WORKING SCHEDULE

RECONSTRUCTION OF CONCRETE ACCESS STAIRCASE TO ACCESS TANK FARM FROM


Project name: GANTRY AREA

Client: TOTAL ENERGY TANZANIA LIMITED


Contractor M/S FEIMAC LIMITED
Date: FROM 21st Sept to 15th Oct 2022
Project Schedule
NUMBER OF WEEK: 1 DAYS
Date

21

22

23

24

26

27
ACTIVITIES

1 MOBILIZATION OF TOOLS, EQUIPMENTS AND INSPECTION. 50%

2 PREPARING OF PHYSICAL BARICATION AND DEMOLITION OF EXISTING STAIR CASE STARTING 0%

3 COLLECTING OF ALL DEBRISS AND FORMWORK SETTING OUT STARTING 0%

4 CONCRETE CAST FOR ACCESS STAIRCASE 0%

5 CURRING PROCESSING 0%

6 FORMWORK REMOVING AND SITE CLEANING


0%

FEIMAC LIMITED Prepared by: Eng Salum Signature:


WORKING SCHEDULE

RECONSTRUCTION OF CONCRETE ACCESS STAIRCASE TO ACCESS TANK FARM FROM


Project name: GANTRY AREA

Client: TOTAL ENERGY TANZANIA LIMITED


Contractor M/S FEIMAC LIMITED
Date: FROM 21st Sept to 15th Oct 2022
Project Schedule
NUMBER OF WEEK: 2 DAYS
Date

26

27

28

29

30

1
ACTIVITIES

1 MOBILIZATION OF TOOLS, EQUIPMENTS AND INSPECTION. 50%

2 PREPARING OF PHYSICAL BARICATION AND DEMOLITION OF EXISTING STAIR CASE STARTING 0%

3 COLLECTING OF ALL DEBRISS AND FORMWORK SETTING OUT STARTING 0%

4 CONCRETE CAST FOR ACCESS STAIRCASE 0%

5 CURRING PROCESSING 0%

6 FORMWORK REMOVING AND SITE CLEANING


0%

FEIMAC LIMITED Prepared by: Eng Salum Signature:


WORKING SCHEDULE

RECONSTRUCTION OF CONCRETE ACCESS STAIRCASE TO ACCESS TANK FARM FROM


Project name: GANTRY AREA

Client: TOTAL ENERGY TANZANIA LIMITED


Contractor M/S FEIMAC LIMITED
Date: FROM 21st Sept to 15th Oct 2022
Project Schedule
NUMBER OF WEEK: 3 DAYS
Date

8
ACTIVITIES

1 MOBILIZATION OF TOOLS, EQUIPMENTS AND INSPECTION.


50%

2 PREPARING OF PHYSICAL BARICATION AND DEMOLITION OF EXISTING STAIR CASE STARTING 0%

3 COLLECTING OF ALL DEBRISS AND FORMWORK SETTING OUT STARTING 0%

4 CONCRETE CAST FOR ACCESS STAIRCASE 0%

5 CURRING PROCESSING 0%

6 FORMWORK REMOVING AND SITE CLEANING


0%

FEIMAC LIMITED Prepared by: Eng Salum Signature:


WORKING SCHEDULE

RECONSTRUCTION OF CONCRETE ACCESS STAIRCASE TO ACCESS TANK FARM FROM


Project name: GANTRY AREA

Client: TOTAL ENERGY TANZANIA LIMITED


Contractor M/S FEIMAC LIMITED
Date: FROM 21st Sept to 15th Oct 2022
Project Schedule
NUMBER OF WEEK: 4 DAYS
Date

10

11

12

13

14

15
ACTIVITIES

1 MOBILIZATION OF TOOLS, EQUIPMENTS AND INSPECTION.


50%

2 PREPARING OF PHYSICAL BARICATION AND DEMOLITION OF EXISTING STAIR CASE STARTING 0%

3 COLLECTING OF ALL DEBRISS AND FORMWORK SETTING OUT STARTING 0%

4 CONCRETE CAST FOR ACCESS STAIRCASE 0%

5 CURRING PROCESSING 0%

6 FORMWORK REMOVING AND SITE CLEANING 0%

FEIMAC LIMITED Prepared by: Eng Salum Signature: