1 Steel As per IS: 1786 2,000 2 Soil Deleterious Content As per IS: 2720 1,200
3 Admixture As per IS: 9103 5,000
4 Cement(OPC/PPC) As per IS: 269 4,000
5 GSB As per MORT&H-400 5,000
6 GSB Permeability Test As per IS: 2720 & IRC 37 3,000
7 Fly Ash for Concrete As per IS: 3812 6,000
8 Pond Ash for Embankment As per IRC-SP:58 25,000
9 Aggregate(10mm/20mm/Sand) As per IS: 383 8,000
10 Deleterious Material of As per IS: 2386 1,200
(C.A/F.A) 11 Aggregate Alkali Reactivity As per IS: 2386 2,000
12 Chloride & Sulphate Content As per IS: 14559 & BS: 1,200 for Concrete 1881 13 Petrography As per IS: 2386 25,000
14 Polished Stone Value As per IS & MORT&H 20,000
15 Construction Water As per IS: 456 1,200
16 Testing and Calibration FTM/CTM 7500
17 Annealed Binding Wire Physical Testing (As per IS:
2500 278) 18 Bentonite As per IS: 2720 & 6186 4000 19 Soil Testing As per IS: 2720 4000 20 Deleterious Material of C.A & As per IS: 2386 1200 F.A 21 Permeability Test for Concrete As per DIN -1048 & 3000 MORT&H 22 Soil for High Embankment As per IRC: 75 10000 23 GSB Permeability Test As per IS: 2720 & IRC: 37 3000 24 Back Fill Material/ Filter Media As per IS: 2720 4000 25 Stone Dust Chemical Testing (As per IS 700 2720(P-37)) 26 Borrow Area Chemical Testing (As per IS 1200 2720(P-27))