (M) (M) (M) (M)
Foundation
C1/P4
16Y25 10 3.050 0.350 0.050 0.050 0.100
D25@150(T) 3 2.750 0.736 0.050 0.050 0.100 0.150
D25@150(B) 3 2.750 0.736 0.050 0.050 0.100 0.150
D25@150(B) 3 2.750 0.736 0.050 0.050 0.100 0.150
D10 3 2.750 0.736 0.050 0.050 0.100
TOTAL
182MM scale
ndation Total Nos of Foun
Reinf. Bar No. of Total High Tensile (Y) Reinforcement Bar : (KG)
Mark Size Mbars. Length 10 12 16 20 22
(Dia.) (Nos) (M) 0.616 0.888 1.579 2.466 2.984
VERTICAL Y 25 16 54.400
TOP D 25 19 65.463
BOT D 25 19 65.463
BOT D 25 19 65.463
MID D 10 2 6.772 12.51
12.51 0.00 0.00 0.00 0.00
82MM scale
Total Nos of Foundation
(Y) Reinforcement Bar : (KG) M.S ® Stirrups/ Links (M)
25 28 32 40 6 8 10 12
3.854 4.836 6.313 9.869 0.222 0.395 0.616 0.888
2096.58
756.88
756.88
756.88
4367.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total kg: 4379.729